TABLE OF CONTENTS
INDEX TITLES PAGE
Title Page - - - - - - - - - - i
Cover Page - - - - - - - - - - ii
Declaration - - - - - - - - - - i
Certification - - - - - - - - - - ii
Dedication - - - - - - - - - - iii
Acknowledgements- - - - - - - - iv
Abstract - - - - - - - - - - v
Table Contents - - - - - - - - - vi
List of Tables - - - - - - - - - vii
Chapter one: Introduction
1.1 Background of Study - - - - - - - 1
1.2 Statement of the Problem - - - - - - 2
1.3 Aim and Objective of Study- - - - - - - 3
1.4 Research Questions- - - - - - - - 3
1.5 Significance of Study- - - - - - - - 4
1.6 Scope and Delimitation of Study- - - - - - 4
1.7 Organization of the Study- - - - - - - 4
Chapter two: Literature Review
2.1 Preamble- - - - - - - - - 6
2.2 Building Contractors’ Selection - - - - - - 6
2.3 Contractors Evaluation and Selection Criteria - - - - 9
2.4 Contractors’ Prequalification - - - - - - 14
2.4.1 Contractors’ Prequalification: Definition and Types - - 17
2.4.2 Contractor Prequalification Criteria - - - - - 19
2.4.3 Procedure for Contractor Prequalification- - - - - 21
2.5 Contractor Qualification Factors- - - - - - 23
2.6 Over-reliance on Subjective analysis - - - - - 27
Chapter three: research Methodology
3.1 Types of Design- - - - - - - - 28
3.2 Description of Study Area - - - - - - 28
3.3 Population of Study - - - - - - - 28
3.4 Sampling size and Techniques Used - - - - - 29
3.5 Data Collection - - - - - - - 29
3.6 Method of data analysis and Techniques - - - - 29
Chapter Four: RESULTS AND DISCUSSION
4.1 Data analysis and Presentation - - - - - 30
4.2 Response to questionnaire administered - - - - 30
4.3 Demographic characteristics of Respondent of the Study- - 31
4.4 Characteristics of Projects Sampled- - - - - 32
4.5 Assessment of Importance- - - - - - - 33
4.6 Assessment of the extent of Consideration- - - - - 34
4.7 Difference in the extent of Consideration- - - - - 35
4.8 Discussion of Findings- - - - - - - 38
Chapter five: CONCLUSION AND RECOMMENDATION
5.0 summary of finding- - - - - - - -39
5.1 Conclusion - - - - - - - - -40
5.2 Recommendation - - - - - - - -40
5.3 Suggestion for the further Studies- - - - - - 40
References - - - - - - - - - -41
appendix a: copy of research questionnaire
LIST OF TABLES
Index Titles Page
4.1 Response to questionnaire administered- - - - 30
4.2 Descriptive result of the characteristics of the respondent of the study- 31
4.3 Descriptive results of the characteristics of project sampled- - 32
4.4 Rank of importance’s attached to selection - - - - 32
4.5 Rank of extent of Consideration of selection- - - - 33
4.6 Rank and Chi-square test- - - - - - - 34
ABSTRACT
The knowledge and understanding of value management concept is critical in achieving project goal and objectives in terms of time, cost, quality, safety, and functionality. Previous studies have found that has been emerging as a concept that is needed to be integrated into Nigerian construction industry projects. The study seeks to assess the use of VM concept as a project management technique by construction stakeholders in south-south Nigeria with a view to ensuring a sustainable and vibrant VM process in the construction industry. The objectives were to assess the level of awareness of value management concept for construction projects in Akwa Ibom and Rivers States, examine the level of implementation of value management practices by stakeholders, evaluate key drivers influencing the practice of value management practices and assess factors inhibiting the smooth implementation of VM practices for construction projects in the study area. Related literatures were reviewed to achieve the objectives. A cross-sectional survey approach was used for the study. One hundred and seventy-seven (177) questionnaires were retrieved from the respondent which included: 77 contractors and 100 consultants who applied the understudied value management concept for construction projects delivery. Data collected were analysed using mean item score, relative importance index and Mann Whitney U-test was used to test the hypotheses. Findings indicate value management practice is very low in the south-south Nigerian construction projects, even though the study shows that, there is knowledge of value management among stakeholders in the implementation of this concept in the region. Improved products and services, Work towards arriving at a more effective design, Seek to obtain maximum efficiency ratio, Create a clearer focus on the project objectives, Higher efficiency can be achieved due to the multidisciplinary and multi-task teamwork, and Clearer project brief and decision making were discovered to be the key drivers influencing the practices of value management for construction projects in the study area while Lack of awareness, Absence of formal guidelines, Passive behavior among VM practitioners and Ineffective procurement issues were the factors inhibiting the smooth implementation of value management for construction projects in the study area. Findings suggest that professional bodies and academic institutions organize a sensitization programs and also synergize with relevant government institutions to get a legislation that would enforce value management in Nigerian construction industry. Proper guidelines should be published as well as Procurement Act should also be reviewed to include value management practice for construction projects in south-south region.
You either get what you want or your money back. T&C Apply
You can find more project topics easily, just search
-
SIMILAR QUANTITY SURVEYING FINAL YEAR PROJECT RESEARCH TOPICS
-
1. THE EFFECT OF TECHNOLOGY IN THE FIELD OF QUANTITY SURVEYING AND HOW IT AFFECT COST, LABOUR AND TIME
» CHAPTER ONE INTRODUCTION 1.1 BACKGROUND TO THE STUDY The construction industry has recently witnessed a paradigm shift from traditional paper based me...Continue Reading »Item Type & Format: Project Material - Ms Word | 46 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
2. APPRAISAL OF THE CHALLENGES OF E-TENDERING SYSTEM IN QUANTITY SURVEYING PRACTICE IN NIGERIA
» ABSTRACT E tendering is a veritable tool for increasing productivity and empowering construction industry professionals to take better control of the ...Continue Reading »Item Type & Format: Project Material - Ms Word | 65 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
3. ASSESSMENT OF KNOWLEDGE MANAGEMENT CAPABILITIES OF THE NIGERIAN QUANTITY SURVEYING FIRMS
» ABSTRACT Knowledge Management (KM) capabilities provide the supportive structure required to share knowledge within the context in which it is require...Continue Reading »Item Type & Format: Project Material - Ms Word | 180 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
4. INVESTIGATING THE EFFECTIVENESS OF INSURANCE AS RISK MANAGEMENT TOOL IN CONSTRUCTION INDUSTRY
» TABLE OF CONTENTS Index Title Page Title page…………………………………………………………..i Declaration……………………...Continue Reading »Item Type & Format: Project Material - Ms Word | 76 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
5. ASSESSING THE CAPABILITIES OF CONTRACTORS IN MONITORING AND CONTROLLING CONSTRUCTION CASH FLOW IN NIGERIA.
» ABSTRACT The construction sector experiences the highest number of bankruptcies compared to any sector of the economy, with many companies failing bec...Continue Reading »Item Type & Format: Project Material - Ms Word | 111 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
6. IMPACT OF INCENTIVE SCHEMES ON PRODUCTIVITY OF CONSTRUCTION WORKERS IN CROSS RIVER STATE, NIGERIA
» CHAPTER ONE INTRODUCTION 1.1 Background of the study Construction performance and productivity improvement are the focus areas in construction industr...Continue Reading »Item Type & Format: Project Material - Ms Word | 59 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
7. INFLUENCE OF ESTIMATING PRACTICE ON COST PERFORMANCE OF BUILDING PROJECTS IN AKWA IBOM STATE
» ABSTRACT This study determined the influence of estimating practice on cost performance of building projects. The objectives were to identify the esti...Continue Reading »Item Type & Format: Project Material - Ms Word | 71 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
8. CAUSES AND EFFECTS OF DESIGN VARIATION IN ROAD CONSTRUCTION PROJECTS IN AKWA IBOM STATE
» CHAPTER ONE INTRODUCTION 1.1 Background of the Study The complexity of the construction industry due to different stakeholders’ involvement makes it...Continue Reading »Item Type & Format: Project Material - Ms Word | 63 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
9. COSTS OF HEALTH AND SAFETY MANAGEMENT IN BUILDING SITES: CONTRACTORS’ PERSPECTIVE IN EKET URBAN
» TABLE OF CONTENTS TABLES TITLE PAGE Cover Page = = = = = = = = = i Title Page = = = = = = = = = ii Declaration = = = = = = = = iii Certification = = =...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
10. AN EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR WALL TILES (A CASE STUDY OF KADUNA STATE AND ABUJA)
» ABSTRACT Productivity is one of the important elements in construction planning and scheduling. However, construction industries in Nigeria are curren...Continue Reading »Item Type & Format: Project Material - Ms Word | 101 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT