- The Complete Research Material is averagely 52 pages long and it is in Ms Word Format, it has 1-5 Chapters.
- Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
- Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
- Full Access Fee: ₦4,000
Get the complete project »

TABLE OF CONTENTS
INDEX TITLE PAGE
Cover Page - - - - i
Title Page - - - - ii
Declaration - - - - iii
Certification - - - - iv
Dedication - - - - v
Acknowledgement - - - - vi
Table of Contents - - - - vii
Lists of Tables - - - - ix
Abstract - - - - ix
CHAPTER ONE: INTRODUCTION
1.1 Background of the Study - - - 1
1.2 Statement of Research Problem - - 3
1.3 Aims and Objectives - - - 4
1.4 Research Questions - - - 4
1.5 Hypothesis of the Study - - - 5
1.6 Significance of Study - - - 6
1.7 Scope of the Study - - - 6
1.8 Structure/Plan of the study - - - - - - 6
CHAPTER TWO: LITERATURE REVIEW
2.1 Basic Concepts - - - 8
2.1.1 Construction Project Characteristics - - - - 8
2.1.2 Contract Sum - - - - - - - - 10
2.1.3 Final Account Sum - - - - - - - 11
2.1.4 Cost Budgeting - - - - - - - 11
2.2 Conceptual Framework of the Study - - - - - 11
2.3 Determination of contract sum - - - - - 12
2.3.1 Cost Estimating - - - - - - - 13
2.3.2 Tendering and Contractor’s Selection - - - - 13
2.3.3 Contract Administration - - - - - - - 16
2.4 Causes of Variability between Contract (Causes of Cost Overrun) - 16
2.6 Project Characteristics Influencing Project Delivery - - - 22
CHAPTER THREE: RESEARCH METHODOLOGY
3.0 Preamble - - - 23
3.1 Research Design - - - 23
3.2 Area of Study - - - 23
3.3 Population - - - 24
3.4 Sampling size and sampling technique - - 24
3.5 Data Collection Method - - - 25
3.6 Method of Data Analysis - - - 27
CHAPTER FOUR: DATA PRESENTATION, ANALYSIS AND DISCUSSION
4.1 Preamble - - - 27
4.2 Distribution of Questionnaires and Interview Responses - 27
4.3 Respondents Profile - - - 27
4.4 Project and Firms Characteristics - - - 29
4.5 Causes of Cost Differential between Contract Sum and Final Account 29
4.6 Impact of Project Characteristics on Cost Differentials - - 32
4.7 Hypothesis Testing - - - - 33
4.8 Comparison of Impact of Project Characteristics on Cost Differential - 35
4.9 Discussion of Results - - - - - - - 36
CHAPTER FIVE: SUMMARY, CONCLUSION AND RECOMMENDATION
5.1 Preamble - - - 38
5.2 Summary of Findings - - - 38
5.3 Conclusion - - - 39
5.4 Recommendation - - - 40
References
LIST OF TABLES
Table 4.1: Questionnaire Administration - - - - - - 27
Table 4.2: Respondents Characteristics - - - - - - 28
Table 4.3: Project and Firms’ Characteristics - - - - - 29
Table 4.4: Causes of Cost Differential between Contract Sum and Final Account 31
Table 4.5: Project Characteristics Influencing Cost Differentials - - 32
Table 4.6: Impact of Projects Characteristics on Cost Differential - - 33
Table 4.7: Comparison of Mean Rating in Three States - - - - 35
Table 4.8: Analysis of Variance Test - - - - - - 36
You either get what you want or your money back. T&C Apply

You can find more project topics easily, just search
-
SIMILAR QUANTITY SURVEYING FINAL YEAR PROJECT RESEARCH TOPICS
-
1. MODELLING OF COST OVERRUNS IN BUILDING PROJECTS IN ABUJA
» ABSTRACT Construction of building projects is an endeavour that involves capital expenditure, which is either borrowed or self financed by clients. Th...Continue Reading »Item Type & Format: Project Material - Ms Word | 83 pages |
Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
2. EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR FLOOR SCREED AND TILE FINISHES FOR CONSTRUCTION WORK IN ABUJA
» ABSTRACT There is dearth of information on output level of building operatives in Nigeria, consequently, the output constants currently used for prepa...Continue Reading »Item Type & Format: Project Material - Ms Word | 112 pages |
Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
3. VARIATIONS IN RAINFALL AND TEMPERATURE AS AFFECTING MICROBIAL POPULATION UNDER THREE CROPPING SYSTEMS
» ABSTRACT This study was carried out in Uyo, Akwa Ibom state between January and April 2017, in order to assess the effect of variations in rainfall an...Continue Reading »Item Type & Format: Project Material - Ms Word | 40 pages |
Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
4. LAND USE APPRAISAL IN OSUN STATE [A CASE STUDY OF OSUN STATE POLYTECHNIC IREE]
» ABSTRACT Cement is the third most energy –intensive material to produce, behind steel and aluminum. The production of every tonne of Portland ce...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
5. INVESTIGATION OF THE EFFECT OF DESIGN ERROR ON THE FINAL COST OF A PROJECT
» CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY When asked to define "design error," not all disciplines in the construction process agree on a c...Continue Reading »Item Type & Format: Project Material - Ms Word | 110 pages |
Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
6. ASSESSING THE CAPABILITIES OF CONTRACTORS IN MONITORING AND CONTROLLING CONSTRUCTION CASH FLOW IN NIGERIA.
» ABSTRACT The construction sector experiences the highest number of bankruptcies compared to any sector of the economy, with many companies failing bec...Continue Reading »Item Type & Format: Project Material - Ms Word | 111 pages |
Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
7. RELIABILITY OF ESTIMATES PREPARED BY QUANTITY SURVEYORS FOR BUILDING WORKS IN AKWA IBOM STATE
» CHAPTER ONE 1.1 Background of the Study In nearly all contract types, the preparation of a realistic cost estimates is a necessary part of any buildin...Continue Reading »Item Type & Format: Project Material - Ms Word | 99 pages |
Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
8. PERFORMANCE EVALUATION OF PRIMARY HEALTH CARE (PHC) BUILDINGS IN THE FEDERAL CAPITAL TERRITORY (FCT).
» ABSTRACT Existing studies have established that the physical characteristics of buildings have significant influence on occupants’ satisfaction....Continue Reading »Item Type & Format: Project Material - Ms Word | 126 pages |
Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
9. ASSESSMENT OF KNOWLEDGE MANAGEMENT CAPABILITIES OF THE NIGERIAN QUANTITY SURVEYING FIRMS
» ABSTRACT Knowledge Management (KM) capabilities provide the supportive structure required to share knowledge within the context in which it is require...Continue Reading »Item Type & Format: Project Material - Ms Word | 180 pages |
Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
10. ASSESSMENT OF INFORMATION TECHNOLOGY (IT) USES AT PRE-CONTRACT STAGE OF BUILDING PROJECTS IN AKWA IBOM STATE
» CHAPTER ONE INTRODUCTION 1.1 Background to the study Every construction process requires heavy exchange of data and information between project partic...Continue Reading »Item Type & Format: Project Material - Ms Word | 60 pages |
Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT