- The Complete Research Material is averagely 64 pages long and it is in Ms Word Format, it has 1-5 Chapters.
- Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
- Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
- Full Access Fee: ₦6,000
Get the complete project »
TABLE OF CONTENTS
INDEX TITLE PAGE
Cover Page - - - - i
Title Page - - - - ii
Declaration - - - - iii
Certification - - - - iv
Approval Page - - - - v
Dedication - - - - vi
Acknowledgement - - - - vii
Table of Contents - - - - viii
Lists of Tables - - - - xi
Abstract - - - - xii
CHAPTER ONE: INTRODUCTION
1.1 Background of the Study - - - 1-4
1.2 Statement of Research Problem - - 3-4
1.3 Aims and Objectives - - - 4-5
1.4 Research Questions - - - 5
1.5 Hypothesis of the Study - - - 5
1.6 Significance of Study - - - 5-6
1.7 Scope of the Study - - - 6
CHAPTER TWO: LITERATURE REVIEW
2.1 Preamble - - - 7
CHAPTER THREE: RESEARCH METHODOLOGY
3.0 Preamble - - -
3.1 Research Design - - -
3.2 Area of Study - - -
3.3 Population - - -
3.4 Sampling size and sampling technique - -
3.5 Data Collection Method - - -
3.5.1 Sources of Data - - -
3.5.2 Validity of the Instrument - - -
3.6 Method of Data Analysis - - -
CHAPTER FOUR: DATA PRESENTATION, ANALYSIS AND DISCUSSION
4.1 Preamble - - -
4.2 Questionnaire Administration - - -
4.3 Respondents Profile - - -
4.4 Project Characteristics - - -
4.5 Level of Quantity Surveyors Awareness in Sustainable
Infrastructural Development - - -
4.6 Level of Quantity Surveyors involvement in Sustainable
Infrastructural Development - - -
4.7 Challenges of factors inhibiting Quantity Surveyors
involvement in sustainable infrastructural development -
4.8 Test of Hypothesis - - -
4.9 Discussions of findings - - -
CHAPTER FIVE: SUMMARY, CONCLUSION AND RECOMMENDATION
5.1 Preamble - - -
5.2 Summary of Findings - - -
5.2.1 The Level of Quantity Surveyors Awareness in
Sustainable Infrastructural Development. - -
5.2.2 The level of Quantity Surveyors involvement in
Sustainable Infrastructural Development. - -
5.2.3 Challenges or factors inhibiting Quantity Surveyors
involvement in Sustainable Infrastructural Development. -
5.3 Conclusion - - -
5.4 Recommendation - - -
References - - -
LIST OF TABLES
TABLES TITLE PAGE
Table 4.1 Questionnaire Administration
Table 4.2 Respondents Characteristics
Table 4.3 Project Characteristics and Sustainable Infrastructural
Development Practices
Table 4.4 Level of Quantity Surveyors Awareness in Sustainable
Infrastructural Development
Table 4.5 Level of Quantity Surveyors involvement in Sustainable
Infrastructural Development
Table 4.6 Challenges of factors inhibiting Quantity Surveyors
involvement in sustainable infrastructural development
ABSTRACT
The world over, a vast number of developing countries are trying to achieve sustainable economic growth in every sector and more equitable distribution of the benefits of growth. The United Nations millennium development goals have identified key areas for development which also embrace environmental development. It forms part of its developmental areas aimed at enabling everyone access to good life without neglecting the privileges of the future. As we are facing climate change worldwide, sustainable or “green” building and holistic sustainable construction has been widely discussed on how to implement it on to the development for future buildings. This study evaluated the roles of Quantity Surveyors (QS) in sustainable infrastructures development in Nigeria. The study adopted survey research design using structured questionnaire survey administered to 50 quantity surveyors in Akwa Ibom State, Nigeria. Data analyses involved. The study concluded that Quantity Surveyors have vital roles in integrating sustainability to building and other construction project during design and construction process to deliver successful sustainable infrastructures. This implies that QS can facilitate the changes required for sustainable infrastructures due to their specific requirement.
You either get what you want or your money back. T&C Apply
You can find more project topics easily, just search
-
SIMILAR QUANTITY SURVEYING FINAL YEAR PROJECT RESEARCH TOPICS
-
1. ASSESSMENT OF COST OVER-RUN FACTORS IN PUBLIC BUILDING PROJECTS IN AKWA IBOM STATE
» ABSTRACT Cost deviations between initial cost plan and final construction cost of building projects are on construction issues in the construction ind...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
2. INVESTIGATION OF THE EFFECT OF DESIGN ERROR ON THE FINAL COST OF A PROJECT
» CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY When asked to define "design error," not all disciplines in the construction process agree on a c...Continue Reading »Item Type & Format: Project Material - Ms Word | 110 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
3. An investigation into design error and it impact on initial cost of construction project
» CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY When asked to define "design error," not all disciplines in the construction process agree on a c...Continue Reading »Item Type & Format: Project Material - Ms Word | 110 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
4. INFLUENCE OF ESTIMATING PRACTICE ON COST PERFORMANCE OF BUILDING PROJECTS IN AKWA IBOM STATE
» ABSTRACT This study determined the influence of estimating practice on cost performance of building projects. The objectives were to identify the esti...Continue Reading »Item Type & Format: Project Material - Ms Word | 71 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
5. distance and price of selected building materials
» ABSTRACT Over the years, there has been an increasing cost of building projects. This work aims at examining the extent of the trend of increase and d...Continue Reading »Item Type & Format: Project Material - Ms Word | 62 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
6. THE IMPACT OF PROJECT CHARACTERISTICS ON THE DIFFERENCE BETWEEN CONTRACT SUM AND FINAL ACCOUNT IN NIGERIA
» TABLE OF CONTENTS INDEX TITLE PAGE Cover Page i Title Page ii Declaration iii Certification iv Dedication v Acknowledgement vi Table of Contents vii L...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
7. ASSESSMENT OF PROJECT PLANNING PRACTICES AND ITS IMPACT ON CONTRACTORS PROFITABILITY
» TABLE OF CONTENTS Index Title Page Title page…………………………………………………………..i Declaration……………………...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
8. IMPACT OF INCENTIVE SCHEMES ON PRODUCTIVITY OF CONSTRUCTION WORKERS IN CROSS RIVER STATE, NIGERIA
» CHAPTER ONE INTRODUCTION 1.1 Background of the study Construction performance and productivity improvement are the focus areas in construction industr...Continue Reading »Item Type & Format: Project Material - Ms Word | 59 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
9. ASSESSMENT OF BARRIERS TO COMMUNICATION IN THE NIGERIAN CONSTRUCTION INDUSTRY
» ABSTRACT All the various stages of construction rely on professionals transferring appropriate and relevant information to develop a buildable design ...Continue Reading »Item Type & Format: Project Material - Ms Word | 94 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
10. MODELLING OF COST OVERRUNS IN BUILDING PROJECTS IN ABUJA
» ABSTRACT Construction of building projects is an endeavour that involves capital expenditure, which is either borrowed or self financed by clients. Th...Continue Reading »Item Type & Format: Project Material - Ms Word | 83 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT