- The Complete Research Material is averagely 52 pages long and it is in Ms Word Format, it has 1-5 Chapters.
- Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
- Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
- Full Access Fee: ₦4,000
Get the complete project »

ABSTRACT
In the sense that the materials involved in this project were capital intensive more especially cement, so in carrying out the work one must have to be careful in the selection and collection of materials to be used in the casting of the concrete.
The materials used are coarse aggregate (granite) fine aggregate (sand). The coarse aggregates used in this work were collected from Ishiagu while the fine aggregate was collected in front of the carpentry’s workshop on the campus. The test conform to the standard method test, the ratio used was 1:2:4 and the method adopted was batching by weight, from the mix ratio the relative weight for each material to be used for concrete cube cast was 36, these cubes were tested for compressive strength of 7, 14 and 28 days. The results of tests involved in the work and that of compressive strength tests were calculated and tabulated as shown in the final tabulation of results.
TABLE OF CONTENTS
CHAPTER ONE
1.1 The project objectives
CHAPTER TWO
2.1 Materials for concrete
2.2 Aggregates introduction
2.2.1 Fine Aggregate/Sand
2.2.2 Coarse Aggregate/Granite
CHAPTER THREE
3.0 Mixing of the concrete
CHAPTER FOUR
4.0 Preparation for placing and compaction
4.1 Curing
4.2 Testing of hardened concrete and tabulation of results
CHAPTER FIVE
5.0 Conclusions and Recommendation
Bibliography.
You either get what you want or your money back. T&C Apply

You can find more project topics easily, just search
-
SIMILAR BUILDING TECHNOLOGY FINAL YEAR PROJECT RESEARCH TOPICS
-
1. THE CHALLENGES OF REDUCING LABOUR COST IN NIGERIA BUILDING INDUSTRY (A case study of osun state)
» ABSTRACT The aim of this research was to identify and rank, according to relative importance, factors affecting high cost of labour in Nigerian buildi...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
2. THE EFFECT OF DELAY AND DISTRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECT
» CHAPTER ONE INTRODUCTION Delay as referred in construction is prolonged construction period and disruptions are events that disturb the construction p...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
3. EVALUATING THE EFFECTIVENESS OF PROJECT DELIVERY METHODS IN SOUTH-EAST NIGERIA
» ABSTRACT This research studied “evaluating the effectiveness of project delivery methods in South East Nigeria”. There are alternatives de...Continue Reading »Item Type & Format: Project Material - Ms Word | 133 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
4. COMPARATIVE STUDY OF STRENGTH OF BAMBOO CANE FIBRE CONCRETE BEAM AND REINFORCED CONCRETE BEAM.
» ABSTRACT Due to increase in cost of steel reinforcement for the construction of structure concrete. It becomes impressive to investigate other types o...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
5. THE EFFECT OF REINFORCED CONCRETE ON SAFETY OF RESIDENTIAL BUILDINGS IN NIGERIA
» CHAPTER ONE INTRODUCTION Residential Building: This is defined as the building which sleeping accommodation is provided for normal residential purpose...Continue Reading »Item Type & Format: Project Material - Ms Word | 102 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
6. REHABILITATION OF WALL SURFACE PAINTING TO BUILDING WORKSHOP OF KADUNA POLYTECHNIC,
» ABSTRACT This project work is based on the rehabilitation paint and decorating of external side wall of the workshop including its toilet, its cleared...Continue Reading »Item Type & Format: Project Material - Ms Word | 36 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
7. PROJECT MANAGEMENT AND MAINTENANCE IN LOCAL GOVERNMENT AREAS
» ABSTRACT The research examined factors of effective maintenance management in the public sector. Data gathering and analysis involved personal intervi...Continue Reading »Item Type & Format: Project Material - Ms Word | 95 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
8. CONSTRUCTION OF EQUIPMENT FOR DEODORIZING KEROSENE
» ABSTRACT The motive of this project is to construct equipment for deodorizing kerosene, hence the smell of kerosene is totally eradicated. The...Continue Reading »Item Type & Format: Project Material - Ms Word | 33 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
9. THE DESIGN AND CONSTRUCTION OF BURGLARY PROOF
» CHAPTER ONE 1.1 INTRODUCTION Protector design is the joining of metals of pipes of the same diameter. Sizes together in a compound pattern in order to...Continue Reading »Item Type & Format: Project Material - Ms Word | 39 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
10. MATERIALS MANAGEMENT STRATEGIES ON PORT-HARCOURT CONSTRUCTION SITES.
» ABSTRACT The current economic crisis has widened the gap between resources requirements to meet planned goals and the projected availability of funds ...Continue Reading »Item Type & Format: Project Material - Ms Word | 73 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT