- The Complete Research Material is averagely 52 pages long and it is in Ms Word Format, it has 1-5 Chapters.
- Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
- Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
- Full Access Fee: ₦6,000
Get the complete project »
ABSTRACT
This project is concerned write the identification of those defects that are found in most of the drawing tables in the Mechanical Engineering drawing studio.
The report investigates the possible ways through which the mentioned above can be brought back to normal standard for usage ins the department.
Defects comes up due to inability to renovate and also inability of proper usage.
There may be scratches over the table top, breakage in the legs joining or even breakages in the joints found before the tabletop. Before renovating, the location of the symptom and the kind of materials involved are put into consideration.
At the end of the every defect, the renovation of that actual defect is discussed in this project.
TABLE OF CONTENTS CHAPTER ONE
1.0 introduction
1.1 Aim of the project
1.2 Objectives of the project
1.3 Scope of the study
CHAPTER TWO
2.0 literature review
CHAPTER THREE
3.0 Specification of problems
3.1 history and background of information
3.2 Condition of use
3.3 Characteristics
3.4 Appearance (aesthetic)
3.5 Performance
3.6 Reliability and life
CHAPTER FOUR
4.0 material selection
CHAPTER FIVE
5.0 construction details
CHAPTER SIX
6.0 cost analysis
6.1 Material cost
6.2 Labour cost
6.3 Miscellaneous cost
6.4 Market cost
6.5 Market cost of product (over all)
CHAPTER SEVEN
7.0 testing and evaluation
CHAPTER EIGHT
8.0 recommendation
8.1 Conclusion
8.2 Bibliographical references
8.3 Working diagrams
CHAPTER ONE
INTRODUCTION
The term refurbishing has been defined in many ways by many experts from both building, and furniture perspective.
The oxford advance learners dictionary definition of refurbishing is the widely and a generally accepted definition of refurbishing.
It defines refurbishing as the work embark or undertaken in order to clean and decorate a room, building or in order to make it more attractive and more useful. This simply means a programme transformation of a particular place or thing at a point in time.
The drawing studio requires special consideration to preserve the original studio nature after it has deteriorated, and repair work at different period must be considered when the new defects are first discovered, when this is being considered recently, it can serve as a remedy towards breakage of tables and the deterioration of the studio.
These may be wrongly diagnosed, consequently, the remedies for refurbishing prescribed the drawing studio may fall and further experience and investigation leads to effective remedies or maintenance strategies.
Refurbishing is sub divided into three types and these are
1. Life style refurbishing: This involves improving a home and a way of life. It might involve building a sunroom for pleasure or converting unused attic space into living quarters to meet ones changing needs.
2. Retroit Projects Refurbishing: This usually focuses on home shells or mechanical systems such as
i. Upgrading an insulation system
ii. Putting on new siding
iii. Replacing a furnace
3. Maintenance and Repair Refurbishing: This project the investment found in a house, workshop, or a room through activities such as:
i. Repair of furniture
ii. Caulking windows
iii. Reshingling roofs
iv. Replacing equestronughs
AIM OF THE PROJECT
The basic aim of this project is to identify the importance of refurbishing in our institutions of higher learning, and also to know the correct types to be used at any point in time.
OBJECTIVE OF THE PROJECT
The objectives of the project are as follow
1. To know the importance or refurbishing
2. To improve the understanding rate of the users of the project, by making them feel comfortable whenever there are in the drawing studio.
3. To help bring back to the departmental acceptance of the standard of the drawing studio.
SCOPE OF THE STUDY
This project “Refurbishing of the Mechanical Engineering Drawing Studio.
This project is further limited to the Mechanical Engineering Drawing Studio, which might equally serve as a case study. And because of this, we will only consider here, the refurbishing of the Mechanical Engineering Drawing Studio.
You either get what you want or your money back. T&C Apply
You can find more project topics easily, just search
-
SIMILAR MECHANICAL ENGINEERING FINAL YEAR PROJECT RESEARCH TOPICS
-
1. CONSTRUCTION OF OFFICE TABLE
» ABSTRACT Furniture refers to movable objects intended to support various human activities such as sitting for chairs, Stools and Sofas, eating and rea...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | MECHANICAL ENGINEERING DEPARTMENT
-
2. DISTRIBUTIONAL PATTERN OF AUTOMOBILE MECHANIC WORKSHOP IN IBADAN NORTH LOCAL GOVERNMENT, OYO STATE
» CHAPTER ONE INTRODUCTION Automobile Industry can be refers to as the collection of firms that produce, manufacture broadly automobiles using the same ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | MECHANICAL ENGINEERING DEPARTMENT
-
3. IMPLEMENTING TOTAL PRODUCTION MAINTENANCE IN NIGERIA MANUFACTURING COMPANY (DELTA STEEL COMPANY AS A CASE STUDY)
» ABSTRACT Companies around the world spend a lot of money on buying new equipment to increase production but a little is done to get hundred percent ou...Continue Reading »Item Type & Format: Project Material - Ms Word | 93 pages | Instant Download | Chapter 1-5 | MECHANICAL ENGINEERING DEPARTMENT
-
4. DESIGN AND CONSTRUCTION OF AN EXTERNAL CALIPER
» CONSTRUCTION OF AN EXTERNAL CALIPER Table of contents Title page Chapter one Introduction Background CHAPTER TWO: LITERATURE REVIEW CHAPTER THREE: MET...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | MECHANICAL ENGINEERING DEPARTMENT
-
5. MODELING AND EVALUATION OF A PASSIVE FLAT-PLATE SOLAR COLLECTOR
» ABSTRACT Background: Maternal mortality is an enormous public health burden in developing countries of the world. Birth preparedness and emergency rea...Continue Reading »Item Type & Format: Project Material - Ms Word | 157 pages | Instant Download | Chapter 1-5 | MECHANICAL ENGINEERING DEPARTMENT
-
6. DESIGN AND CONSTRUCTION OF FUELLESS GENERATOR
» CHAPTER ONE 1.0 INTRODUCTION 1.1 Background of the study The desire and search for knowledge by man has resulted to various changes in his life and hi...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | MECHANICAL ENGINEERING DEPARTMENT
-
7. THE IMPACT OF JET APPARATUS
» ABSTRACTThis project is focused on experimental analysis of impact of water jet on vanes. This work intends to predict the output of a pelton wheel, a...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | MECHANICAL ENGINEERING DEPARTMENT
-
8. DESIGN AND FABRICATION A CORN SHELLING MACHINE
» CHAPTER ONE INTRODUCTION The project “Design and fabrication a corn shelling machine” is indeed an essential one in a time like this when ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | MECHANICAL ENGINEERING DEPARTMENT
-
9. STRATEGIES FOR IMPROVING STUDENTS’ PERFORMANCE IN WELDING AND FABRICATION TECHNOLOGY IN TECHNICAL COLLEGES OF KADUNA STATE
» TABLE OF CONTENTS Title page i Approval page ii Declaration iii Dedication iv Acknowledgement v Table of contents vi Abstract viii CHAPTER ONE: INTROD...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | MECHANICAL ENGINEERING DEPARTMENT
-
10. DESIGN AND FABRICATION OF A DUST EXTRACTOR
» ABSTRACTMan’s imp act on global environment system especially in the area of dust extraction is now at a scale where it is disrupting. These dust ex...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | MECHANICAL ENGINEERING DEPARTMENT