CAUSES AND EFFECTS OF DESIGN VARIATION IN ROAD CONSTRUCTION PROJECTS IN AKWA IBOM STATE

CAUSES AND EFFECTS OF DESIGN VARIATION IN ROAD CONSTRUCTION PROJECTS IN AKWA IBOM STATE

  • The Complete Research Material is averagely 63 pages long and it is in Ms Word Format, it has 1-5 Chapters.
  • Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
  • Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
  • Full Access Fee: ₦4,000

Get the complete project » Instant Download Active

CHAPTER ONE

INTRODUCTION

1.1       Background of the Study

The complexity of the construction industry due to different stakeholders’ involvement makes it differ from other industries. This complexity leads to unwanted situations like variations with their associated effects. And presently, it is almost becoming a rare thing for a construction project not to have variation. Most contracts these days must make provisions for possible variations given the nature of road construction project (Finsen et al., 1999). (Uff, 2005) further pointed out that a clause permitting variation of works is an essential feature of any construction contract because without it the contractor is not bound to execute additional work or to make omissions or changes. In line with these, the nature and approach to the conception, planning and subsequent actualization of construction projects are dynamic, complex, sophisticated and capital intensive in recent times. In consequence, these projects are subjected to adequate appraisals by the sponsors on the basis of political, social, projects relatives’ benefits, externalities, etcetera, with a view of ascertaining the values of money (Onwusoye, 2005). The certification for the realization of this objection through various techniques and other implied factors by the potential owner of the projects leads to the eventual take off of a construction project. Therefore, design variation need to be critically addressed as this continue to be a frequent problem that gets worse often in construction project. Though of recent, it is a common phenomenon for design variation to occur on construction project. But under normal circumstance, it is possible for a complex set of drawings and specification to be available for preparation of fully described and accurate bill of quantities for tendering purposes. These would deplete further charges as a result of design changes during the construction stage.

According to the J.C.T. 80, design variation in road construction refers to a change in the works initiated by the engineers, consultants, employer or other factors as the case may be which involves the alteration of any kind or standard of materials to be used in the work. A design change is regarded as any change in the design or construction of a project after the contract is awarded and signed, and such changes are related not only to matters in accordance with the provision of the contract but also changes to the work conditions. Akinsola et al (1997) also noted that these changes as any additions, omission or adjustment to the contract price or contract time, and it occurs regularly on construction projects. Park (2002) defined design variation as a change to the work state,  processes or methods that differ from the original construction plan or specification and usually resulted from different in work quality and condition, scope changes or uncertainties that make construction dynamic and unstable. Affirmed that design variations are inevitable on major construction projects particularly on road construction where the project is complex, the ground conditions variables or the employer desire to incorporate the latest technology into the project. And the more design changes on a project, the greater effect which become time consuming and costly in construction projects (Mohamed, 2001). It is therefore of greater concern regarding the adverse effects of the design changes in both public and private construction in Akwa Ibom State.

According to Arian and Pheng (2005), design variation on road construction project resulted into a substantial increment in amount of funding budgeted for the work, hence caused the inability to complete and handover the work as agreed initially at the commencement of the work. As a result of this, it is extremely noticeable that time and cost overrun occurs due to variation in many construction projects especially road construction. Similarly, variation order which contains a set of instructions that allows changes or modifications to be made to as earlier agreement in terms of volume or nature of task to be carried out, (O’Brien, 1998). These changes are however occur after the award of the initial contract or after work might have commenced at the construction sites. The changes may be due to various reasons such as the modification of original design and scope, schedule, costs and methods.

Variation from the original project design is seen as the major causes of project failure, though project monitoring and control could cause corrective actions to bring deviation during construction but failed to take  cognizance of identifying and analyzing the root cause of such variation  (Ubani, Nwanchukwu and Nwukonkwo, 2010). The performance objectives defect due to variation of many completed and ongoing road projects resulted in employer’s dissatisfaction, project time extension and cost overrun, low quality and substandard outputs, project conflicting between the contractors and employers arising from variation in contract sum. And the unusual thing about it is the extent of such differences as well as the frequency occurrence. The causes and cost implication of variation needs to be assessed and analysed at the onset of the project, and it is on this background that the study was carried out.

1.2       Statement of the Problem

All road construction projects undergo various degrees of design variations throughout the project life cycle. Changes in construction projects are inevitable particularly when the actual work commences to correct or modify original design or scope of work (Alnuaimi et al., 2010). The research study by Naoum (1997) highlighted the lack of time and effective communication, lack of integration, uncertainty, a changing environment and increasing project complexity as the drivers of design changes.

According to a study by Ogunlana, Promkuntong and Jearkjirm (2000), construction owners are the major causes of design variations due to changing plans in line with the changing economic climate to meet customer demands or for making marketing reasons. Design variation need to be constantly monitored to avoid escalation (Olawale and Sun, 2010). Although design changes are widely acceptable by the practitioners in the construction industry, however, its effect on project performance is undesirable. Overruns in project schedule and project cost are key principles for a successful project that adversely impacted by design variations (Frimpong et al., 2003). Therefore, the occurring and re-occurring of variation in most road construction projects has become a natural phenomenon, hence the study is set out to identify and critically assess the causes and effects of design variations in road construction project.

Construction projects in Nigeria with much emphasis on Akwa Ibom State are mostly characterized by time delay, substandard work, disputes and abandonment of project cause by variation. This phenomenon poses a big threat to the construction industries in Nigeria. Most road construction projects especially in Akwa Ibom State are abandoned not usually as a result of lack of technical skill to do the work, but because of the extension of time and its attendant cost implication caused by variation. The consequence of this has marked a negative effect both on the economy and social conditions, hence the study seeks to address these causes of design variation on road projects in order to minimize its occurrence.

1.3       Research Questions

In order to achieve the objective of this study, the following research questions are looked into:

1.                  What are the causes of design variation in road construction project in Akwa Ibom State?

2.                  What are the effects of design variation on road construction project in Akwa Ibom State?

3.                  What are the measures to be adopted to minimizing design variation in road construction project in Akwa Ibom State?

1.4       Aim and Objectives of the Study

This research study aims at identifying the causes and effects of design variation in construction project in Akwa Ibom State.  The specific objectives are to:

1.                  examine the causes of design variation in road construction project in Akwa Ibom State;

2.                  investigate the effects of design variation on road construction project in Akwa Ibom State; and

3.                  examine the measures to involving the employer and contractor during project design stages to cushion the effect of variation.

1.5       Scope of the Study

This research study was limited to road construction projects in Akwa Ibom State. Identifying and analyzing the design variation factors and addressing them on time is a construction project to either eliminating or narrowing the adverse effect on the performance of project management and the gap between project planned progress and project actual progress. To assist in this research work, information and data would be gathered from the following professionals, ministries and agencies such as civil Engineers, Structural Engineers, Quantity Surveyors, Surveyors, Ministry of Works, Construction Companies and FERMA to facilitate in the identification of the causes of design variation in a quest to minimizing the adverse effect in construction project tin Akwa Ibom State.

1.6       Significance of the Study

The results of the study would be of benefit to the government, private individual and corporate sectors and researchers. Government who normally engaged on road construction project will find this work very useful by having full knowledge of the causes and effects of design variation in her infrastructural project in Akwa Ibom State to ensure that appropriate measures are taken at each time of construction to avoid adverse effect to any project completion. This study information will be of important to private individuals and corporate bodies who are interested in the procurement of both civil engineering especially road construction project to reduce the risk and adverse effect involved in design variation in any construction project. The outcome of this work would also be useful as additional information to those who would carryout further research into related topic of its kind regarding the causes and effects of design variation in construction project.


You either get what you want or your money back. T&C Apply







You can find more project topics easily, just search

Quick Project Topic Search