CHAPTER ONE
INTRODUCTION
1.1 BACKGROUND OF THE STUDY
When asked to define "design error," not all disciplines in the construction process agree on a common definition. Depending on which discipline you address, the owner, the designer or the contractor, there will be a common understanding surrounded by varied conclusions, "a mistake." From the basic definitions of "design" and "error" we conclude that a design error is a deviation from a drawing or specification, also including omissions and ambiguities. It is the seriousness of this error that must be considered to determine its consequences on the overall outcome of the project. One of the most important challenges facing management today is controlling the ball too frequent final cost and schedule overruns that effect the construction industry (Diekmann and Thrush, 1986). One of the major issues to control growth in project final costs and time is the reduction of design errors.
The owner, designer and contractor all have different interests in, or uses for the design of a facility. But what they do share is the commitment to complete the project safely and within a given budget and completion time. There are many initiatives being conducted to control the growth of final cost and schedule within the construction industry.
The major issue is "accuracy of the drawings," or the number of design errors, omissions and ambiguities within the plans and specifications that affect the quality of the facility. Inadequacies in the plans and specifications are the major causes of changes to the contract So much emphasis is placed on the issue of time and final cost that quality takes a back seat .The quality of the project depends on the conformance of the objectives and requirements from the owner. An informative quality management technique will provide an agreement to procedures and definitions among the principle parties for the project. Since design errors have an impact on the outcome of the effectiveness of the contractor's effort on the project it is essential that all parties determine what the definition of a design error should be.
1.2 STATEMENT OF THE PROBLEM
Design errors indicate the total design in-effectiveness of a project. Major design quality problems occur during construction when errors, omissions and ambiguities in plans and specifications become evident (Davis and Ledbetter, 1987). This statement directs that the inadequacies in the plans and specifications are the major causes of changes to the contract. There have been extreme examples of design errors such as numerous building collapses in Nigeria - projects that have wrought disaster after the construction are completed. These are examples of design errors that escaped the close scrutiny of all parties. One or two major errors that can be corrected with only initial cost considerations and little effect on the schedule can impact projects. The projects that really suffer are those with many small errors (design, rework or change of scope) which when finally added up causes major impacts on the final cost and schedule growth. Through Davis and Ledbetters research it was determined that "accuracy of the design documents" was the most critical of the criteria used in the initial evaluation of design effectiveness. This accuracy was further described as the concern for the frequency and impact of errors in the specifications and drawings. This is due to the fact that the drawings and specifications are the most "readily identifiable outputs of the design process." It is even more important that the quality control of designs be addressed during the planning phase and closely monitored during the construction phase.
Design errors of a project have been an issue that has been misconstrued. The attitude towards design errors in the country can now be best described as tardy and unsatisfactory.
1.3 AIM AND OBJECTIVES OF THE STUDY
1.3.1 AIM
The main aim of the study is to investigate how design errors can affect the final cost of a project.
1.3.2 OBJECTIVES
The specific objectives are:
- To determine what constitutes a design error.
- To examine the contributing factors to design errors in Nigeria.
- To examine how these factors can affect final cost of a project.
- To proffer solutions on how to minimise cost of construction projects in Nigeria.
1.4. RESEARCH QUESTIONS
- What are design errors in construction projects?
- What makes or contributes to a design error?
- What are the factors that lead to design errors?
- What effect can design errors have on final cost and growth of a project?
- Who is responsible for design error?
1.5 HYPOTHESIS FORMULATION
H0: Design error affect final cost of a building construction project.
H1: Design error does not affect final cost of a building construction project.
H0: Design errors causescost overrun in a building construction project.
H1: Design errors does not causecost overrun in a building construction project.
H0: Additional work causes additional cost in a building construction project due to design errors.
H1: Additional work does not cause additional cost in a building construction project due to design errors.
1.6 SIGNIFICANCE OF THE STUDY
This study gives a clear insight into the various ways in which contractors in the construction companies in Nigeria can maximise profits and reduce final cost through effective and efficient contract planning and management. The study also gives a clear insight into the various effects of design errors on the final cost of a project. The findings and recommendations of the researcher will help in building a strong and better project management guideline for contractors in Nigeria.
Also, the study of the investigation of the effect of design errors on the final cost of a project will provide results that will offer the following benefits:
- Establish the scope and methodology of design functions performed by Architectural firms for the benefit of the entire construction industry including prospective building clients.
- Assist designers in understanding the cost implication of design errors, so that they can make objective design decisions during the early phase of a project.
- Avail the designer with a tool for eradicating errors that are directly related to the designer that delay and or add cost to the project.
1.7 SCOPE OF STUDY
The study is on the investigation of the effect of design errors on the final cost of a project. It is narrowed down to building construction projects in Imo state of Nigeria.
1.8 LIMITATION OF THE STUDY
The only limitation faced by the researcher in the course of carrying out this study was the delay in getting data from the various respondents. Most respondents were reluctant in filling questionnaires administered to them due to their busy schedules and nature of their work. The researcher found it difficult to collect responses from the various respondents, and this almost hampered the success of this study.
1.9 DEFINITION OF TERMS
- Design: The basic definition of design, according to Webster, is "the making of drawings or plans to plan and fashion the form and structure of an object to have intentions or purposes." The quality of planning and design is one of the primary factors of success in any project endeavour (Chalabi, Beaudin and Salazar, 1987). The design includes every aspect of the facility construction including operation and maintenance. The design incorporates a set of specifications to guide the contractor in developing his means and methods of construction.
- Error: An error is defined, according to Webster, as "a deviation from accuracy or correctness; a mistake, as in action or procedure; an inaccuracy, as in speaking or writing." There are basically three types of errors: imperfections, non-conformance and omissions. Imperfections are deviations in details that have no affect on the assembly or facility (Davis and Ledbetter, 1987).
- Design Error: From the evaluation above a simple definition of design error is "a deviation from the plans and specifications." It is not the intention of this definition to include any final cost or schedule growth or insinuate its root causes or legal responsibility. It is the responsibility of the owner, designer and contractor to establish the criteria in order to make a reasonable determination for responsibility. The survey shows a common theme, that of a mistake or error in the design. The survey also indicates several reasons why design errors exist and who cause them. This provides evidence that there is not a concise definition within the construction industry.
- Contract: Erikson (2002) defined Contract as an agreement that creates an obligation binding upon the parties thereto. The essentials of a contract are as follows: (1) mutual assent; (2) a legal consideration, which in most instances need not be pecuniary; (3) parties who have legal capacity to make a contract; (4) absence of fraud or duress; and (5) a subject matter that is not illegal or against public policy.
- Contract Planning: According to Simmons (2007),Contract planning is the process of systematically and efficiently managing contract creation, execution and analysis for maximising operational and financial performance and minimising risk.
- Contractor: General contractor, organization or individual that contracts with another organization or individual (the owner) for the construction of a building, road or other facility.
- Profit: Tucy (2008) defined profit as the difference between the purchase price and the initial costs of bringing to market.
- Final Cost: final costare not fixed, expenses incurred on the purchase of land, buildings, construction, and equipment used in the production of goods or in the rendering of services. Put simply, it is the total final cost used to bring a project to a commercially operable status.
You either get what you want or your money back. T&C Apply

You can find more project topics easily, just search
-
SIMILAR PROJECT MANAGEMENT FINAL YEAR PROJECT RESEARCH TOPICS
-
1. PROJECT COST CONTROL IN THE NIGERIAN CONSTRUCTION INDUSTRY (A CASE STUDY OF EL-ALAN CONSTRUCTION COMPANY (NIGERIA) LIMITED)
» CHAPTER ONE INTRODUCTION Background of the study Project cost controls in the Nigerian construction sector have always been under studied. On the cour...Continue Reading »Item Type & Format: Project Material - Ms Word | 69 pages |
Instant Download | Chapter 1-5 | PROJECT MANAGEMENT DEPARTMENT
-
2. MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA
» ABSTRACT Following widespread acceptance by researchers that the effects of qualitative/managerial construction time influencing factors need to be co...Continue Reading »Item Type & Format: Project Material - Ms Word | 115 pages |
Instant Download | Chapter 1-5 | PROJECT MANAGEMENT DEPARTMENT
-
3. IMPACT OF MATERIALS MANAGEMENT IN THE PRODUCTVITY OF AN ORGANIZATION
» CHAPTER ONE 1.0 Introduction It is quite obvious that every organization keeps materials which form one of the pivotal elements in the organization. A...Continue Reading »Item Type & Format: Project Material - Ms Word | 55 pages |
Instant Download | Chapter 1-5 | PROJECT MANAGEMENT DEPARTMENT
-
4. ASSESSMENT OF FACTORS AFFECTING COST PERFORMANCE OF CONSTRUCTION PROJECT IN NIGERIA
» Chapter one Introduction 1.1. Background of the Study Construction industry has complexity in its nature because it contains a large number of parties...Continue Reading »Item Type & Format: Project Material - Ms Word | 63 pages |
Instant Download | Chapter 1-5 | PROJECT MANAGEMENT DEPARTMENT
-
5. EXPLORING OPTIONS FOR IMPROVING LIVELIHOODS AND RESOURCE MANAGEMENT IN NIGERIA COASTAL COMMUNITIES
» CHAPTER ONE INTRODUCTION 1.1 BACKGROUND TO THE STUDY Nigeria is endowed with a long coastline of about 960km, a large area of inshore waters, and a va...Continue Reading »Item Type & Format: Project Material - Ms Word | 65 pages |
Instant Download | Chapter 1-5 | PROJECT MANAGEMENT DEPARTMENT
-
6. APPRAISAL OF STAKEHOLDER MANAGEMENT PRACTICE IN TERTIARY EDUCATION TRUST FUND (TETFUND) CONSTRUCTION PROJECTS
» ABSTRACT Several researchers have identified the importance of managing stakeholders as major criteria for determining project success. Project succes...Continue Reading »Item Type & Format: Project Material - Ms Word | 90 pages |
Instant Download | Chapter 1-5 | PROJECT MANAGEMENT DEPARTMENT
-
7. IMPACT OF EFFECTIVE BUILDING PRODUCTION MANAGEMENT IN SUCCESSFUL BUILDING PROJECT DELIVERY IN AWKA ANAMBRA STATE
» ABSTRACT The purpose of this study was to determine the impact of effective building production management in successful building project delivery in ...Continue Reading »Item Type & Format: Project Material - Ms Word | 48 pages |
Instant Download | Chapter 1-5 | PROJECT MANAGEMENT DEPARTMENT
-
8. ASSESSING THE EFFECTIVENESS OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROCUREMENT MODEL FOR INFRASTRUCTURE DEVELOPMENT IN NIGERIA
» ABSTRACT Several researchers have identified the importance of managing stakeholders as major criteria for determining project success. Project succes...Continue Reading »Item Type & Format: Project Material - Ms Word | 134 pages |
Instant Download | Chapter 1-5 | PROJECT MANAGEMENT DEPARTMENT
-
9. IMPACT OF SAFETY MEASURES ON WATER TRANSPORTATION IN NIGERIA
» Abstract This study is on impact of safety measures on water transportation in Nigeria. The total population for the study is 200 staff of ministry of...Continue Reading »Item Type & Format: Project Material - Ms Word | 58 pages |
Instant Download | Chapter 1-5 | PROJECT MANAGEMENT DEPARTMENT
-
10. RISK IDENTIFICATION AND ASSESSMENT IN HOUSING DEVELOPMENT PROJECTS USING ANALYTICAL HIERARCHICAL PROCESS
» ABSTRACT The construction industry and housing subsector is fraught with risks that have the potential of negatively impacting on the achievement of p...Continue Reading »Item Type & Format: Project Material - Ms Word | 167 pages |
Instant Download | Chapter 1-5 | PROJECT MANAGEMENT DEPARTMENT