- The Complete Research Material is averagely 40 pages long and it is in Ms Word Format, it has 1-5 Chapters.
- Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
- Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
- Full Access Fee: ₦6,000
Get the complete project »
CHAPTER ONE
1.1 INTRODUCTION
The site under investigation is Hillview of ESBS Road Enugu.
Along the site failures are observed especially depress on pavement and lost of pavement totally which are caused by excessive moisture in the sub – grade.
The aim of the investigation is to know the extent of the failure on the flexible pavement and the nature of the failure.
The aim is also to give recommendation on how to improve the pavement which has occurred at the site under investigation.
1.2 LITERATURE REVIEW
The uses and application of modern technologies and new concepts have been deviced to tackle problem of pavement failure by many organized bodies.
1.3 DEFINITION OF PAVEMENT
a pavement can be defined as the hard crust of the road structure placed above the soil formation or sub-grade.
1.4 FUNCTIONS
The function of pavement is to transmit acceptable pressure to the bearing subgrade through sub base soil which must be less than the bearing capacity of the soil sub-grade.
1.5 TYPES OF ROAD PAVEMENT
There are two main types of pavement
(i) Flexible Pavement
(ii) Rigid Pavement
1.6 FLEXIBLE PAVEMENT
This consist of various lagers of high way building materials compacted so as to be void free and finished with elastic surface such as bitumen as asphalt maintain intimate constant and distributes inter lock, particle reaction and cohesiol per stability.
1.7 ADVANTAGES OF FLEXIBLE PAVEMENT
If good services are to be received from bituminous pavement it must be for its full life, retain the following qualities.
(i) Smooth riding or in skid surface
(ii) Tight, impermeable surface or porous surface
(iii) No cracking or fatigue failure
(iv) Resistance of weather
(v) Resistance of moisture
1.8 DISADVANTAGE OF FLEXIBLE PAVEMENT
If not properly constructed --- will be
(i) Poor weather resistance
(ii) Presence of cracking
(iii) High cost is incurred during construction
(iv) Fatigue failure will occur
1.9 RIGID PAVEMENT
This type of pavement is made up of reinforcement or non – reinforcement concrete slab. It consist of two layers the cement slab and the snobs of granular material or stabilized soil.
These two large are sprees I n separate construction operation.
1.10 ADVANTAGE OF RIGID PAVEMENT
This types of pavement has long life, when properly design constructed.
It has low maintenance cost
The reinforcement made it not flexible
1.11 DISADVANTAGE OF RIGID PAVEMENT
(i) Trans cracking of concrete paving slab under combined flexural and direct tensile stress is inevitable.
(ii) Longitudinal crack slab more than one lone wide is also inevitable
1.12 FUNCTION OF PARTS OF THE PAVEMENT STRUCTURES
SUB-GRADE: This bears the load of pavement and traffic load in other to reduce the effective thickness, the bearing capacity is reduced by
(a) Proper Compaction (b) Stabilization
(c) Proper drainage
1.13 THE SUB – BASE
This is introduced due to poor bearing capacity of the sub grade soil or high traffic density. It is made to improve earths its function is to transmits the traffic load from the road and spreading as jet over a large area of the sub grade formation level.
1.14 ROAD BASE
The function of the base is bearing the late load from the traffic and long heed from the over wearing surface and spreading it uniformly over a large area of the sub grade or sub-base.
1.15 SURFACING (WEARING COURSE)
The weary course is to spread the wheel load to the road base against surface water. The presence of bitumen improves the water proofing property. It also provide skid resistance.
1.16 PAVEMENT FAILURE
Pavement is bound to fail for many reasons not ably localized depression or settlement, but the most but the most common is lack of maintenance. From the day one pavement is exposed to traffic, the pavement is subjected to destructive forces. Temptation change settlement, precipitation and run – off and other natural phenomenous that stress the pavement structure increase addition of the load of traffic on the pavement increases the rate of failure. The serviceability or rider quality of a new pavement declines shallowly at first but as years pass rider quality begins to deteriorate mush more rapidly if maintenance is neglected and the situation is been worsen. The cost of rehabilitation must surly increase visual inspection can be used to determine pavement condition and degree of failure.
1.17 RUTTING
A known depression in the pavement parallel to the side is sevialy slight when the depression measures less than ½ + 1 inch deep, but not deep enough to pavement steering usually water accommodate in the depression, promoting pavement failure. This depression can also be caused by traffic loading more than the bearing capacity of the pavement or by poor construction method.
1.18 CORRUGATION
The corrugation or coach boarding is a form of plastic movement. Ripples and visible in the pavement perpendicular to this direction of traffic. The condition is slightly with barely visible sever when the ripples are so prevalent that they require the diver to reduce speed.
