CHAPTER ONE
1.1 INTRODUCTION
The site under investigation is Hillview of ESBS Road Enugu.
Along the site failures are observed especially depress on pavement and lost of pavement totally which are caused by excessive moisture in the sub – grade.
The aim of the investigation is to know the extent of the failure on the flexible pavement and the nature of the failure.
The aim is also to give recommendation on how to improve the pavement which has occurred at the site under investigation.
1.2 LITERATURE REVIEW
The uses and application of modern technologies and new concepts have been deviced to tackle problem of pavement failure by many organized bodies.
1.3 DEFINITION OF PAVEMENT
a pavement can be defined as the hard crust of the road structure placed above the soil formation or sub-grade.
1.4 FUNCTIONS
The function of pavement is to transmit acceptable pressure to the bearing subgrade through sub base soil which must be less than the bearing capacity of the soil sub-grade.
1.5 TYPES OF ROAD PAVEMENT
There are two main types of pavement
(i) Flexible Pavement
(ii) Rigid Pavement
1.6 FLEXIBLE PAVEMENT
This consist of various lagers of high way building materials compacted so as to be void free and finished with elastic surface such as bitumen as asphalt maintain intimate constant and distributes inter lock, particle reaction and cohesiol per stability.
1.7 ADVANTAGES OF FLEXIBLE PAVEMENT
If good services are to be received from bituminous pavement it must be for its full life, retain the following qualities.
(i) Smooth riding or in skid surface
(ii) Tight, impermeable surface or porous surface
(iii) No cracking or fatigue failure
(iv) Resistance of weather
(v) Resistance of moisture
1.8 DISADVANTAGE OF FLEXIBLE PAVEMENT
If not properly constructed --- will be
(i) Poor weather resistance
(ii) Presence of cracking
(iii) High cost is incurred during construction
(iv) Fatigue failure will occur
1.9 RIGID PAVEMENT
This type of pavement is made up of reinforcement or non – reinforcement concrete slab. It consist of two layers the cement slab and the snobs of granular material or stabilized soil.
These two large are sprees I n separate construction operation.
1.10 ADVANTAGE OF RIGID PAVEMENT
This types of pavement has long life, when properly design constructed.
It has low maintenance cost
The reinforcement made it not flexible
1.11 DISADVANTAGE OF RIGID PAVEMENT
(i) Trans cracking of concrete paving slab under combined flexural and direct tensile stress is inevitable.
(ii) Longitudinal crack slab more than one lone wide is also inevitable
1.12 FUNCTION OF PARTS OF THE PAVEMENT STRUCTURES
SUB-GRADE: This bears the load of pavement and traffic load in other to reduce the effective thickness, the bearing capacity is reduced by
(a) Proper Compaction (b) Stabilization
(c) Proper drainage
1.13 THE SUB – BASE
This is introduced due to poor bearing capacity of the sub grade soil or high traffic density. It is made to improve earths its function is to transmits the traffic load from the road and spreading as jet over a large area of the sub grade formation level.
1.14 ROAD BASE
The function of the base is bearing the late load from the traffic and long heed from the over wearing surface and spreading it uniformly over a large area of the sub grade or sub-base.
1.15 SURFACING (WEARING COURSE)
The weary course is to spread the wheel load to the road base against surface water. The presence of bitumen improves the water proofing property. It also provide skid resistance.
1.16 PAVEMENT FAILURE
Pavement is bound to fail for many reasons not ably localized depression or settlement, but the most but the most common is lack of maintenance. From the day one pavement is exposed to traffic, the pavement is subjected to destructive forces. Temptation change settlement, precipitation and run – off and other natural phenomenous that stress the pavement structure increase addition of the load of traffic on the pavement increases the rate of failure. The serviceability or rider quality of a new pavement declines shallowly at first but as years pass rider quality begins to deteriorate mush more rapidly if maintenance is neglected and the situation is been worsen. The cost of rehabilitation must surly increase visual inspection can be used to determine pavement condition and degree of failure.
1.17 RUTTING
A known depression in the pavement parallel to the side is sevialy slight when the depression measures less than ½ + 1 inch deep, but not deep enough to pavement steering usually water accommodate in the depression, promoting pavement failure. This depression can also be caused by traffic loading more than the bearing capacity of the pavement or by poor construction method.
1.18 CORRUGATION
The corrugation or coach boarding is a form of plastic movement. Ripples and visible in the pavement perpendicular to this direction of traffic. The condition is slightly with barely visible sever when the ripples are so prevalent that they require the diver to reduce speed.
1.19 REVEALING
A braking of the visible loose particles or pieces of aggregates considered slightly when only a few piece of aggregate are dis
You either get what you want or your money back. T&C Apply

You can find more project topics easily, just search
-
SIMILAR BUILDING TECHNOLOGY FINAL YEAR PROJECT RESEARCH TOPICS
-
1. COMPARATIVE STUDIES OF RICE HUSK ASH AND COW BONE ASH AS PARTIAL REPLACEMENT OF CEMENT IN CONCRETE
» ABSTRACT It is seen that the rising of construction materials in developing countries has necessitated research into the use of alternative materials ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
2. ASSESSMENT OR CONTROLLING OF DAMPNESS IN EXISTING BUILDING IN NIGERIA
» CHAPTER ONE INTRODUCTION 1.1 Background to the Study A building delivered to the satisfaction of the client is one that is accepted as being of high s...Continue Reading »Item Type & Format: Project Material - Ms Word | 49 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
3. STRUCTURAL DETAILING IN REINFORCED CONCRETE OF A THREE BEDROOM DETACH DUPLEX
» CHAPTER ONE INTRODUCTION The work in the construction industry involves the client, the Architect, the Engineer, the quantity surveyor and the builder...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
4. COMPARING THE COMPRESSIVE AND FLEXURAL STRENGTH OF CONCRETE MADE WITH RIVER SAND AND QUARRY DUST AS FINE AGGREGATE
» ABSTRACT Nowadays development of infrastructures is becoming number one priority in the world, particularly in the developing countries. So there are ...Continue Reading »Item Type & Format: Project Material - Ms Word | 80 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
5. APPRAISAL OF BUILDING MAINTENANCE PRACTICE AMONG LANDLORDS IN NIGER CENTRAL SENATORIAL ZONE OF NIGER STATE
» TABLE OF CONTENTS Title page i Declaration ii Approval page iii Dedication iv Acknowledgement v Table of contents vi Abstract viii CHAPTER ONE: INTROD...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
6. THE CHALLENGES OF REDUCING LABOUR COST IN NIGERIA BUILDING INDUSTRY (A case study of osun state)
» ABSTRACT The aim of this research was to identify and rank, according to relative importance, factors affecting high cost of labour in Nigerian buildi...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
7. AN ASSESSMENT OF MUNICIPAL SOLID WASTE MANAGEMENT PRACTICES CASE STUDY: NYARUGENGE DISTRICT- RWANDA
» ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
8. THE EFFECT OF DELAY AND DISTRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECT
» CHAPTER ONE INTRODUCTION Delay as referred in construction is prolonged construction period and disruptions are events that disturb the construction p...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
9. ACCESSMENT OF THE COMPRESSIVE STRENGTH OF SANDCRETE HOLLOW BLOCKS MOULDED FROM FOUR (4) DIFFERENT BLOCK INDUSTRIES IN IGABI, CHIKUMAND KADUNA SOUTH LO...
» CHAPTER ONE 1.0 Introduction Sandcrete blocks are composit4e material made up of cement, sand and water moulded into different sizes (Barry 1969). It ...Continue Reading »Item Type & Format: Project Material - Ms Word | 51 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
10. MOTIVATIONAL NEEDS OF BUILDING TECHNOLOGY TEACHERS IN TECHNICAL COLLEGES IN NIGER STATE
» ABSTACT This study examines the performance of Commercial Banks institutions in Kaduna State, based on the development of small and medium Scale indus...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT