CHAPTER ONE
INTRODUCTION
1.1 Relevance of project
1.2 Site inspection
1.3 Evolution of road network in nigeria
1.4 Motor vehicle characteristic that affects road design data
1.5 Drivers and their characteristics
1.6 Reconnaissance survey
1.6.1Chain survey
1.6.2Station marking
1.7 Factors Affecting Choice Of Station
CHAPTER TWO
THEODOLITE TRANSVERSING OF THE ROAD CONTROL
2.1 Definitions
2.2 Thetheodolite
2.3 Theodorite adjustment
2.3.1Temporary adjustment
2.3.2Permanent adjustment
2.4 Procedure for theodolite traversing
2.5Materials used for the theodolte traversinging
CHAPTER THREE
PROJECT FIELD LEVELING WORK
3.1 Leveling
3.2 Profile leveling
3.3 Cross leveling
3.4 Objectives of leveling
3.5 Instruments used in leveling
3.6 Temporary adjustment of leveling instrument
3.7 Definition of some leveling terminologies
3.8 Leveling book
3.9 Earthwork computation
3.9.1Method
CHAPTER FOUR
SOIL ANALYSIS
4.1 Collection and preliminary preparation of samples
4.2 Mechanical analysis
4.3 Atterberg/consistency limit tests
4.3.1Liquid limit test
4.3.2Plastic limit test
4.4 Compaction test
4.5 The California bearing ratio (cbr) test
4.6 Pavement design using cbr
CHAPTER FIVE
GEOMETRIC ELEMENTS DESIGN
5.1 Basic design parameters
5.1.1Design speed
5.1.2Gradient
5.1.3Sight distance
5.2 Curve design
5.3 Curve parameters and formula used, in designing of horizontal curves
5.4 Vertical curve design
5.5 Cross sectional elements of the road
5.6 Brief description on stages of work and equipment used n road constriction
5.7 Summary and conclusion
You either get what you want or your money back. T&C Apply

You can find more project topics easily, just search
-
SIMILAR BUILDING TECHNOLOGY FINAL YEAR PROJECT RESEARCH TOPICS
-
1. AN INVESTIGATION INTO BUILD OPERATE AND TRANSFER IN THE PROVISION OF HOSTELS IN NIGERIAN FEDERAL UNIVERSITIES
» ABSTRACT Inadequate hostel for students in Universities has been of great concern to Government and the University authorities. The Government has bee...Continue Reading »Item Type & Format: Project Material - Ms Word | 129 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
2. INNOVATION PROCESSES AND PRACTICES IN CONSTRUCTION INDUSTRY IN ANAMBRA STATE OF NIGERIA
» ABSTRACT This study “innovation process and practices in construction industry in Anambra State of Nigeria” examined and assessed the leve...Continue Reading »Item Type & Format: Project Material - Ms Word | 97 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
3. APPLICATION OF GEOINFORMATIC TECHNIQUES IN CONTROLLING FLOODING IN VULNERABLE ROADS AND BUILDINGS IN NIGERIA
» CHAPTER ONE INTRODUCTION 1.1 Background to the Study The acronym GIS stands for geographic information system, it is a system which allows a capture, ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
4. IMPACT OF SAND AND GRAVEL DREDGING ON THE ENVIRONMENT: A CASE STUDY OF THE LAGOS BAR BEACH COASTAL AREA
» Abstract For thousands of years, sand and gravel have been used in the construction of roads and buildings. Today, demand for sand and gravel continue...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
5. A QUALITY ANALYSIS OF THE THICKNESS OF PART AND CORRUGATED ASBETES ROOFING SHEETS OF EMENITE LIMITED ENUGU
» ABSTRACT Calcium is the most important mineral in the body. The body needs calcium for normal functioning of nerves and muscles including the most imp...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
6. THE CHALLENGES OF REDUCING LABOUR COST IN NIGERIA BUILDING INDUSTRY (A case study of osun state)
» ABSTRACT The aim of this research was to identify and rank, according to relative importance, factors affecting high cost of labour in Nigerian buildi...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
7. EFFECT OF SALT WATER ON CONCRETE
» CHAPTER ONE INTRODUCTION 1.1 WHAT IS CONCRETE Concrete is an artificial engineering material made from a mixture of Portland cement, water, fine and c...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
8. AN EVALUATION OF FACTORS AFFECTING MATERIALS MANAGEMENT IN CONSTRUCTION SITE, A CASE STUDY OF IMO STATE
» CHAPTER ONE INTRODUCTION 1.1 Background of the Study Material management can be defined as a process that coordinates planning, assessing the requirem...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
9. ACCESSMENT OF THE COMPRESSIVE STRENGTH OF SANDCRETE HOLLOW BLOCKS MOULDED FROM FOUR (4) DIFFERENT BLOCK INDUSTRIES IN IGABI, CHIKUMAND KADUNA SOUTH LO...
» CHAPTER ONE 1.0 Introduction Sandcrete blocks are composit4e material made up of cement, sand and water moulded into different sizes (Barry 1969). It ...Continue Reading »Item Type & Format: Project Material - Ms Word | 51 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
10. ROAD DETERIORATION
» CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF STUDY The importance of highways for the prosperity of any country cannot be over emphasized. The developme...Continue Reading »Item Type & Format: Project Material - Ms Word | 59 pages |