1.19 REVEALING
A braking of the visible loose particles or pieces of aggregates considered slightly when only a few piece of aggregate are dis
You either get what you want or your money back. T&C Apply
You can find more project topics easily, just search
-
SIMILAR BUILDING TECHNOLOGY FINAL YEAR PROJECT RESEARCH TOPICS
-
1. THE INFLUENCE OF PUBLIC PROCUREMENT SYSTEM ON CONTRACT PERFORMANCE OF PUBLIC BUILDING PROJECTS DURING IMPLEMENTATION
» ABSTRACT Public procurement system account for significant percentage of GDP and has a directimpact on Kenya economy. Indeed, the Nigerian government ...<a href="https://codemint.net/building-technology/the-influence-of-public-procurement-system-on-contract-performance-of-public-building-projects-during-implementation/index.html">Continue Reading »</a>Item Type & Format: Project Material - Ms Word | 105 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
2. DELAY ANALYSIS IN INDUSTRIAL PROJECTS BY USING RELATIVE IMPORTANCE INDEX METHOD.
» TABLE OF CONTENTSApproval pageDedicationAbstractAcknowledgementTable of contentCHAPTER ONEINTRODUCTION1.1 Relevance of project1.2 Site inspection1.3 E...<a href="https://codemint.net/building-technology/delay-analysis-in-industrial-projects-by-using-relative-importance-index-method/index.html">Continue Reading »</a>Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
3. THE STUDY OF FACTORS AFFECTING WORKERS PRODUCTIVITY IN BUILDING PRODUCTION PROCESS IN IMO STATE
» CHAPTER ONE INTRODUCTION 1.1 Background of the study Productivity at both micro and macro economic level is a serious issue as far as the industrial s...<a href="https://codemint.net/building-technology/the-study-of-factors-affecting-workers-productivity-in-building-production-process-in-imo-state/index.html">Continue Reading »</a>Item Type & Format: Project Material - Ms Word | 70 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
4. THE INFLUENCE OF NATIONAL CULTURE ON WORKERS SAFETY CLIMATE IN THE NIGERIAN CONSTRUCTION INDUSTRY
» ABSTRACT The research explored and analyzed the influence of national culture on workers safety climate in the Nigeria construction industry. It ident...<a href="https://codemint.net/building-technology/the-influence-of-national-culture-on-workers-safety-climate-in-the-nigerian-construction-industry/index.html">Continue Reading »</a>Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
5. THE CHALLENGES OF REDUCING LABOUR COST IN NIGERIA BUILDING INDUSTRY (A case study of osun state)
» ABSTRACT The aim of this research was to identify and rank, according to relative importance, factors affecting high cost of labour in Nigerian buildi...<a href="https://codemint.net/building-technology/the-challenges-of-reducing-labour-cost-in-nigeria-building-industry-a-case-study-of-osun-state/index.html">Continue Reading »</a>Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
6. FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION SITE
» CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Material management can be defined as a process that coordinates planning, assessing the requirem...<a href="https://codemint.net/building-technology/factors-affecting-material-management-on-construction-site/index.html">Continue Reading »</a>Item Type & Format: Project Material - Ms Word | 79 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
7. INNOVATION PROCESSES AND PRACTICES IN CONSTRUCTION INDUSTRY IN ANAMBRA STATE OF NIGERIA
» ABSTRACT This study “innovation process and practices in construction industry in Anambra State of Nigeria” examined and assessed the leve...<a href="https://codemint.net/building-technology/innovation-processes-and-practices-in-construction-industry-in-anambra-state-of-nigeria/index.html">Continue Reading »</a>Item Type & Format: Project Material - Ms Word | 97 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
8. THE DESIGN AND CONSTRUCTION OF BURGLARY PROOF
» CHAPTER ONE 1.1 INTRODUCTION Protector design is the joining of metals of pipes of the same diameter. Sizes together in a compound pattern in order to...<a href="https://codemint.net/building-technology/the-design-and-construction-of-burglary-proof/index.html">Continue Reading »</a>Item Type & Format: Project Material - Ms Word | 39 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
9. ENVIRONMENTAL FACTORS INFLUENCING CONSTRUCTION TIME AND COST OVERRUNS ON HIGH-RISE PROJECT IN NIGERIA
» CHAPTER ONE INTRODUCTION 1.0 Background of the study The expanding need for building of all kinds, coupled with a tight financial supply has offer the...<a href="https://codemint.net/building-technology/environmental-factors-influencing-construction-time-and-cost-overruns-on-high-rise-project-in-nigeria/index.html">Continue Reading »</a>Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
10. THE EFFECT OF DELAY AND DISTRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECT
» CHAPTER ONE INTRODUCTION Delay as referred in construction is prolonged construction period and disruptions are events that disturb the construction p...<a href="https://codemint.net/building-technology/the-effect-of-delay-and-distruption-on-the-cost-of-building-construction-project/index.html">Continue Reading »</a>Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT