ENERGY AUDIT, OPTIMISATION AND MANAGEMENT OF LIQUEFIED NATURAL GAS PLANTS WITH RENEWABLE ENERGY RESOURCES AROUND THE PLANT: A CASE STUDY OF BRASS LNG, BRASS ISLAND, NIGERIA

ENERGY AUDIT, OPTIMISATION AND MANAGEMENT OF LIQUEFIED NATURAL GAS PLANTS WITH RENEWABLE ENERGY RESOURCES AROUND THE PLANT: A CASE STUDY OF BRASS LNG, BRASS ISLAND, NIGERIA

  • The Complete Research Material is averagely 50 pages long and it is in Ms Word Format, it has 1-5 Chapters.
  • Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
  • Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
  • Full Access Fee: ₦5,000

Get the complete project » Delivery Within 34-48hrs

The energy generation and power consuming loads at Brass LNG facility located in Brass Island, Bayelsa State Nigeria were analyzed and compared with expected demand changes and means of minimizing cost and greenhouse gas emission were also proffered with wind and solar energy penetration into the overall power mix . The wind and solar hybrid power generation system reduced the fuel consumption, greenhouse gas emission and noise pollution by the generators and turbine by relieving some of the power plants or reducing their sizes. Economic cost benefit analysis and recovery periods projections made showed that system is economically viable and technically feasible with low recovery time.


You either get what you want or your money back. T&C Apply







You can find more project topics easily, just search

Quick Project Topic Search