NOTATION
ld Development length
MU Ultimate test bending moment
Q Applied load
BS Ultimate bond stress recommended in BS 8110 : 1997
cal Theoretical bond stress
t Test bond stress
X Depth to neutral axis
Steel ratio, AS /bd
e Effective bar size
cu Strain in concrete in compression
s Strain in tension reinforcement
Bond coefficient
As Area of steel
fs Stress in steel
ls Splice length
db Nominal bar diameter
Atr Area of transverse reinforcement
fcu Characteristics strength of concrete
av Shear span
St Spacing of transverse reinforcement
Ecs + Ustr Epoxy coated splice + uncoated stirrups
Ecs + Cstr Epoxy coated splice + coated stirrups
Ucs + Nstr Uncoated splice + no stirrup.
Tables
Table 1: Cube compressive strength result on trial mix
Table 2: Sieve analysis for fine aggregate
Table 3: sieve analysis for coarse aggregate
Table 4: Tensile test results
Table 5: Beam parameters
Table 6: Characteristics of hognestad stress block
Table 7: Beam data
Table 8: Strength achieved for control cubes
Table 9: Beam test results
Figures
Figure 1: Diagram showing side split failure
Figure 2: V-notch failure
Figure 3: Face-and-side split failure
Figure 4: Pull out failure
Figure 5: Beam with no transverse reinforcement in the splice region
Figure 6: Beam with transverse reinforcement overlap
Figure 7: Shear force and bending moment diagrams
Figure 8: Schematic of test set-up
Figure 9: Strain and stress distribution at failure
Figure 10: Hognestad and Evans stress block………………………………………..
Figure 11: Graph of sieve analysis for fine aggregate……………………………….
Figure 12: Graph of sieve analysis for coarse aggregate………………………..
Figure 11: Effect of coating of stirrups on bond efficiency………………..
Figure 12: Effect of coating of stirrups on bond efficiency……………………
Figure 13: Effect of coating of stirrups on bond efficiency…………………….
Plates
1. Trial Mix
(a) Sieve analysis of coarse aggregate for Trial mix
(b) Batching of coarse aggregate by weight for Trial mix
(C) Sieving of aggregate for Trial Mix
(d) Trial Mix freshly cast
2. Compressive strength of trial mix
(a) Weighing of Trial mix cube
(b) Compression testing machine
(c) Cube placed in compression testing machine
(d) Cube being taken out after crushing
3. Silt Test
(a) Sand and Salt Solution being mixed together
(b) Settling of particles in the measuring cylinder
4. Epoxy coated reinforcement
(a) Mixing of the coating material
(b) Spraying of the reinforcement
(c) Epoxy coated reinforcement
(d) Coated steel bars kept in the lab
5. Formwork in place
6. Reinforcement cages placed inside the formwork.
7. Slump test carried out in-situ
(a) Slump test being carried out
(b) Difference in height being measured
8. Beam specimen freshly demoulded
9. Curing process
10. Tensile strength
(a) Tensile testing machine
(b) Reinforcement being fixed in machine
(c) Tensile machine gripping the reinforcement
(d) Result being printed out
11. Crack pattern in beam with coated stirrups on coated splice region
(a) Splitting in the splice region.
(b) Cracks in the shear region.
12. Crack pattern in beams without stirrups on uncoated splice region
(a) Splitting in the splice region.
(b) Cracks in the shear region.
13. Crack pattern in beams with uncoated stirrups on coated splice region
(a) Splitting in the splice region.
(b) Cracks in the shear region.
You either get what you want or your money back. T&C Apply

You can find more project topics easily, just search
-
SIMILAR CIVIL ENGINEERING FINAL YEAR PROJECT RESEARCH TOPICS
-
1. IMPROVEMENT OF BEARING CAPACITY OF SANDY SOIL BY GROUTING
» CHAPTER ONE 1.0 INTRODUCTION The construction of structure on weak ground often requires the soil to be improved in order to ensure the safet...Continue Reading »Item Type & Format: Project Material - Ms Word | 50 pages |
Instant Download | Chapter 1-5 | CIVIL ENGINEERING DEPARTMENT
-
2. PAVEMENT DESIGN IN NIGERIA: A CASE STUDY OF LAGOS-IBADAN EXPRESSWAY
» ABSTRACT This study researched into how new and existing highways in Nigeria can be designed for construction or reconstruction to check under design ...Continue Reading »Item Type & Format: Project Material - Ms Word | 106 pages |
Instant Download | Chapter 1-5 | CIVIL ENGINEERING DEPARTMENT
-
3. COMPARATIVE ANALYSIS OF PIPEBORNE WATER AND OTHER SOURCES OF WATER WITHIN ENUGU METROPOLIS FOR HUMAN CONSUMPTION.(INDEPENDENCE LAYOUT LOCALITY)
» CHAPTER ONE INTRODUCTION Following the theory of creation, it is clear that water is as old as man. From time immemorial, man has restored to the use ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | CIVIL ENGINEERING DEPARTMENT
-
4. CONSTRUCTION OF DIGITAL WATER LEVEL CONTROLLER
» ABSTRACT Technological advancement has cuts across all aspect of human activities. However, it is on this platform that the need to minimize or check ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | CIVIL ENGINEERING DEPARTMENT
-
5. SOIL STABILIZATION METHODS AND MATERIALS
» TABLE OF CONTENTS PREFACE............................................................................................................................ ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | CIVIL ENGINEERING DEPARTMENT
-
6. EFFECTS OF SOLID WASTES ON THE QUALITY OF UNDERGROUND WATER [A CASE STUDY OF IKIRUN, OSUN STATE]
» ABSTRACT This research paper examines the effects of solid wastes, quality and its control on groundwater pollution in Ikirun (Maboreje and Okea...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | CIVIL ENGINEERING DEPARTMENT
-
7. SUSTAINABILITY STRATEGIES IN ENGINEERING INFRASTRCUTURE IN DEVELOPING COUNTRIES; A CASE STUDY OF SELECTED SOUTH WESTERN REGION OF NIGERIA
» CHAPTER ONE INTRODUCTION Background of Study Sustainability issue in recent times has dominated the arena of discussion in built environment. Billions...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | CIVIL ENGINEERING DEPARTMENT
-
8. AN INVESTIGATION INTO QUALITY OF AGGREGATE IN ROAD CONSTRUCTION
» ABSTRACT The current extensive use of low quality aggregate in Nigerian road for engineering applications is of concern because they appear to be a le...Continue Reading »Item Type & Format: Project Material - Ms Word | 90 pages |
Instant Download | Chapter 1-5 | CIVIL ENGINEERING DEPARTMENT
-
9. AN INVESTIGATION INTO THE PROPERTIES OF STABILIZED LATERITE BLOCKS
» ABSTRACT Sustaining housing development especially to the medium/low income group of the society has become a huge challenge particularly because of t...Continue Reading »Item Type & Format: Project Material - Ms Word | 50 pages |
Instant Download | Chapter 1-5 | CIVIL ENGINEERING DEPARTMENT
-
10. DESIGN AND CONSTRUCTION OF AUTOMATIC PUMPING MACHINE FOR WATER SUPPLY.
» CHAPTER ONE INTRODUCTION Water is an indispensable and inevitable substance to all living things due to its usability and high priority among other su...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | CIVIL ENGINEERING DEPARTMENT