Quantity Surveying Final Year Project Research Topics

Quantity Surveying Project Topic:

Download Quantity Surveying Final Year Research Project Topics - Free Project Topics | Codemint and Research Materials. Get Complete Chapter 1-5 Project Materials and Research Topics for HND, BSc, MSc in Doc & PDF. Final Year Projects and Research Materials on CodeMint

Filters: Undergraduate (HND,BSc,BTech) Masters (MSc,MTech) PhD Thesis

Quick Project Topic Search



LIST OF QUANTITY SURVEYING PROJECT TOPICS AND MATERIALS
S/N Project Topic
1

IMPACT OF INCENTIVE SCHEMES ON PRODUCTIVITY OF CONSTRUCTION WORKERS IN CROSS RIVER STATE, NIGERIA

CHAPTER ONE INTRODUCTION 1.1 Background of the study Construction performance and productivity improvement are the focus areas in construction industry for any nation. Productivity is expressed in many ways but generally as the ratio of output to resources which are consumed to produce that output. Productivity is the average direct labour hours required to install a unit of material. In construct... Continue Reading »

Item Type & Format: Project Material - Ms Word |  59 pages |  Instant Download  |  Chapter 1-5  |  QUANTITY SURVEYING DEPARTMENT

2

ASSESSMENT OF COST OVER-RUN FACTORS IN PUBLIC BUILDING PROJECTS IN AKWA IBOM STATE

ABSTRACT Cost deviations between initial cost plan and final construction cost of building projects are on construction issues in the construction industry. This study examined cost overrun factors in public building projects in Akwa Ibom State. The objectives were to appraise economic, political, technical, social and environmental factors responsible for cost overrun in the construction industry... Continue Reading »

Item Type & Format: Project Material - Ms Word |  52 pages |  Instant Download  |  Chapter 1-5  |  QUANTITY SURVEYING DEPARTMENT

3

THE IMPACT OF PROCUREMENT SYSTEMS ON CONSTRUCTION COST AND DELIVERY

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY The construction industry is an importan t part of the economical backbone in many countries (Ngai et al., 2002), often accounting for between 7 10 percent of the Gross Domestic Product (Winch, 1996, Voordijk et al., 2000). Furthermore, construction products and processes have a large impact on safety, health and environmental aspects (Bayliss e... Continue Reading »

Item Type & Format: Project Material - Ms Word |  79 pages |  Instant Download  |  Chapter 1-5  |  QUANTITY SURVEYING DEPARTMENT

4

ASSESSMENT OF THE INFLUENCE OF UNETHICAL PRACTICES ON BUILDING PROJECT COST PERFORMANCE

TABLE OF CONTENTS Title Pages Cover page i Title Page ii Certification iii Dedication iv Acknowledgements v Table of Contents vi Abstract x CHAPTER ONE Introduction 1 2 1.1 Background to Study 2 1.2 Statement of the Research Problem 2 1.3 Aim and Objectives 4 1.4 Research Questions 4 1.5 Hypothesis of the Study 5 1.6 Significance of the Study 5 1.7 Scope and Delimitation of the Study 6 1.8 Definit... Continue Reading »

Item Type & Format: Project Material - Ms Word |  63 pages |  Instant Download  |  Chapter 1-5  |  QUANTITY SURVEYING DEPARTMENT

5

APPRAISAL OF THE CHALLENGES OF E-TENDERING SYSTEM IN QUANTITY SURVEYING PRACTICE IN NIGERIA

ABSTRACT E tendering is a veritable tool for increasing productivity and empowering construction industry professionals to take better control of the tendering process. However, despite the administrative and managerial benefits obtainable by the adoption of e tendering, the challenges and associated risks are rife. Thus, this study set out to appraisal of the challenges of E tendering system in q... Continue Reading »

Item Type & Format: Project Material - Ms Word |  65 pages |  Instant Download  |  Chapter 1-5  |  QUANTITY SURVEYING DEPARTMENT

6

THE IMPACT OF PROJECT CHARACTERISTICS ON THE DIFFERENCE BETWEEN CONTRACT SUM AND FINAL ACCOUNT IN NIGERIA

TABLE OF CONTENTS INDEX TITLE PAGE Cover Page i Title Page ii Declaration iii Certification iv Dedication v Acknowledgement vi Table of Contents vii Lists of Tables ix Abstract ix CHAPTER ONE: INTRODUCTION 1.1 Background of the Study 1 1.2 Statement of Research Problem 3 1.3 Aims and Objectives 4 1.4 Research Questions 4 1.5 Hypothesis of the Study 5 1.6 Significance of Study 6 1.7 Scope of the St... Continue Reading »

Item Type & Format: Project Material - Ms Word |  52 pages |  Instant Download  |  Chapter 1-5  |  QUANTITY SURVEYING DEPARTMENT

7

DEVELOPING A FRAMEWORK FOR THE MARKETING OF QUANTITY SURVEYING SERVICES

ABSTRACT The Quantity surveyor who plays a key role in building and engineering project, managing the cost from inception to the completion as cost controller has been reduced to a cost monitor. The aim of the study was to develop a policy guideline for the marketing of Quantity surveying services using the 7ps of marketing. The objectives were to investigate available strategies for marketing pro... Continue Reading »

Item Type & Format: Project Material - Ms Word |  80 pages |  Instant Download  |  Chapter 1-5  |  QUANTITY SURVEYING DEPARTMENT

8

EFFECT OF NATIONAL CULTURE ON ORGANISATIONAL LEARNING: PERSPECTIVE ON QUANTITY SURVEYING FIRMS IN AKWA IBOM STATE

ABSTRACT Learning remains one of the significant tools for improving performance of the construction sector. Individual quantity surveyors practicing across the globe in an enclave of a firm tend to tailor their organisation structure to reflect their national culture. This feature in a way is postulated to influence, the interaction interface during learning. This study evaluated the effect of na... Continue Reading »

Item Type & Format: Project Material - Ms Word |  60 pages |  Instant Download  |  Chapter 1-5  |  QUANTITY SURVEYING DEPARTMENT

9

ASSESSMENT OF DELAY AND ITS IMPACT ON CONSTRUCTION PROJECT DELIVERY IN AKWA IBOM STATE

ABSTRACT Construction industry is considered as one of the most important industries in Nigeria. Most construction projects in Nigeria and other developing countries are characterized by overrun in time (delay) in their completion due to various reasons in the world and Akwa Ibom state is no exception. Delay has always contributed high expenses to all parties. Once a project is delayed, it has a n... Continue Reading »

Item Type & Format: Project Material - Ms Word |  52 pages |  Instant Download  |  Chapter 1-5  |  QUANTITY SURVEYING DEPARTMENT

10

ANALYSIS OF EFFICIENCY OF AIR PASSENGER SUPPORT SERVICES A CASE STUDY OF MURTALA MOHAMMED INTERNATIONAL AIRPORT

CHAPTER ONE INTRODUCTION 1.1 Background Of The Study Passengers leaving on a trip normally want to spend as little time as possible in the terminal. They want to have baggage carts readily available, a fast check in, and little time waiting before and quick boarding prior to a timely departure. Passengers do not appreciate long line ups, repetitive security checks, crowded departure areas, line up... Continue Reading »

Item Type & Format: Project Material - Ms Word |  52 pages |  Instant Download  |  Chapter 1-5  |  QUANTITY SURVEYING DEPARTMENT

11

INFLUENCE OF LABOUR PRODUCTIVITY ON THE COST PERFORMANCE OF THE TRADITIONALLY PROCURED PROJECTS

TABLE OF CONTENTS Index Title Page Title page…………………………………………………………..i Declaration…………………………………………………………ii Certification…………………………………………………………iii Approval page………………………………………………………..iv Dedication……….…………………... Continue Reading »

Item Type & Format: Project Material - Ms Word |  47 pages |  Instant Download  |  Chapter 1-5  |  QUANTITY SURVEYING DEPARTMENT

12

PROJECT FINANCING IN AKWA IBOM STATE: CHALLENGES AND THE WAY FORWARD

CHAPTER ONE INTRODUCTION 1.1 Background of the Study The construction industry is an established industry: the sector regarded as a catalyst for growth while its performance serves as a nation's economy (Aibinu, & Jagboro, 2002). It comprises of building, civil and engineering works. Oliver (2005) affirm the industry to be a prime motivator of any economy, while in Akwa Ibom State, it represen... Continue Reading »

Item Type & Format: Project Material - Ms Word |  76 pages |  Instant Download  |  Chapter 1-5  |  QUANTITY SURVEYING DEPARTMENT

13

VARIATIONS IN RAINFALL AND TEMPERATURE AS AFFECTING MICROBIAL POPULATION UNDER THREE CROPPING SYSTEMS

ABSTRACT This study was carried out in Uyo, Akwa Ibom state between January and April 2017, in order to assess the effect of variations in rainfall and temperature as affecting microbial population under three cropping systems. Soil samples were randomly collected under mixed cropping (MC) plot, sole cropping (SC) plot and uncultivated (UC) plot at auger depth of 0 20 cm. Thermometer was used to m... Continue Reading »

Item Type & Format: Project Material - Ms Word |  40 pages |  Instant Download  |  Chapter 1-5  |  QUANTITY SURVEYING DEPARTMENT

14

A PRICED BILL OF QUANTITIES FOR A TWO BEDROOM BUNGALOW

ABSTRACT The purpose this project is to design a two bedroom bungalow and prepare a priced bill of quantities for the bungalow. The feature of the bungalow is as follows: Kitchen, Dinning, Store, Guest toilet, Car porch and Concrete fascia running all over the external walls. A preliminary estimate was used at the inception stage of the project to predict the probable cost of the bungalow while wo... Continue Reading »

Item Type & Format: Project Material - Ms Word |  52 pages |  Instant Download  |  Chapter 1-5  |  QUANTITY SURVEYING DEPARTMENT

15

COSTS OF HEALTH AND SAFETY MANAGEMENT IN BUILDING SITES: CONTRACTORS’ PERSPECTIVE IN EKET URBAN

TABLE OF CONTENTS TABLES TITLE PAGE Cover Page = = = = = = = = = i Title Page = = = = = = = = = ii Declaration = = = = = = = = iii Certification = = = = = = = = iv Dedication = = = = = = = = v Acknowledgements = = = = = = = = vi Table of Contents = = = = = = = = ix Abstract = = = = = = = = x CHAPTER ONE: INTRODUCTION 1.1 Background of the Study = = = = = = 1 1.2 Statement of Research Problem = = =... Continue Reading »

Item Type & Format: Project Material - Ms Word |  52 pages |  Instant Download  |  Chapter 1-5  |  QUANTITY SURVEYING DEPARTMENT

16

THE EFFECT OF TECHNOLOGY IN THE FIELD OF QUANTITY SURVEYING AND HOW IT AFFECT COST, LABOUR AND TIME

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND TO THE STUDY The construction industry has recently witnessed a paradigm shift from traditional paper based method of service delivery to electronic information exchange using Information Technology (IT), at least in the western world like UK. It is now evident that the adoption of Information Technology can enhance construction productivity and improve comm... Continue Reading »

Item Type & Format: Project Material - Ms Word |  46 pages |  Instant Download  |  Chapter 1-5  |  QUANTITY SURVEYING DEPARTMENT

17

LAND USE APPRAISAL IN OSUN STATE [A CASE STUDY OF OSUN STATE POLYTECHNIC IREE]

ABSTRACT Cement is the third most energy –intensive material to produce, behind steel and aluminum. The production of every tonne of Portland cement contributes about one tonne of carbon dioxide (co2) into the atmosphere. Use of reclaimed and recycled industrial by products, such as supplementary cementing materials (SCMs) to partially replace Portland cement in concrete, reduces green house... Continue Reading »

Item Type & Format: Project Material - Ms Word |  52 pages |  Instant Download  |  Chapter 1-5  |  QUANTITY SURVEYING DEPARTMENT

18

AN EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR WALL TILES (A CASE STUDY OF KADUNA STATE AND ABUJA)

ABSTRACT Productivity is one of the important elements in construction planning and scheduling. However, construction industries in Nigeria are currently lacking in data with regard to productivity of the building’s construction activities especially in tiling works. The focus of the study was to use work study approach to empirically establish labour output for wall tiles for the Nigeria co... Continue Reading »

Item Type & Format: Project Material - Ms Word |  101 pages |  Instant Download  |  Chapter 1-5  |  QUANTITY SURVEYING DEPARTMENT

19

BUILDING COST MANAGEMENT IN AKWA IBOM STATE

ABSTRACT Lack of in depth knowledge of whole life costing implication in building design cost management has over the years fueled the increasing bias towards the quantity surveyors estimate. Whole life costing constitutes cost management tool that enhances better understanding of the cost implication of building design over its life cycle. This study investigated the use of whole life costing in ... Continue Reading »

Item Type & Format: Project Material - Ms Word |  71 pages |  Instant Download  |  Chapter 1-5  |  QUANTITY SURVEYING DEPARTMENT

20

EVALUATING THE ROLE OF QUANTITY SURVEYORS IN SUSTAINABLE INFRASTRUCTURES DEVELOPMENT

TABLE OF CONTENTS INDEX TITLE PAGE Cover Page i Title Page ii Declaration iii Certification iv Approval Page v Dedication vi Acknowledgement vii Table of Contents viii Lists of Tables xi Abstract xii CHAPTER ONE: INTRODUCTION 1.1 Background of the Study 1 4 1.2 Statement of Research Problem 3 4 1.3 Aims and Objectives 4 5 1.4 Research Questions 5 1.5 Hypothesis of the Study 5 1.6 Significance of S... Continue Reading »

Item Type & Format: Project Material - Ms Word |  64 pages |  Instant Download  |  Chapter 1-5  |  QUANTITY SURVEYING DEPARTMENT

Pages:

Cannot find your topic?.. Search for the Project Topic now. It saves time and it is easy

Quick Project Topic Search



Download Quantity Surveying Final Year Research Project Topics - Free Project Topics | Codemint and Research Materials. Get Complete Chapter 1-5 Project Materials and Research Topics for HND, BSc, MSc in Doc & PDF. Final Year Projects and Research Materials on CodeMint

Disclaimer: You can Browse, Read and Download any of the Quantity Surveying Project Topics and Research Materials published here for academic research purposes ONLY, such as guidelines, frameworks, related works or as references for your research work. We don't support any form of plagarism. For no reason should you copy word for word. You these research materials for commercial purposes. You are fully responsible for how you use any information found on this website.
Find Your Department Here