A Card Based Security System (a Case Study Of Eco Bank)

A Card Based Security System (a Case Study Of Eco Bank)

  • The Complete Research Material is averagely 37 pages long and it is in Ms Word Format, it has 1-5 Chapters.
  • Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
  • Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
  • Full Access Fee: ₦6,000

Get the complete project » Instant Download Active
ABSTRACT
This project was centered on card based security system. The current process of security is being operated manually and due to this procedure numerous problem are been encountered. A design was taken to computerized the manual process in order to check this problem.

The problems were identified after series of interviews and examination of documents after which analysis was made and a computerized procedure recommended. This project will also suggest how to successfully implement the computerized procedure and to overcome the obstacle that would hinder the successful implementation of the system. The new system was designed using Microsoft visual basic 6.0 programming language. This language was chosen because of its easy syntax and features for developing windows based applications.

TABLE OF CONTENT

Title page i
Approval page ii
Dedication iii
Acknowledgement iv
Table of content v
Abstract vi

CHAPTER ONE
1.0 Introduction historical background
1.1 Objective of the study
1.2 Statement of the problem
1.3 Significance of the researchers study
1.4 Scope of study
 1.5 Limitation of study
1.6 Brief history of case study
1.7 Definition of terms


CHAPTER TWO
Review of related literature

CHAPTER THREE
3.0 System investigation analysis and design
3.1 System investigation
3.2 Fact finding
3.3 Analysis of finding
3.3.1 Problem of formal system
3.3.2 Reason for new system
3.4 System specification
3.5 Input and output forms and design

CHAPTER FOUR
4.0 System programming and implementation
4.1 Choice of implementation
4.2 Program flow chart and algorithm
4.3 Source code and debugging
4.4 Testing and documentation
4.5 Staff training
4.6 Hardware and software requirement
4.7 Implementation (handover)

CHAPTER FIVE
Summary, Recommendation and Conclusion
5.1 Summary
5.2 Recommendation
5.3 Conclusion
References
Appendix

You either get what you want or your money back. T&C Apply







You can find more project topics easily, just search

Quick Project Topic Search