- The Complete Research Material is averagely 70 pages long and it is in Ms Word Format, it has 1-5 Chapters.
- Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
- Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
- Full Access Fee: ₦4,000
Get the complete project »

TABLE OF CONTENTS
Index Title Page
Cover Page - - - - - - - - - i
Abstract - - - - - - - - - ii Declaration - - - - - - - - - iii
Certification - - - - - - - - - iv
Dedication - - - - - - - - - v
Acknowledgement - - - - - - - - vi
List of Tables - - - - - - - - vii
List of Figures - - - - - - - viii
List of Contents - - - - - - -ix-xii
Chapter One: Introduction - - - - - 1-5
1.1 Background to the Study - - - - - -1
1.2 Aim and Objectives of the Study - - - - 3
1.3 Significance of the Study/Contribution to Knowledge - 3
1.4 Statement of Research Questions - - - - 4
1.5 Scope of the Study - - - - - - 5
1.6 Organisation of the Work - - - - - -5
Chapter Two: Literature Review - - - -6-22
2.0 Introduction - - - - - - -6
2.1 Stakeholder Theory - - - - - - 6
2.1.1 Stakeholders Defined - - - - - - 6
2.2 Classification of Stakeholders - - - - - 8
2.3 The Community Stakeholder Groups - - - - 10
2.5 Stakeholders Engagement - - - - - 12
2.6 Project Cost and Costs in Stakeholders Engagement - 15
2.6.1 Stakeholder’s Engagement Cost: Project Overhead or
Corporate Social Responsibility? - - - -18
2.6.1.1 Corporate Social Responsibility (CSR) - - - 18
2.6.1.2 The Contrast - - - - - - - 18
2.7 Summary - - - - - - 20
Chapter Three: Research Methodology - - - 23-30
3.0 Introduction - - - - - - - 23
3.1 Research Design - - - - - - 24
3.2 Area of Study - - - - - - - 24
3.3 Population of Study - - - - - - 25
3.4 Sampling and Sampling Technique - - - - 25
3.4.1 Sample size - - - - - - - 26
3.5 Data collection - - - - - - 26
3.5.1 Focus Group - - - - - - - 26
3.5.2 Interview - - - - - - - 27
3.5.3 Questionnaire Survey - - - - - - 27
3.6 Data Analysis - - - - - - - 29
3.6.1 Stakeholders Salience - - - - - - 29 Chapter Four: Data Analysis, Result and Discussions - 31-47
4.1.1 Response Rate - - - - - - - 31
4.1.2 Respondents Characteristics - - - - - 32
4.2 Expenditure Items in Stakeholders Engagement Cost - 35
4.3 Cost of Stakeholders’ Engagement - - - - 39
4.4 Community Stakeholders - - - 41
4.7 Discussion of Findings - - - - - - 43
4.6.1 Community Stakeholders - - - - - 43
4.6.2 Cost Expenditure Items and Cost of Stakeholders Engagement 46
Chapter Five: Summary of Findings, Conclusion
and Recommendations - - - - 50-54
5.0 Introduction - - - - - - - 50
5.1 Statement of Research Problem and Approach - - - 50
5.2 Summary of Findings - - - - - - - 50
5.2.1 Key Community Stakeholders in Akwa Ibom State - - - 50
5.2.2 Impact of Transactional Contracts on Stakeholders’ Management - 51
5.2.3 Expenditure Items and Cost of Stakeholders’ Engagement - - 52
5.3 Conclusion - - - - - - - - 53
5.4 Recommendations - - - - - - - 53
5.5 Limitation - - - - - - - - 54
5.6 Area for Future Research - - - - - - 54
You either get what you want or your money back. T&C Apply

You can find more project topics easily, just search
-
SIMILAR QUANTITY SURVEYING FINAL YEAR PROJECT RESEARCH TOPICS
-
1. AN EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR WALL TILES (A CASE STUDY OF KADUNA STATE AND ABUJA)
» ABSTRACT Productivity is one of the important elements in construction planning and scheduling. However, construction industries in Nigeria are curren...Continue Reading »Item Type & Format: Project Material - Ms Word | 101 pages |
Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
2. AN APPRAISAL OF THE READINESS OF NIGERIAN BUILDING CONSULTING FIRMS TO ADOPT LEAN CONSTRUCTION PRINCIPLES
» ABSTRACT Studies have shown that construction projects are susceptible to problems such as low productivity, poor safety, inferior working conditions,...Continue Reading »Item Type & Format: Project Material - Ms Word | 79 pages |
Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
3. ASSESSMENT OF MATERIALS MANAGEMENT STRATEGIES ON CONSTRUCTION SITES IN UYOMUNICIPAL
» TABLE OF CONTENTS INDEX TITLE PAGES Title Page ii Declaration iii Certification iv Dedication v Acknowledgement vi vii Table of Content Viii –Xi Lis...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
4. IMPACT OF PROJECT GOVERNANCE STRUCTURE ON THE PERFORMANCE OF PUBLIC BUILDINGS IN IMO STATE
» CHAPTER ONE INTRODUCTION 1.1 Background to the Study Project governance is the management framework within which project decisions are made. Project g...Continue Reading »Item Type & Format: Project Material - Ms Word | 68 pages |
Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
5. ASSESSMENT OF BARRIERS TO COMMUNICATION IN THE NIGERIAN CONSTRUCTION INDUSTRY
» ABSTRACT All the various stages of construction rely on professionals transferring appropriate and relevant information to develop a buildable design ...Continue Reading »Item Type & Format: Project Material - Ms Word | 94 pages |
Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
6. EFFECTS OF SAFETY CULTURE ON CONSTRUCTION SAFETY PERFORMANCE IN AKWA IBOM STATE
» TABLE OF CONTENTS Title Page i Certification ii Approval page iii Dedication iv Acknowledgement v Table of Contents vi List of Tables vi List of Figur...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
7. ASSESSMENT OF PROJECT PLANNING PRACTICES AND ITS IMPACT ON CONTRACTORS PROFITABILITY
» TABLE OF CONTENTS Index Title Page Title page…………………………………………………………..i Declaration……………………...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
8. ASSESSMENT OF THE INFLUENCE OF UNETHICAL PRACTICES ON BUILDING PROJECT COST PERFORMANCE
» TABLE OF CONTENTS Title Pages Cover page i Title Page ii Certification iii Dedication iv Acknowledgements v Table of Contents vi Abstract x CHAPTER ON...Continue Reading »Item Type & Format: Project Material - Ms Word | 63 pages |
Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
9. THE EFFECT OF CONTRACT PLANNING ON CONSTRUCTION PROJECT PERFORMANCE
» TABLE OF CONTENTS Title page i Certification ii Dedication iii Acknowledgement iv Table of content v x Abstract xi CHAPTER ONE (Introduction) 1.1 back...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT
-
10. distance and price of selected building materials
» ABSTRACT Over the years, there has been an increasing cost of building projects. This work aims at examining the extent of the trend of increase and d...Continue Reading »Item Type & Format: Project Material - Ms Word | 62 pages |
Instant Download | Chapter 1-5 | QUANTITY SURVEYING DEPARTMENT