CHAPTER ONE
INTRODUCTION
1.1 PREAMBLE
Prestressed concrete beam is one of the most widely used construction element in bridge projects around the world. It has rent itself to an enormous array of structural applications, including buildings, bridges, nuclear power vessels, Television towers and offshore drilling platform (Antonie,2004).
Prestressing involves inducing compressive stresses in the zone which will tend to become tensile under external loads. Thesecompressive stresses neutralize the tensile stresses so that no resultant tension exists (or in only very small values). Cracking is therefore eliminated under working load and all of the concrete may be assumed effective in carrying load. Therefore lighter sections may be used to carry a given bending moment and over much longer spans than reinforced concrete.
The prestressing force also reduces the magnitude of principal tensile stress in the web so that thin webbed I sections may be used without the risk of diagonal tension failures and with further savings in self weight.
21
The prestressing force has to be produced by high tensile steel and it is necessary to use high quality concrete to resist the higher compressive stresses that are developed(Mosley and Bungey, 2002).
In the design and construction of the prestressed concrete, there are many sources of uncertainties which are put into consideration during the construction in order for the structure to serve its intended purpose. Consequently, structures must be designed to serve their functions with a finite probability of failure (Nowak and Colins, 2002).
In order to treat these uncertainties in the construction processes of the prestressed concrete, reliability analysis comes into play. Reliability is the probability that the structure will perform its required function without failure under a specified limit state during a specified reference period (Thoft-Christensen and Baker, 1982). The probability of structural failure from all possible causes is inevitable. However, the uncertainties and their significance on the structural safety and performance can be analyzed systematically only through methods of probability.
The development of structural reliability methods during the last three to four decades have provided a more rational basis for the design of structures in the sense that the method facilitate a consistent basis of comparison between
22
the reliability of a well-tested structural design and the reliability of new types of structures. For this reason the methods of structural reliability have been applied increasingly in connection with the development of new design codes (Sorenson et,al., 2002). In recent years design codes have been continuously revised to include limit states based on probabilistic methods. In fact the limit state design approach has been used nearly in all the recent advances in codified design (Ellingwood, 1996). The use of structural reliability methods for design can lead to structures that have a more consistent level of risk (Zimmerman et, al., 1992). Therefore, to account for the system effect in structural assessment and design, the safety importance of structural members must be quantified (Gharaibeh, et, al., 2001)
1.2 PROBLEM STATEMENT AND JUSTIFICATION OF STUDY
The way in which civil engineering systems fail, the occurrence and frequency of failure, its economics and social consequences, demonstrate considerable differences between hypothetical and actual systems. Induced loading, site characterization, material properties, developed formulations and procedures and adequacy of predicted sizes and shapes of the system and its elements are far from certain. All these factors are subject to complex inter relationships, materials defects, structural deficiencies, human errors and hence to varying degrees of randomness. Reliability analysis of structures is required
23
as a result of these problems. Failure of a system is assessed by its inability to perform its intended function adequately on demand for a period of time and under specified condition, while its antithesis, the measure of success, is called reliability (Milton 1987).
1.3 AIM AND OBJECTIVES
1.3.1 Aim
The aim of this research is to carry out a reliability analysisof a prestressed concrete beam using First Order Reliability Method (FORM) and Eurocode 2 (2004) design procedure.
1.3.2 Objectives
The objectives of this research are to:
- identify the various modes of failure due to ultimate limit state of a prestressed concrete beam.
- compute the probabilities of failure associated with the various modes of failure of theprestressed concrete beam.
- determine the implied safety indices related to the probabilities of failure.
- compute the mean safety index for each mode of failure.
- establish a target safety indices associated with the modes of failure of the Prestressed concrete beam.
24
- design a typical Prestressed concrete beam to meet a target safety level.
1.4 SCOPE OF RESEARCH
The scope of this research was limited to the reliability analysis of a simply supported Prestressed concrete beam in accordance with the recommendation of Eurocode 2 (2004).
You either get what you want or your money back. T&C Apply

You can find more project topics easily, just search
-
SIMILAR BUILDING TECHNOLOGY FINAL YEAR PROJECT RESEARCH TOPICS
-
1. APPRAISAL OF BUILDING MAINTENANCE PRACTICE AMONG LANDLORDS IN NIGER CENTRAL SENATORIAL ZONE OF NIGER STATE
» TABLE OF CONTENTS Title page i Declaration ii Approval page iii Dedication iv Acknowledgement v Table of contents vi Abstract viii CHAPTER ONE: INTROD...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
2. ASSESSMENT OF PROFESSIONAL’S PERCEPTION ON MATERIALS MANAGEMENT PRACTICES ON CONSTRUCTION SITES IN SELECTED STATES IN NIGERIA.
» CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Material management can be defined as a process that coordinates planning, assessing the requirem...Continue Reading »Item Type & Format: Project Material - Ms Word | 80 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
3. THE STUDY OF FACTORS AFFECTING WORKERS PRODUCTIVITY IN BUILDING PRODUCTION PROCESS IN IMO STATE
» CHAPTER ONE INTRODUCTION 1.1 Background of the study Productivity at both micro and macro economic level is a serious issue as far as the industrial s...Continue Reading »Item Type & Format: Project Material - Ms Word | 70 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
4. CONFLICT MANAGEMENT IN NIGERIAN CONSTRUCTION INDUSTRY.
» CHAPTER ONEINTRODUCTIONBackground of the studyToday‘s construction projects become more complex in nature. The complex,relational and lengthy proces...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
5. MATERIALS MANAGEMENT STRATEGIES ON PORT-HARCOURT CONSTRUCTION SITES.
» ABSTRACT The current economic crisis has widened the gap between resources requirements to meet planned goals and the projected availability of funds ...Continue Reading »Item Type & Format: Project Material - Ms Word | 73 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
6. WETLAND CONSERVATION AND RESTORATION IN THE CITY OF NIGERIA
» CHAPTER ONE INTRODUCTION 1.0 Background to the Study The world and Africa in particular are facing serious challenges in the area of environmental deg...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
7. DELAY ANALYSIS IN INDUSTRIAL PROJECTS BY USING RELATIVE IMPORTANCE INDEX METHOD.
» TABLE OF CONTENTSApproval pageDedicationAbstractAcknowledgementTable of contentCHAPTER ONEINTRODUCTION1.1 Relevance of project1.2 Site inspection1.3 E...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
8. PROJECT PLANNING AND PROGRAMMING AS TOOLS FOR EFFECTIVE PROJECT DELIVERY
» TABLE OF CONTENTSCover Page Title Page Certification Dedication Acknowledgment Abstract Table of Content Chapter One: Introduction1.1 Background of th...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
9. THE USE OF OIL PALM FIBER AS AN ADDITIVE IN CONCRETE
» ABSTRACT This study on strength development of concrete quality and properties using oil palm fiber was carried out to enhance and improve the quality...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
10. STRUCTURAL DETAILING IN REINFORCED CONCRETE OF A THREE BEDROOM DETACH DUPLEX
» CHAPTER ONE INTRODUCTION The work in the construction industry involves the client, the Architect, the Engineer, the quantity surveyor and the builder...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT