CHAPTER ONE
INTRODUCTION
1.0 Background of the study
The growing need for construction of all types coupled with a tight monetary supply has provided the construction industry with a big challenge to cut cost.
According to Mendelson and Greenfield (1996) the remaining part of the twentieth century would involve corporations, institutions and government in a race to survive. The attendant dwindling economic fortune of nations economies around the World have geared up the participant in these sectors (the client in particular) to take up the challenge of ensuring efficient use of their resources to obtain value for money in terms of performance.
The total cost of construction in normal circumstances is expected to be the sum of the following cost: Materials, Labour, Site Overheads, Equipment/Plant, Head office Cost and Profit but in many parts of the world particularly in Nigeria, there are other costs to be allowed for.
These costs according to Mbachu and Nkado (2004) have obvious negative implications for the key stakeholders in particular, and the industry in general. To the client, high cost implies added costs over and above those initially agreed upon at the onset, resulting in less returns on investment. To the end user, the added costs are passed on as higher rental / lease costs or prices. To the consultants, it means inability to deliver value - for - money and could tarnish their reputation and result in loss of confidence reposed in them by clients. To the contractor, it implies loss of profit through penalties for non- completion, and negative word of mouth that could jeopardize his/her chances of winning further jobs, if at fault.
The proposed work will investigate and report the other costs to be allowed for, which are the basic factors affecting construction cost in Nigeria and also proffer solutions to how construction cost can be minimized.
1.1 Statement of the Problem
The demand for more construction of all types, coupled with a tight monetary supply has provided the construction industry with a big challenge to cut costs. The problem of high contract costs of all aspects of construction is becoming obvious. Consequently, substantial increases are being observed in projects.
This substantial increase has brought about loss of client confidence in consultants, added investment risks, inability to deliver value to clients, and disinvestment in the construction industry.
1.2 Aim and Objectives of the study
The aim of the study is to find out the factors affecting construction cost in Nigeria and proffer solutions to how construction cost c an be minimized.
The objectives of the study are as follows:
1. To identify the main factors affecting construction cost in Nigeria.
2. To determine the severity rank of the factors amongst clients, consultants and contractors.
3. To determine the agreement ranking factors between clients, consultants and contractors.
4. To proffer solutions on how to minimize construction cost in Nigeria.
1.3 Research Hypotheses
To test the hypothesis:
1 (a). Ho: Contractors and Clients do not generally agree on the severity rank of the factors affecting construction cost in Nigeria
1 (b). H1: Contractors and Clients generally agree on the severity rank of the factors affecting construction cost in Nigeria
2 (a). Ho: Clients and Consultants do not generally agree on the severity rank of the factors affecting construction cost in Nigeria
2. (b) H1: Clients and Consultants do not generally agree on the severity rank of the factors affecting construction cost in Nigeria
3. (a) Ho: Consultants and Contractors do not generally agree on the severity rank of the factors affecting construction cost in Nigeria
3. (b) H1: Consultants and Contractors generally agree on the severity rank of the factors affecting construction cost in Nigeria
1.4 Significance of the study
An assessment of the study would enable Clients, Contractors and Consultants give an economic approach to construction work such that they would be able to identify the dominating factors leading to high construction cost in Nigeria.
The application of the solutions proffered to minimizing construction cost would restore client’s confidence in consultants, reduce investment risks, and generally boost the viability and sustainability of the industry
1.5 Scope and Delimitations
The scope of this research is limited to identification of essential factors affecting construction cost and proffering solutions on how to reduce construction cost in Nigeria. The study is limited to projects in the Lagos metropolis of Nigeria because there is easy access of information in the Lagos metropolis by the researcher.
Target respondents for this study are the principal actors in the construction industry namely: the Client, the Consultant and the Contractor.
You either get what you want or your money back. T&C Apply

You can find more project topics easily, just search
-
SIMILAR BUILDING TECHNOLOGY FINAL YEAR PROJECT RESEARCH TOPICS
-
1. THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA (A CASE STUDY OF ENUGU STATE)
» ABSTRACT This project is purposely for determining the effects of delay and disruption on the cost of building construction project in Nigeria, ascert...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
2. COMPARATIVE STUDY OF THERMAL PROPERTIES OF SOME COMMON ROOFING MATERIALS IN NIGERIA
» ABSTRACT Thermal properties refer to characteristics of a material defining the substance and related to temperature dependent. The most important thi...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
3. EFFECT OF AGGREGATE SIZES ON CONCRETE STRENGTH
» CHAPTER ONE INTRODUCTION 1.1 Background of study It is well recognized that coarse aggregate plays an important role in concrete. Coarse aggregate typ...Continue Reading »Item Type & Format: Project Material - Ms Word | 103 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
4. ENVIRONMENTAL FACTORS INFLUENCING CONSTRUCTION TIME AND COST OVERRUNS ON HIGH-RISE PROJECT IN NIGERIA
» CHAPTER ONE INTRODUCTION 1.0 Background of the study The expanding need for building of all kinds, coupled with a tight financial supply has offer the...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
5. THE CHALLENGES OF REDUCING LABOUR COST IN NIGERIA BUILDING INDUSTRY (A case study of osun state)
» ABSTRACT The aim of this research was to identify and rank, according to relative importance, factors affecting high cost of labour in Nigerian buildi...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
6. APPLICATION OF GEOINFORMATIC TECHNIQUES IN CONTROLLING FLOODING IN VULNERABLE ROADS AND BUILDINGS IN NIGERIA
» CHAPTER ONE INTRODUCTION 1.1 Background to the Study The acronym GIS stands for geographic information system, it is a system which allows a capture, ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
7. REHABILITATION OF WALL SURFACE PAINTING TO BUILDING WORKSHOP OF KADUNA POLYTECHNIC,
» ABSTRACT This project work is based on the rehabilitation paint and decorating of external side wall of the workshop including its toilet, its cleared...Continue Reading »Item Type & Format: Project Material - Ms Word | 36 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
8. MODELLING THE EFFECTS OF HIGHWAY GEOMETRIC ELEMENTS ON HIGHWAY ACCIDENT
» CHAPTER ONE INTRODUCTION Background Traffic accidents have been recognized as one of the major causes for human and economic losses both in developed ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
9. ANALYSIS OF FACTORS INFLUENCING MATERIAL WASTAGE ON BUILDING SITE IN NIGERIA (A Case Study of Kaduna State)
» ABSTRACT Having the necessary skill, ability, knowledge in minimizing wastage of materials on building is a goal to which every building firm no matte...Continue Reading »Item Type & Format: Project Material - Ms Word | 61 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
10. APPRAISAL OF BUILDING MAINTENANCE PRACTICE AMONG LANDLORDS IN NIGER CENTRAL SENATORIAL ZONE OF NIGER STATE
» TABLE OF CONTENTS Title page i Declaration ii Approval page iii Dedication iv Acknowledgement v Table of contents vi Abstract viii CHAPTER ONE: INTROD...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT