- The Complete Research Material is averagely 39 pages long and it is in Ms Word Format, it has 1-5 Chapters.
- Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
- Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
- Full Access Fee: ₦6,000
Get the complete project »
ABSTRACT
This project was aimed at providing an Auxilary water supply in the Department of Agricultural and Bio-Environmental Engineering. A reconuaissance survey was carried out to determine the route of the pipeline of which white diamond pipe 1 inch with length of 5.5 meter was used. The procedure for the installation are excavation of trench, laying of pipes and mounting of overhead tank. The installation was carried out with the use of a digger and shovel. The pipes were laid along with some fitting to cling the pipes to the centrifugal pump. While the supply pipe from the water sources was connected to the inlet of the centifrigal pump. Testing was carried out to check if there was any leakage. It was well comfirm that no any leakage along the auxiliary water supply and the pump was connected. The total amount spend was N73.920.
TABLE OF CONTENTS
Title Page - - - - - - - - - - i
Declaration - - - - - - - - - - ii
Approval Page- - - - - - - - - - iii
Dedication- - - - - - - - - - - iv
Acknowledgement - - - - - - - - - v
Abstract - - - - - - - - - - - vi
Table of Contents - - - - - - - - - vii
CHAPTER ONE
1.0 Introduction- - - - - - - - - 1
1.2 Statement of Problem - - - - - - - 1
1.3 Aim - - - - - - - - - - 2
1.4 Objectives - - - - - - - - - 2
1.5 Significant of the Study - - - - - - - 3
1.6 Scope of the Study - - - - - - - - 3
CHAPTER TWO
2.0 Literature Review - - - - - - - - 4
2.1 Quality of Ground Water - - - - - - - 5
2.2 Purification of Ground Water by Soil- - - - - - 6
2.3 Exploitation of Groundwater- - - - - - - 7
2.4 Stages in Water Borehole Drilling Process - - - - 7
2.5 Borehole Drilling Method- - - - - - - 11
2.6 Borehole Drilling and Installation- - - - - - 12
2.7 Borehole Design and Instalation- - - - - - 13
2.8 Types of Pump - - - - - - - - 13
2.9 Pipe Selection- - - - - - - - - 14
2.10 Types of Pipes- - - - - - - - - 15
2.11 The Importance of Borehole- - - - - - - 16
CHAPTER THREE
3.0 Method and Materials- - - - - - - - 17
3.1 Excarvation of Trench - - - - - - -
You either get what you want or your money back. T&C Apply
You can find more project topics easily, just search
-
SIMILAR AGRICULTURAL ENGINEERING FINAL YEAR PROJECT RESEARCH TOPICS
-
1. SAFETY IN AGRICULTURAL ENGINEERING WORKSHOP, FIELD OPERATIONS AND LABORATORIES
» ABSTRACT Agriculture ranks among the most hazardous industries and includes growing and harvesting crops such as corn, cotton, soybeans, and fruit, as...Continue Reading »Item Type & Format: Project Material - Ms Word | 96 pages | Instant Download | Chapter 1-5 | AGRICULTURAL ENGINEERING DEPARTMENT
-
2. PHYSICAL AND MECHANICAL PROPERTIES OF NERICA PADDY (RICE)
» Abstract The determination of the physical and mechanical properties of NERICA paddy (FARO's 44(SIPI), 51(Isadane), 52(WITA 40) and 57(TOX4004 43 1 2 ...Continue Reading »Item Type & Format: Project Material - Ms Word | 58 pages | Instant Download | Chapter 1-5 | AGRICULTURAL ENGINEERING DEPARTMENT
-
3. INSTALLATION OF A CROP PROCESSING SIDE LABORATORY IN THE AGRICULTURE AND BIO ENVIRONMENTAL ENGINEERING DEPARTMENT
» ABSTRACT The crop processing side laboratory dealt with in this project ,or involved in this project, was initiated for a long period in this departme...Continue Reading »Item Type & Format: Project Material - Ms Word | 39 pages | Instant Download | Chapter 1-5 | AGRICULTURAL ENGINEERING DEPARTMENT
-
4. CONSTRUCTION OF BOREHOLE IN AGRICULTURAL AND BIO-ENVIRONMENTAL ENGINEERING DEPARTMENT
» TABLE OF CONTENT Title page i Declaration ii Approval page iii Dedication iv Acknowledgement v Table of content vi Abstract vii CHAPTER ONE 1.0 Backgr...Continue Reading »Item Type & Format: Project Material - Ms Word | 34 pages | Instant Download | Chapter 1-5 | AGRICULTURAL ENGINEERING DEPARTMENT
-
5. REHABILITATION OF THREE BELDING BOTTOM DISC PLOUGH
» ABSTRACT The Rehabilitation of 3 Belding bottom disc plough implement involved was in this project. The bearing for the disc carries, disc, bolts and ...Continue Reading »Item Type & Format: Project Material - Ms Word | 30 pages | Instant Download | Chapter 1-5 | AGRICULTURAL ENGINEERING DEPARTMENT
-
6. POST HARVEST GRAIN LOSS: A MAJOR LOSS TO NATIONAL FOOD SECURITY
» ABSTRACT Grains may be lost in the pre harvest, harvest, and post harvest stages. Pre harvest losses occur before the process of harvesting begins, an...Continue Reading »Item Type & Format: Project Material - Ms Word | 25 pages | Instant Download | Chapter 1-5 | AGRICULTURAL ENGINEERING DEPARTMENT
-
7. INSTALLATION OF WATER DISTRIBUTION SYSTEM IN THE DEPARTMENT OF AGRICULTURAL AND BIO-ENVIRONMENTAL ENGINEERING
» TABLE OF CONTENT Tittle page i Declaration ii Approval page iii Dedication iv Acknowledgement v Abstract vi CHAPTER ONE 1.0 Introduction 1 1.1 Backgro...Continue Reading »Item Type & Format: Project Material - Ms Word | 31 pages | Instant Download | Chapter 1-5 | AGRICULTURAL ENGINEERING DEPARTMENT
-
8. DEVELOPMENT OF AN INJECTOR NOZZLE TESTER FOR SPARK IGNITION ENGINE.
» CHAPTER ONE 1.0 Introduction The top of the injector nozzle has a lot of holes to deliver a spray of diesel/petrol fuel into the cylinder. The higher ...Continue Reading »Item Type & Format: Project Material - Ms Word | 48 pages | Instant Download | Chapter 1-5 | AGRICULTURAL ENGINEERING DEPARTMENT
-
9. EFFECT OF QUARRY DUST ON THE ENGINEERING PROPERTIES OF LATERITIC SOILS
» ABSTRACT This research work involves the improvement of the engineering properties of laterite soil by stabilization with quarry dust on fines. The la...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | AGRICULTURAL ENGINEERING DEPARTMENT
-
10. ECONOMIC ANALYSIS OF DEFORESTATION IN ENUGU STATE, NIGERIA
» ABSTRACT The study provided an economic analysis of the losses from deforestation in Enugu State of Nigeria. Specifically, the study evaluated the eff...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | AGRICULTURAL ENGINEERING DEPARTMENT