ABSTRACT
This work studied the retraining of professional builders in the Nigerian construction industry. The study identified the key areas of professional practices of a builder, the skills and competencies required by professional builder, the means of developing professional builders for continuous improvement and benefits of continuing professional development for a professional builder. A survey research method was adopted after a literature search has been done on the subject. A total of forty (40) questionnaires were distributed by hand to professional builders in various areas of practice in Enugu and Anambra State. A 100% questionnaire response was achieved. Data obtained from the questionnaire were presented and analyzed using frequency tables and percentages. Quantitative and descriptive analysis were also done, while mean score index was used to find the mean score values of the responses of the respondents based on five (5) point likert scale. The result was used to evaluate the answers to the research questions and objectives. It was found that professional builders have the capacities to practice in variety
CHAPTER ONE
INTRODUCTION
1.1 BACKGROUND OF THE STUDY.
The act of Building can be traced back to the biblical creations. The professionalization of Building materialized when the Chartered Institute of Building (CIOB) was established in UK in 1934. Over a century later, specifically in1967, the profession of Building was inaugurated in Nigeria by the Nigerian Institute of Building (NIOB), as the first Oversea centre of the UK Chartered Institute of Building (CIOB). However, the Nigerian Institute of Building (NIOB) gained its autonomy from the CIOB in May, 1970. After many years of successful and recognized activities, the Institute gained its statutory backing of the profession by obtaining the Builders (Registration, etc). Degree No. 45 of 1989 (now Act Cap B13, LFN, 2004), from the Federal Government of Nigeria.
The scope of training a professional builder and the study of building programme is contained under the current minimum education standard approved by the National University Commission (NUC) and Nigeria Institute of Building
10
(NIOB) and Council of Registered Builders of Nigeria (CORBON) guidelines.
The need for retraining of professional builders is occasioned as a result of constant change in technology, practice and management of building production and construction industry in general. In response to this, Ademoroti (1997) sees the need to establish a culture of learning through study and experience, self improvement and commitment to enhance the building industry’s products and services. When counted the numerous importance of construction industry to the nations economy (Wahab, 2005, Akanni, 2001, Husseini, 1991), one will see the need for adequate training and retraining of professional builders in the construction industry.
According to Kontagora (1991), the failure of the construction in this country including the professions, depends on their education and training of all levels, if contracting is to gain prestige and build up a properly trained labour force. He further suggested that an area that should be examined is the issue of continuing professional development
11
(CPD) which should now becomes the focus in the construction industry. Then to keep abreast of new developments in technology and management and also broaden the knowledge of building professionals, a mix of work experience, and continuing education and training is of utmost importance.
1.2 STATEMENT OF PROBLEM
According to Obiegbu (2001), human resources for the construction industry appear in many varieties, styles, sizes and other attributes; some are of professional status; some technical; while others are skilled, semi-skilled and unskilled. Any attempt to neglect the development and continuous existence of any of these is detrimental to the overall success of construction industry.
The Nigeria today construction industry has been regarded as an avenue for human tragedies and losses. The sequential incessant of building collapse all over the nation, the poor quality of building works, the high rate of litigation and increasingly clients dissatisfaction all are evidence of
12
technological and managerial mismatch in the construction industry.
Vishwakarma (2008) observed that due to globalizing economy, students pursuing technical degree programs including those related to competence in construction industry, may not be adequately educated to meet the demand that will be expected out of their profession during the next decade in the on going changing scenario worldwide.
Wahab (2005) and Ogunbiyi (2004) noted that Nigerian construction industry is being dominated by foreign players, leaving the ingenuous contractors with virtually nothing. This can be attributed to technological and managerial deficiency of the Nigerian construction professionals. It is on this premise that the construction industry council in 2006, acknowledge and provides the guidance on continuing professional Development (CPD) for individual professionals. Their employers, and the professional Institutions in the construction industry, hence the need for retraining of building professionals in the Nigerian construction industry.
13
1.3 RESEARCH AIM AND OBJECTIVES
The sole aim of this research work is to find out the need for retraining of professional builders in the Nigerian construction industry. In the course of this study, the following objectives are expected to be met.
1. To find our core areas of practice of professional builders.
2. To find out the areas/skills in which professional builders are in dare need of retraining and updating.
3. To determine the workable processes or means of retraining professional builders.
4. To determine the benefits of retraining professional
builders on construction industry
1.4 SCOPE AND LIMITATIONS OF THE STUDY.
This study covers only the ambit of the professional builders’ practices in the construction industry. It does not in any way cover other professionals in the building or construction industry but can only highlight such where necessary. It is concentrated on the area of training and
14
retraining of a professional builder. The study is carried out
on professional builders in Enugu State and Anambra State.
You either get what you want or your money back. T&C Apply
You can find more project topics easily, just search
-
SIMILAR BUILDING TECHNOLOGY FINAL YEAR PROJECT RESEARCH TOPICS
-
1. ASSESSMENT OF FACTORS INFLUENCING CONTRACTORS BIDDING SUCCESS FOR CONTRUCTION PROJECT IN LAGOS
» CHAPTER ONE1.0 INTRODUCTION1.1 BACKGROUND OF STUDYConstruction activities is older than every activities and development in Nigeria and the rest of th...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
2. APPRAISAL OF BUILDING MAINTENANCE PRACTICE AMONG LANDLORDS IN NIGER CENTRAL SENATORIAL ZONE OF NIGER STATE
» TABLE OF CONTENTS Title page i Declaration ii Approval page iii Dedication iv Acknowledgement v Table of contents vi Abstract viii CHAPTER ONE: INTROD...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
3. THE EFFECT OF COST OF ROOF ON THE TOTAL COST OF A BUILDING. A CASE STUDY OF SOME SELECTED BUILDINGS IN AWKA SOUTH- ANAMBRA STATE
» ABSTRACT The research looked at the effect of cost of roof on the total cost of a building (A case study of some selected buildings in Awka South, Ana...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
4. EFFECTIVE MATERIAL MANAGEMENT IN BUILDING CONSTRUCTION SITE.
» CHAPTER ONE:1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Resea...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
5. FRAMEWORK FOR IMPLEMENTATION OF GREEN TECHNOLOGY PRACTICES FOR SUSTAINABLE INFRASTRUCTURAL DEVELOPMENT IN AKWA IBOM STATE
» TABLE OF CONTENT CONTENTS PAGE Title Page i Declaration ii Certification iii Dedication iv Acknowledgement v Table of Contents vi List of Tables ix Li...Continue Reading »Item Type & Format: Project Material - Ms Word | 30 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
6. PROJECT TIME CONTROL IN BUILDING CONSTRUCTION
» ABSTRACT Everyday life on bridge construction sites is commonly characterized by enormous pressure due to time and costs as well as difficult logistic...Continue Reading »Item Type & Format: Project Material - Ms Word | 67 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
7. EFFECTS OF AGGREGATE SIZES ON THE CONCRETE STRENGTH
» ABSTRACT In the sense that the materials involved in this project were capital intensive more especially cement, so in carrying out the work one must ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
8. BUILDING FAILURE AND COLLAPSE IN NIGERIA: THE INFLUENCE OF THE INFORMAL SECTOR
» Abstract The occurrence of building failure and collapse has become a major issue of concern in the development of this nation as the magnitudes of th...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
9. ENVIRONMENTAL FACTORS INFLUENCING CONSTRUCTION TIME AND COST OVERRUNS ON HIGH-RISE PROJECT IN NIGERIA
» CHAPTER ONE INTRODUCTION 1.0 Background of the study The expanding need for building of all kinds, coupled with a tight financial supply has offer the...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
10. EVALUATING THE EFFECTIVENESS OF PROJECT DELIVERY METHODS IN SOUTH-EAST NIGERIA
» ABSTRACT This research studied “evaluating the effectiveness of project delivery methods in South East Nigeria”. There are alternatives de...Continue Reading »Item Type & Format: Project Material - Ms Word | 133 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT