CHAPTER ONE
INTRODUCTION
1.1 Background of the study
It is
believed that one of the prevailing problems of construction industry in
Nigeria is the impact of delays in project delivery. It is very important for
both public and private projects to be completed on time and within budgets.
Normally, achieving the projects within predetermined time, budget and quality
is the basic purpose of construction project control. Construction delays is
simply the time during which some part of the construction project has been
extended beyond what was originally planned due to unanticipated circumstances.
Project success is basically to gain the project objectives that are classically
defined by the need to complete a project on time, within the budget and with
appropriate quality. Hence any disruptions to the project objectives will
certainly contribute to project delays with the specified adverse effect on
project objectives. Delays can give rise to disruption of work and loss of
productivity, late completion of project, increase time related costs, third
party claims, abandonment or determination of contract. Delays are costly and
often result in disputes
and claims. Furthermore, delays effects the feasibility for project owner and
retard the development in construction industry
Before determining the effect of delay on project, one must determine whether
the delay is critical. Additionally, all delays are either excusable or
non-excusable. Both excusable and non-excusable can be defined as either
concurrent or non-concurrent. Delays can be further broken down into
compensable or non-compensable delays. Unfortunately, many construction
projects cannot be delivered within specified time and budget. Many project
shows massive cost and time overruns, in some cases client has to increase
project time and cost. In an attempt to solve these problems, there are various
strategies applied which will be discuss at the course of this presentation.
Delays are perhaps the most common form of construction claims or even
disputes. The problem is that, the parties involved in the process could hardly
identify the reason and responsibility of each one in the specific task. Delays
and claims resulted from works which are not carried-out precisely as the
contract required. Accordingly, avoiding delays is a crucial concerned not only
with good practice during the planning and execution of the works but also with
the proper operation of the contract machinery.
This project seeks to identify the impact of delays on project delivery in
Nigeria construction industry. Appropriate strategies to
control delays and develop a guide him of information management for prevention
and control are also covered in this work.
1.2 STATEMENT OF THE PROBLEM
Project
delays have been one of the most prevailing problems in construction projects
in Cross River State. This delays has it impact on project delivery which
findings shows that cost overrun, time overrun and project abandonment is the
effect experience by delay in construction project in Cross River State.
Improper planning, poor contract management, slow decision making, design
errors and cash flow problems were the major causes of delays in most of the
project.
1.3 OBJECTIVES OF THE STUDY
The main objective of the study is to investigate the effects of delay on construction delivery in Nigeria. But for the successful completion of the study, the researcher intends to achieve the following objectives;
i) To ascertain the effects of delay on construction delivery in Nigeria
ii) To investigate the impact of delay in construction on the life span of the project
iii) To ascertain the causes of delay in construction project delay in Nigeria
iv) To ascertain the relationship between delay in project delivery and project abandonment.
1.4 SIGNIFICANCE OF THE STUDY
It
has been observed that most contracts in Cross River State has its inability to
keep to the targeted contracted period of time and it all turns out in the
increment of stipulated period and associated excessive cost maximization
thereby causing unwanted and unnecessary delay.
The purpose of this research work, this is significant in that it has given the
researcher challenges and opportunity to conduct an in-dept study of the
subject. This act could be sourced from either of the party involved in the
contracts, which could turn to be due to the negligence of fulfilling the
oblig2tions awarded to either of them. Furthermore, the impacts of the causes
of the delays of these construction projects have to be known and solutions
identify in other to minimize it, if possible rectify the faults.
1.4 SCOPE OFTHE STUDY
This
study appraises delays and it impacts on project delivery in construction
industry, and more especially in the Nigeria context. This is with the view of
finding solutions and making constructive proposals to rectifying, minimizing
and finding a long costing reduction for the future efficient project
execution. Research work in project construction delays generally will be very
voluminous and this would mean researching into all aspect and methods of
contract procurement. I therefore hope that all the detailed information
required to achieve my aim and objectives of
this project has been accomplished.
1.6 LIMITATION OF THE STUDY
During the course of carrying out this study, the researchers encountered the following under listed problems
(a)
The limitation was the unwillingness of some respondent to complete the
questionnaire administered. This is because of the fear that such information
may lead to their superior.
(b) The lean financial position of the researchers also contributed to the
limitation of this study.
(c) The time limit for this research also contribute a serious constraint to the production of a full scale report, though study of this nature will need comparison with many of such settlements within and outside the study area so as to give a sound judgment and recommendation.
1.7 RESEARCH HYPOTHESES
For the purpose of the study, the following hypotheses are formulated by the researcher;
H0: there is no relationship between project delay in delivery and project abandonment.
H1: there is a significant relationship between project delay in delivery and project abandonment.
H02: there is no effect of delay on construction delivery in Nigeria.
H2: there is a significant effect of delay on construction delivery in Nigeria.
1.8 ORGANISATION OF THE STUDY
It is
worthwhile to state here that the project is divided into five chapters.
Chapter one consist of the introduction, which gives us a brief insight of what
the researcher is writing about, the objectives of the study, significance of
the study, research questions, scope of the study, limitation of the study and
definition of terms.
The second chapter move on to reviewing related literature and conceptual
issues. The overview of the study with analysis on delays, causes, impact or
effect of delays and types of delays is been highlighted.
Chapter three introduces the research method research area, selection of
samples research procedure! administration and data collection. Findings are
made herein on the impact of delays in project delivery in Construction Industry
and Cross River State used as a case study.
The fourth chapter analyses the data collected and findings in the study area,
it examines the impacts of delays on project delivery. While the last chapter
gives the summary, conclusion and recommendation for minimizing those problems
identified.
1.9 DEFINITION OF TERMS
The Terms Used Are Defined As Follows;
ACCELERATION: This
is a process of increasing the pace of the contractors work by adding extra
labour to compensate for a delay, to accommodate additional work or to finish
the project earlier than originally scheduled.
CLAIMS: There are generally described as request by contractor for
recompense for losses and expenses that he has suffered or attempt by
contractors to avoid the requirement to pay liquidated and ascertained damages
or right that are established with action through the court of law due to
either breach of contract, tort, repudiation and other related matters.
CLIENT: This is the project owner, he who bears the financial
burdens of the projects. He inputs all other parties to the project and the
outcome of the project belongs to him as the end product must be to his
satisfaction.
CONSULTANT: these are the group of specialists consulted to provide
profession services in most construction project, the following are part of the
numerous consultants: Architects, Quantity Surveyors, Structural and Service
Engineers, Estate surveyors, Builders etc.
CONTRACTOR I BUILDER: This is the successful bidder. He is
responsible for the proper execution of the work in accordance with the
contractual documents and agreements.
You either get what you want or your money back. T&C Apply
You can find more project topics easily, just search
-
SIMILAR BUILDING TECHNOLOGY FINAL YEAR PROJECT RESEARCH TOPICS
-
1. DELAY ANALYSIS IN INDUSTRIAL PROJECTS BY USING RELATIVE IMPORTANCE INDEX METHOD.
» TABLE OF CONTENTSApproval pageDedicationAbstractAcknowledgementTable of contentCHAPTER ONEINTRODUCTION1.1 Relevance of project1.2 Site inspection1.3 E...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
2. MANAGEMENT OF MATERIALS ON BUILDING CONSRTUCTION SITES
» CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Material management can be defined as a process that coordinates planning, assessing the requirem...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
3. ASSESSMENT OF THE EFFECTS OF DAMPNESS ON BUILDINGS IN ATIA IBIAKU SETTLEMENT IN ITU LOCAL GOVERNMENT, AKWA IBOM STATE
» ABSTRACT The work was carried out with the aim of investigating dampness in the buildings within Atia Ibiaku Settlement of Itu Local Government Area, ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
4. CONSTRUCTION OF EQUIPMENT FOR DEODORIZING KEROSENE
» ABSTRACT The motive of this project is to construct equipment for deodorizing kerosene, hence the smell of kerosene is totally eradicated. The...Continue Reading »Item Type & Format: Project Material - Ms Word | 33 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
5. Challenges Of Low Cost Housing Delivery In Nigeria (A Case Study Of Imo State)
» ABSTRACT The world of building Industry is very wide and reaches which covers all areas like production, Building maintenance, project management, pro...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
6. FRAMEWORK FOR IMPLEMENTATION OF GREEN TECHNOLOGY PRACTICES FOR SUSTAINABLE INFRASTRUCTURAL DEVELOPMENT IN AKWA IBOM STATE
» TABLE OF CONTENT CONTENTS PAGE Title Page i Declaration ii Certification iii Dedication iv Acknowledgement v Table of Contents vi List of Tables ix Li...Continue Reading »Item Type & Format: Project Material - Ms Word | 30 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
7. ASSESSMENT OF PROFESSIONAL’S PERCEPTION ON MATERIALS MANAGEMENT PRACTICES ON CONSTRUCTION SITES IN SELECTED STATES IN NIGERIA.
» CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Material management can be defined as a process that coordinates planning, assessing the requirem...Continue Reading »Item Type & Format: Project Material - Ms Word | 80 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
8. ASSESSMENT OR CONTROLLING OF DAMPNESS IN EXISTING BUILDING IN NIGERIA
» CHAPTER ONE INTRODUCTION 1.1 Background to the Study A building delivered to the satisfaction of the client is one that is accepted as being of high s...Continue Reading »Item Type & Format: Project Material - Ms Word | 49 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
9. NAILS USED IN THE CONSTRUCTION OF AN OFFICE ROOF CONSTRUCTION BY BUILDING TECHNOLOGY STUDENTS
» CHAPTER ONE 1.0 INTRODUCTION 1.1 BACKGROUND OF STUDY Nailing can be said to be the most basic and most commonly used means of attaching members in woo...Continue Reading »Item Type & Format: Project Material - Ms Word | 51 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
10. ENERGY SUPPLY FOR DOMESTIC USE AND IMPACT ON THE URBAN POOR IN MAKURDI NIGERIA
» Abstract In Nigeria, as many developing countries, providing energy for the population has proven to be a great challenge thereby increasing dependenc...Continue Reading »Item Type & Format: Project Material - Ms Word | 38 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT