- The Complete Research Material is averagely 52 pages long and it is in Ms Word Format, it has 1-5 Chapters.
- Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
- Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
- Full Access Fee: ₦6,000
Get the complete project »
![Download Code Ready Instant Download Active](https://codemint.net/assets/home/instantdownloadMain.png)
CHAPTER ONE
INTRODUCTION
1.1 Relevance of project
1.2 Site inspection
1.3 Evolution of road network in nigeria
1.4 Motor vehicle characteristic that affects road design data
1.5 Drivers and their characteristics
1.6 Reconnaissance survey
1.6.1Chain survey
1.6.2Station marking
1.7 Factors Affecting Choice Of Station
CHAPTER TWO
THEODOLITE TRANSVERSING OF THE ROAD CONTROL
2.1 Definitions
2.2 Thetheodolite
2.3 Theodorite adjustment
2.3.1Temporary adjustment
2.3.2Permanent adjustment
2.4 Procedure for theodolite traversing
2.5Materials used for the theodolte traversinging
CHAPTER THREE
PROJECT FIELD LEVELING WORK
3.1 Leveling
3.2 Profile leveling
3.3 Cross leveling
3.4 Objectives of leveling
3.5 Instruments used in leveling
3.6 Temporary adjustment of leveling instrument
3.7 Definition of some leveling terminologies
3.8 Leveling book
3.9 Earthwork computation
3.9.1Method
CHAPTER FOUR
SOIL ANALYSIS
4.1 Collection and preliminary preparation of samples
4.2 Mechanical analysis
4.3 Atterberg/consistency limit tests
4.3.1Liquid limit test
4.3.2Plastic limit test
4.4 Compaction test
4.5 The California bearing ratio (cbr) test
4.6 Pavement design using cbr
CHAPTER FIVE
GEOMETRIC ELEMENTS DESIGN
5.1 Basic design parameters
5.1.1Design speed
5.1.2Gradient
5.1.3Sight distance
5.2 Curve design
5.3 Curve parameters and formula used, in designing of horizontal curves
5.4 Vertical curve design
5.5 Cross sectional elements of the road
5.6 Brief description on stages of work and equipment used n road constriction
5.7 Summary and conclusion
You either get what you want or your money back. T&C Apply
![](https://codemint.net/assets/public/img/100-money-back-guarantee.png)
You can find more project topics easily, just search
-
SIMILAR BUILDING TECHNOLOGY FINAL YEAR PROJECT RESEARCH TOPICS
-
1. RETRAINING OF PROFESSIONAL BUILDERS IN THE NIGERIAN CONSTRUCTION INDUSTRY
» ABSTRACT This work studied the retraining of professional builders in the Nigerian construction industry. The study identified the key areas of profes...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
2. ASSESSMENT OF CONTRACTOR TENDER DURATION IN ANAMBRA
» CHAPTERONE INTRODUCTION 1.1 Background to the Study Construction estimation is an experience based process (Elhag et al., 2005). The code of estimatin...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
3. RESIDENTIAL BUILDING COLLAPSE IN NIGERIA: CAUSES, EFFECTS AND SOLUTIONS(A CASE STUDY OF AKURE,ONDO STATE)
» CHAPTER ONE INTRODUCTION 1.1 BACKGROUND TO THE STUDY Since independence, the Nigeria government has desperately continued to make concerted effort in ...Continue Reading »Item Type & Format: Project Material - Ms Word | 57 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
4. THE CHALLENGES OF INDIGENOUS BUILDING CONSTRUCTION FIRMS IN NIGERIA
» CHAPTER ONE INTRODUCTION 1.1BACKGROUND OF THE STUDY According to business dictionary, an online dictionary, “the construction industry is that s...Continue Reading »Item Type & Format: Project Material - Ms Word | 53 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
5. COMPARISON OF LOCALLY EXCAVATED SAND WITH RIVER SAND IN TERMS OF STRENGTH IN SANDCRETE BLOCKS.(NSUDE AS CASE STUDY).
» CHAPTER ONE INTRODUCTION This research work means to determine the different properties of sandcrete blocks moulded with a locally excavated sand, in ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
6. AN ASSESSMENT OF MUNICIPAL SOLID WASTE MANAGEMENT PRACTICES CASE STUDY: NYARUGENGE DISTRICT- RWANDA
» ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
7. THE EFFECT OF COST OF ROOF ON THE TOTAL COST OF A BUILDING. A CASE STUDY OF SOME SELECTED BUILDINGS IN AWKA SOUTH- ANAMBRA STATE
» ABSTRACT The research looked at the effect of cost of roof on the total cost of a building (A case study of some selected buildings in Awka South, Ana...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
8. IMPORTANCE OF INCENTIVES IN ENHANCING WORKERS PERFORMANCE IN CONSTRUCTION INDUSTRY
» ABSTRACT This study was based on the importance of incentives in enhancing workers performance on sites, that is, both financial and non financial inc...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
9. THE INFLUENCE OF PUBLIC PROCUREMENT SYSTEM ON CONTRACT PERFORMANCE OF PUBLIC BUILDING PROJECTS DURING IMPLEMENTATION
» ABSTRACT Public procurement system account for significant percentage of GDP and has a directimpact on Kenya economy. Indeed, the Nigerian government ...Continue Reading »Item Type & Format: Project Material - Ms Word | 105 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
10. ASSESSMENT OF THE MAINTENANCE OF FACILITIES IN BUILDING TECHNOLOGY WORKSHOPS IN TECHNICAL COLLEGES IN ZONE TWO KADUNA STATE
» TABLE OF CONTENT Cover page Title page ...Continue Reading »Item Type & Format: Project Material - Ms Word | 132 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT