- The Complete Research Material is averagely 52 pages long and it is in Ms Word Format, it has 1-5 Chapters.
- Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
- Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
- Full Access Fee: ₦4,000
Get the complete project »

CHAPTER ONE
INTRODUCTION
1.1. Background of the study
Traffic congestion in commercial cities in Nigeria has been a cause for concern for every well-meaning Nigerian who craves for infrastructural development and maintenance. The continuous road traffic congestion in Nigerian cities especially in Lagos which started from the 1980s immediately after Udeoji award which enhanced household income and resulted to increased desire for both private and commercial vehicle ownership is intensifying on daily basis. The daily movement of people in Nigerian cities is becoming more difficult and complex.
Lagos state being the most populated state in Nigeria according to the national population commission has been engulfed in traffic congestion this may be due to population explosion and urban migration which has increased the pressure on the available infrastructure. This is reflected in the increasing bumper-to-bumper traffic being experienced in the major cities during the morning (7:00am – 9:00am) and afternoon (3:00pm – 6:00pm) peak hours (Okpala, 1981:46). In some cases, such as in Lagos, road traffic congestion is being experienced throughout the day from 8:00am – 9:00pm which can even extend into the dead of the night on occasions. In Lagos state especially, it is not uncommon for commuters to spend more than two hours enroute to work, school, market, hospital etc. or back home even when to and fro distance is not much. According to Okpala (1998: 23), the situation has become so common that it even appears that traffic hold-ups are becoming acceptable excuses for late attendance to work or even formal and informal meetings. This malady in most of the Nigerian cities has been causing people a lot of concern (Oyefesobi, 1981:35). It is posing formidable challenges to both state governments, Local government Councils, researchers and particularly the city residents.
1.2. Statement of the general problem
The search for an enduring solution to the traffic problems will necessarily commence with thorough investigation that will unveil the factors responsible for such problems. This is what this study intends to do with particular reference to Oshodi-Apapa express way Lagos.
1.3. Objectives of the study
This study aims at the following:
Ø To provide this missing link by way of making good attempt at identifying the factors which are responsible for traffic problems in Oshodiapapa express way.
Ø To recommend ways of easing traffic congestion in Lagos
Ø To examine the major causes of road traffic congestion in Lagos
1.4. Scope of the study
This study is on statistical analysis of road traffic congestion at the OshodiApapa express way Lagos state.
1.5. Research questions
Ø What are the major causes of traffic congestion
Ø What can be done to ease traffic congestion in Lagos?
Ø Is there a relationship between traffic congestion and increase in crime rate in Lagos?
1.6. Research hypothesis
H0: There is no significant relationship between crime and traffic congestion in Oshodiapapa expressway
H1: There is a significant relationship between crime and traffic congestion in Oshodiapapa expressway
1.7. Definition of terms
Ø Trafficthe movement of vehicles, ships, persons, etc., in an area, along astreet, through an air lane, over a water route, etc
Ø Crime:an illegal act for which someone can be punished by the government
You either get what you want or your money back. T&C Apply

You can find more project topics easily, just search
-
SIMILAR ENVIRONMENTAL SCIENCE FINAL YEAR PROJECT RESEARCH TOPICS
-
1. EFEECT OF HEAVY RAINFALL ON FARMLANDS IN NIGERIA(CASE STUDY OF ITU LOCAL GOVERNMENT AREA
» CHAPTER ONE INTRODUCTION Heavy rainfall are purely environmental hazards of meteorological phenomena, but very often induced by man’s improper u...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | ENVIRONMENTAL SCIENCE DEPARTMENT
-
2. WASTE MANAGEMENT IN SABON TASHA MARKET, CHIKUN LOCAL GOVERNMENT AREA, KADUNA STATE
» CHAPTER ONE INTRODUCTION 1.1 Background of The Study Sabon Tasha is located in Chikun Local Government Area. It lies along Kaduna Kachia express way. ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | ENVIRONMENTAL SCIENCE DEPARTMENT
-
3. AIR POLLUTION CONTROL WITHIN AN INDUSTRIAL ENVIRONMENT (A CASE STUDY OF PORT HARCOURT REFINERY RIVERS STATE)
» CHAPTER ONE INTRODUCTION Background to study The Niger Delta regions of Nigeria have in recent years become a hot bed of explosive crisis and conflict...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | ENVIRONMENTAL SCIENCE DEPARTMENT
-
4. THE IMPACT OF AIR POLLUTION ON LAND UTILIZATION IN LAGOS STATE
» INTRODUCTION The word pollution has been used in many contexts with different connotative meaning. However, pollution can be seen as the contaminating...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | ENVIRONMENTAL SCIENCE DEPARTMENT
-
5. EVALUATING THE PROBLEMS OF SOLID WASTE MANAGEMENT IN NIGERIA
» CHAPTER ONE INTRODUCTION 1.1 BACKGROUND TO THE STUDY Solid wastes comprise all the wastes arisingfrom human and animal activities that arenormally sol...Continue Reading »Item Type & Format: Project Material - Ms Word | 55 pages |
Instant Download | Chapter 1-5 | ENVIRONMENTAL SCIENCE DEPARTMENT
-
6. MARINE POLLUTION IN SUB SAHARAN AFRICA: ANALYSIS OF THE IMPACTS TO SHIPPING OPERATIONS AND MARINE ENVIRONMENT
» TABLE OF CONTENT Title page Certification i Dedication ii Acknowledgement iii Abstract iv Chapter One: 1.0 Introduction 1 1.1 Background Information 1...Continue Reading »Item Type & Format: Project Material - Ms Word | 70 pages |
Instant Download | Chapter 1-5 | ENVIRONMENTAL SCIENCE DEPARTMENT
-
7. ENVIRONMENTAL IMPACT OF LEACHATE POLLUTION OF GROUND WATER SUPPLIES
» CHAPTER ONE 1.1 GENERAL BACKGROUND Groundwater pollution is mainly due to the process of industrialization and urbanization that has progressively dev...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | ENVIRONMENTAL SCIENCE DEPARTMENT
-
8. RURAL INFRASTRUCTURE DEVELOPMENT AS A SOLUTION TO RURAL-URBAN MIGRATION
» CHAPTER ONE INTRODUCTION 1.1 Background of the study The Man is a social being who cannot stay in a place according to William’s theory on clash of ...Continue Reading »Item Type & Format: Project Material - Ms Word | 58 pages |
Instant Download | Chapter 1-5 | ENVIRONMENTAL SCIENCE DEPARTMENT
-
9. ASSESSMENT OF THE PROBLEMS IN THE MANAGEMENT OF URBAN HOUSING
» CHAPTER ONE INTRODUCTION 1.1 BACKGROUND TO THE STUDY Over the last four decades, the world has experienced a phenomenal growth in the rate of urbaniza...Continue Reading »Item Type & Format: Project Material - Ms Word | 26 pages |
Instant Download | Chapter 1-5 | ENVIRONMENTAL SCIENCE DEPARTMENT
-
10. THE IMPACT OF MATERIAL SOURCING IN ENHANCING THE ORGANIZATIONAL PROFITABILITY
» CHAPTER TWO LITERATURE REVIEW 2.0 Introduction This chapter will attempts to some comments and opinions of the various authors as contained in the boo...Continue Reading »Item Type & Format: Project Material - Ms Word | 50 pages |
Instant Download | Chapter 1-5 | ENVIRONMENTAL SCIENCE DEPARTMENT