Quantity Surveying Project Topic:
Download Quantity Surveying Final Year Research Project Topics - Free Project Topics | Codemint and Research Materials. Get Complete Chapter 1-5 Project Materials and Research Topics for HND, BSc, MSc in Doc & PDF. Final Year Projects and Research Materials on CodeMint
Filters: Undergraduate (HND,BSc,BTech) Masters (MSc,MTech) PhD Thesis
LIST OF QUANTITY SURVEYING PROJECT TOPICS AND MATERIALS | ||
---|---|---|
S/N | Project Topic | |
1 |
AN INVESTIGATION INTO RISK MANAGEMENT PRACTICES AMONGST QUANTITY SURVEYORS IN THE NIGERIAN CONSTRUCTION INDUSTRYCHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Quantity surveying is concerned with controlling and managing construction projects. The Nigerian construction industry is faced with uncertainties. With construction targets not being met and high rate of abandoned construction projects, there is great need for proper risk assessment and implementation. Managing risks in construction projects h... Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT | |
2 |
ASSESSMENT OF CONTRACTORS’ RISK ALLOWANCE PRACTICE IN TENDER FOR BUILDING PROJECTSTABLE OF CONTENTS Title Pages Cover page i Title Page ii Certification iii Dedication iv Acknowledgements v Abstract vi Table of Contents vii CHAPTER ONE Introduction 1 1.1 Background to Study 1 1.2 Statement of the Research Problem 4 1.3 Aim and Objectives 4 1.4 Research Question 5 1.5 Hypothesis of the Study 5 1.6 Significance of the Study 5 1.7 Scope and Delimitation of the Study 6 1.8 Organiza... Continue Reading »Item Type & Format: Project Material - Ms Word | 70 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT | |
3 |
ASSESSMENT OF COST ESTIMATING RISKS INFLUENCING BUILDING PROJECTS’ ESTIMATES IN ABIA STATETABLE OF CONTENTS Index Title Page Cover Page . . . . . . . . . . i Title Page . . . . . . . . . . ii Declaration . . . . . . . . . . iii Certification . . . . . . . . . . iv Dedication . . . . . . . . . . v Acknowledgements . . . . . . . . . vi Table of Contents . . . . . . . . . vii Abstract . . . . . . . . . . x CHAPTER ONE: INTRODUCTION 1.1 Background of the Study . . . . . . . 1 1.2 Statement... Continue Reading »Item Type & Format: Project Material - Ms Word | 46 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT | |
4 |
THE IMPACT OF PROCUREMENT SYSTEMS ON CONSTRUCTION COST AND DELIVERYCHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY The construction industry is an importan t part of the economical backbone in many countries (Ngai et al., 2002), often accounting for between 7 10 percent of the Gross Domestic Product (Winch, 1996, Voordijk et al., 2000). Furthermore, construction products and processes have a large impact on safety, health and environmental aspects (Bayliss e... Continue Reading »Item Type & Format: Project Material - Ms Word | 79 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT | |
5 |
EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR FLOOR SCREED AND TILE FINISHES FOR CONSTRUCTION WORK IN ABUJAABSTRACT There is dearth of information on output level of building operatives in Nigeria, consequently, the output constants currently used for preparation of construction estimates are remnants of British colonial heritage or derived from untested experiences. Therefore this study aims at empirically determining output constants for floor finishes (screeds and tiles) for building project in Abuj... Continue Reading »Item Type & Format: Project Material - Ms Word | 112 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT | |
6 |
THE IMPACT OF PROJECT CHARACTERISTICS ON THE DIFFERENCE BETWEEN CONTRACT SUM AND FINAL ACCOUNT IN NIGERIATABLE OF CONTENTS INDEX TITLE PAGE Cover Page i Title Page ii Declaration iii Certification iv Dedication v Acknowledgement vi Table of Contents vii Lists of Tables ix Abstract ix CHAPTER ONE: INTRODUCTION 1.1 Background of the Study 1 1.2 Statement of Research Problem 3 1.3 Aims and Objectives 4 1.4 Research Questions 4 1.5 Hypothesis of the Study 5 1.6 Significance of Study 6 1.7 Scope of the St... Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT | |
7 |
IMPACT OF PROJECT GOVERNANCE STRUCTURE ON THE PERFORMANCE OF PUBLIC BUILDINGS IN IMO STATECHAPTER ONE INTRODUCTION 1.1 Background to the Study Project governance is the management framework within which project decisions are made. Project governance is a critical element of any project since while the accountabilities and responsibilities associated with an organization’s business as usual activities are laid down in their organizational governance arrangements, seldom does an equiva... Continue Reading »Item Type & Format: Project Material - Ms Word | 68 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT | |
8 |
IMPACT OF CONSTRUCTION SKILLED LABOUR SHORTAGES ON THE COMPETITIVENESS OF BUILDING SECTOR IN NIGERIAABSTRACT Skilled workforce is critical to the socio economic development of a country and forms the backbone of the construction industry. This study investigated the problem of construction skilled labour shortages and their impact on the competitiveness of building sector in South East, Nigeria. The objectives were to evaluate the magnitude of skilled labour shortages, identify the root causes o... Continue Reading »Item Type & Format: Project Material - Ms Word | 62 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT | |
9 |
EFFECTS OF SAFETY CULTURE ON CONSTRUCTION SAFETY PERFORMANCE IN AKWA IBOM STATETABLE OF CONTENTS Title Page i Certification ii Approval page iii Dedication iv Acknowledgement v Table of Contents vi List of Tables vi List of Figure vii Abstract x CHAPTER ONE: INTRODUCTION 1.1 Background of the Study 1 1.2 Statement of Problems 4 1.3 Research Questions 6 1.4 Aim and Objectives 6 1.5 Scope of the Study 7 1.6 Significance of the Study 7 CHAPTER TWO: LITERATURE REVIEW 2.1 Introdu... Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT | |
10 |
ANALYSIS OF EFFICIENCY OF AIR PASSENGER SUPPORT SERVICES A CASE STUDY OF MURTALA MOHAMMED INTERNATIONAL AIRPORTCHAPTER ONE INTRODUCTION 1.1 Background Of The Study Passengers leaving on a trip normally want to spend as little time as possible in the terminal. They want to have baggage carts readily available, a fast check in, and little time waiting before and quick boarding prior to a timely departure. Passengers do not appreciate long line ups, repetitive security checks, crowded departure areas, line up... Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT | |
11 |
AN APPRAISAL OF THE READINESS OF NIGERIAN BUILDING CONSULTING FIRMS TO ADOPT LEAN CONSTRUCTION PRINCIPLESABSTRACT Studies have shown that construction projects are susceptible to problems such as low productivity, poor safety, inferior working conditions, insufficient quality, lack of timely communication and coordination amongst project stakeholders, and rising litigation. The adoption of lean construction principles within the manufacturing and other industries had led to notable improvement and re... Continue Reading »Item Type & Format: Project Material - Ms Word | 79 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT | |
12 |
INFLUENCE OF LABOUR PRODUCTIVITY ON THE COST PERFORMANCE OF THE TRADITIONALLY PROCURED PROJECTSTABLE OF CONTENTS Index Title Page Title page…………………………………………………………..i Declaration…………………………………………………………ii Certification…………………………………………………………iii Approval page………………………………………………………..iv Dedication……….…………………... Continue Reading »Item Type & Format: Project Material - Ms Word | 47 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT | |
13 |
ASSESSMENT OF VALUE MANAGEMENT PRACTICES AND ITS IMPACT ON CONSTRUCTION PROJECT DELIVERYCHAPTER ONE INTRODUCTION 1.1 Background to the Study Value management (VM) originated as value analysis, a concept developed by Lawrence Miles during the Second World War (Shen and Liu, 2004) and was popular in the US manufacturing industry during the 1940s. According to Perera, Hayles, and Kerlin (2011), Miles’s work based its philosophy on providing the necessary functions at the lowest cost. ... Continue Reading »Item Type & Format: Project Material - Ms Word | 63 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT | |
14 |
A SURVEY OF COST ESTIMATING PRACTICES OF CONSTRUCTION CONTRACTORS IN AKWA IBOM STATEABSTRACT Cost estimating is a key activity in quantity surveying profession and in contractor's organisation. The research work is to investigate into current cost estimation practices of contractors in Akwa Ibom state. The objectives were to identify the techniques used in cost estimating by the construction contractors, identify the causes of inaccuracy in construction contractors cost estimates... Continue Reading »Item Type & Format: Project Material - Ms Word | 62 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT | |
15 |
DISTANCE AND PRICE OF SELECTED BUILDING MATERIALSABSTRACT Over the years, there has been an increasing cost of building projects. This work aims at examining the extent of the trend of increase and decrease of prices of materials used for building. price of selected materials is based on choice , and model suitable for the kind of structure ,be in roofing, painting, tiling ,plumbing more to mention, the transaction of price is between the contra... Continue Reading »Item Type & Format: Project Material - Ms Word | 62 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT | |
16 |
ASSESSMENT OF DELAY AND ITS IMPACT ON CONSTRUCTION PROJECT DELIVERY IN AKWA IBOM STATEABSTRACT Construction industry is considered as one of the most important industries in Nigeria. Most construction projects in Nigeria and other developing countries are characterized by overrun in time (delay) in their completion due to various reasons in the world and Akwa Ibom state is no exception. Delay has always contributed high expenses to all parties. Once a project is delayed, it has a n... Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT | |
17 |
INVESTIGATING THE EFFECTIVENESS OF INSURANCE AS RISK MANAGEMENT TOOL IN CONSTRUCTION INDUSTRYTABLE OF CONTENTS Index Title Page Title page…………………………………………………………..i Declaration…………………………………………………………ii Certification…………………………………………………………iii Approval page………………………………………………………..iv Dedication……….…………………... Continue Reading »Item Type & Format: Project Material - Ms Word | 76 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT | |
18 |
USE OF ALTERNATIVE DISPUTE RESOLUTION MECHANISMS IN THE SETTLEMENT OF CONSTRUCTION PROJECT DISPUTES IN AKWA IBOM STATEABSTRACT Dispute is a disagreement between two or more individuals or groups over incompatible goals. Without an effective construction dispute resolution plan, the possibility for dispute escalation and diverse impactful adverse resultant effects is guaranteed. The study examined the use of alternative dispute resolution mechanisms in construction dispute settlement in Akwa Ibom State. The object... Continue Reading »Item Type & Format: Project Material - Ms Word | 73 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT | |
19 |
IMPACT OF COMPETITIVE BIDDING STRATEGY ON THE COST OF PUBLIC CONSTRUCTION WORKS IN AKWA IBOMSTATETABLE OF CONTENTS Tables Title Page Cover Page = = = = = = = = = i Title Page = = = = = = = = = ii Declaration = = = = = = = = = iii Certification = = = = = = = = = iv Dedication = = = = = = = = v Acknowledgements = = = = = = = = vi Table of Contents = = = = = = = = vii Lists of Tables = = = = = = = = x Abstract = = = = = = = = xi CHAPTER ONE: INTRODUCTION 1.1 Background of the Study = = = = = = 1... Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT | |
20 |
ASSESSMENT OF THE INFLUENCE OF UNETHICAL PRACTICES ON BUILDING PROJECT COST PERFORMANCETABLE OF CONTENTS Title Pages Cover page i Title Page ii Certification iii Dedication iv Acknowledgements v Table of Contents vi Abstract x CHAPTER ONE Introduction 1 2 1.1 Background to Study 2 1.2 Statement of the Research Problem 2 1.3 Aim and Objectives 4 1.4 Research Questions 4 1.5 Hypothesis of the Study 5 1.6 Significance of the Study 5 1.7 Scope and Delimitation of the Study 6 1.8 Definit... Continue Reading »Item Type & Format: Project Material - Ms Word | 63 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT |
Download Quantity Surveying Final Year Research Project Topics - Free Project Topics | Codemint and Research Materials. Get Complete Chapter 1-5 Project Materials and Research Topics for HND, BSc, MSc in Doc & PDF. Final Year Projects and Research Materials on CodeMint