ABSTRACT
Construction industry is considered as one of the most important industries in Nigeria. Most construction projects in Nigeria and other developing countries are characterized by overrun in time (delay) in their completion due to various reasons in the world and Akwa Ibom state is no exception. Delay has always contributed high expenses to all parties. Once a project is delayed, it has a negative impact on the concerned parties. These phenomena affect the progress of construction industry and may expose many institutions of construction to be destroyed. The aim of this research is to assess delay and its impact on construction project delivery with a view to mitigating its impact on construction projects. The objective of this study is to investigate the causes of delay in construction projects. It evaluates the impact of delay on construction projects and proffers ways to minimize and avoid its impact in any construction project. A structured questionnaire in Likert scale was used for data collection. The result showed that law and regulatory framework, delay in progress payment by the client, financial difficulties of the client, mistakes and errors in design, poor site management and supervision are major causes of delay. The effect of delay include cost overrun, delayed profit by the client, idling resources, and other factors e.g. arbitration, litigation, disputes, claims, lawsuits, poor professional relationship, damage of reputation and in most cases total project abandonment. Based on the findings, it concluded that construction delay affects construction project performance by inducing overrun in time and cost notably. Based on this conclusion also, the study recommended that all stakeholders in the construction industry have to work together to minimize and mitigate delay and improve on timely delivery of construction projects and to sustain healthy growth of the industry.
TABLE OF CONTENTS
Title page i
Declaration ii
Certification iii
Approval Page iv
Dedication v
Acknowledgments vi
Abstract vii
Table of Contents viii
CHAPTER ONE
1.0 INTRODUCTION 1
1.1 Background of the Study 1
1.2 Statement of the Problem 3
1.3 Aim and Objectives of the Study 5
1.4 Research Questions 5
1.5 Research Hypotheses 5
1.6 Significance of the Study 6
1.7 Scope and Delimitation of the Study 6
1.8 Definitions of Terms 7
CHAPTER TWO: LITERATURE REVIEW
2.0 Introduction 9
2.1 Construction Industry 9
2.2 Construction Projects 11
2.3 Concept of Delay in Construction Project Delivery 18
2.4 Types of Delays 20
2.4.1 Excusable Delay 21
2.4.2 Critical & Non-Critical Delays 23
2.4.3 Non-Compensable Delay 25
2.4.4 Excusable with Compensation (Client Cost) 26
2.4.5Non-Compensable Delay 27
2.5 Non Excusable Delays 28
2.5.1. Non - Excusable/Non - Compensable Delays 29
2.6 Concurrent Delays 30
2.7 Identifying Factors Causing Delay 31
2.7.1 Shortage of Materials 32
2.7.2 Cash Flow and Financial Difficulties 33
2.7.3 Lack of Experience 34
2.7.4 Poor Site Management and Supervision 34
2.7.5 Inadequate Planning and Scheduling 34
2.7.6Mistakes and Error in Design 35
2.7.7 Frequent Design Changes 35
2.7.8Effect of Weather 35
2.7.9 Insufficient Number of Equipment 36
2.7.10 Owner Interference 37
2.7.11 Accident on Site 37
2.7.12Delay in Decision Making 38
2.7.13Lack of Communication between Parties 39
2.7.14Change in Scope of the Project 39
2.7.15 Delay in Progress Payment by Owner 40
2.8 Impact of Delay 41
2.8.1 Common Impact of Delay 48
2.8.2 Effects of Delay in Project Execution 50
2.9 Methods of Minimizing and Management of Delay 51
2.10 Summary 54
CHAPTER THREE: RESEARCH METHODOLOGY
3.1 Introduction 55
3.2 Research Design 55
3.3 Area of the Study 56
3.4 Population of the Study 56
3.5 Sampling Technique 56
3.6 Data Collection Instrument 57
3.6.1 Observation 57
3.6.2 Interview 58
3.6.3 Questionnaire 58
3.7 Method of Data Analysis 59
CHAPTER FOUR: DATA PRESENTATION, ANALYSIS AND INTERPRETATION
4.1 Introduction &
You either get what you want or your money back. T&C Apply
You can find more project topics easily, just search
-
SIMILAR QUANTITY SURVEYING FINAL YEAR PROJECT RESEARCH TOPICS
-
1. PROJECT FINANCING IN AKWA IBOM STATE: CHALLENGES AND THE WAY FORWARD
» CHAPTER ONE INTRODUCTION 1.1 Background of the Study The construction industry is an established industry: the sector regarded as a catalyst for growt...Continue Reading »Item Type & Format: Project Material - Ms Word | 76 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
2. ANALYSIS OF EFFICIENCY OF AIR PASSENGER SUPPORT SERVICES A CASE STUDY OF MURTALA MOHAMMED INTERNATIONAL AIRPORT
» CHAPTER ONE INTRODUCTION 1.1 Background Of The Study Passengers leaving on a trip normally want to spend as little time as possible in the terminal. T...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
3. THE COSTS OF INFORMATION TECHNOLOGY IMPLEMENTATION IN QUANTITY SURVEYING FIRMS
» TABLE OF CONTENTS Title page i Dedication ii Declaration iii Certification iv Acknowledgements v Table of contents vi List of Tables xii Abstract xiii...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
4. ASSESSMENT OF THE SURVIVAL PRACTICES OF QUANTITY SURVEYING FIRMS IN A RECESSED ECONOMY
» CHAPTER ONE INTRODUCTION 1.1 Background to the study The construction industry plays an important role in a nation’s economy and its activities are ...Continue Reading »Item Type & Format: Project Material - Ms Word | 81 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
5. EFFECTS OF SAFETY CULTURE ON CONSTRUCTION SAFETY PERFORMANCE IN AKWA IBOM STATE
» TABLE OF CONTENTS Title Page i Certification ii Approval page iii Dedication iv Acknowledgement v Table of Contents vi List of Tables vi List of Figur...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
6. ASSESSMENT OF MATERIALS MANAGEMENT STRATEGIES ON CONSTRUCTION SITES IN UYOMUNICIPAL
» TABLE OF CONTENTS INDEX TITLE PAGES Title Page ii Declaration iii Certification iv Dedication v Acknowledgement vi vii Table of Content Viii –Xi Lis...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
7. ASSESSMENT OF THE INFLUENCE OF UNETHICAL PRACTICES ON BUILDING PROJECT COST PERFORMANCE
» TABLE OF CONTENTS Title Pages Cover page i Title Page ii Certification iii Dedication iv Acknowledgements v Table of Contents vi Abstract x CHAPTER ON...Continue Reading »Item Type & Format: Project Material - Ms Word | 63 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
8. THE EFFECT OF MOTIVATION OF LABOUR, COST AND PRODUCTIVITY ON NIGERIAN CONSTRUCTION INDUSTRY
» CHAPTER ONE 1.1 BACKGROUND TO THE STUDY Human resource management is of strategic importance when it comes to industries that are labour intensive lik...Continue Reading »Item Type & Format: Project Material - Ms Word | 74 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
9. EFFECTS OF PRELIMINARY ESTIMATE ON FINAL ACCOUNT OF BUILDING PROJECTS IN AKWA IBOM STATE
» CHAPTER ONE INTRODUCTION 1.1 Background of the Study Ever since the dawn of civilization, man has indulged in some form of construction activity. Even...Continue Reading »Item Type & Format: Project Material - Ms Word | 57 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
10. PERFORMANCE EVALUATION OF PRIMARY HEALTH CARE (PHC) BUILDINGS IN THE FEDERAL CAPITAL TERRITORY (FCT).
» ABSTRACT Existing studies have established that the physical characteristics of buildings have significant influence on occupants’ satisfaction....Continue Reading »Item Type & Format: Project Material - Ms Word | 126 pages | Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT