- The Complete Research Material is averagely 26 pages long and it is in Ms Word Format, it has 1-5 Chapters.
- Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
- Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
- Full Access Fee: ₦6,000
Get the complete project »
ABSTRACT
The study is about developing benchmark/ paradigm for total Quality Management in Building Maintenance Operations. Building defects is usually outcome of failure or shortcomings recorded at early stage of project which could be design oriented and sometimes wrong approach, this need to be corrected and as well maintained, the study thus present paradigm/benchmark through which quality of maintenance operations being carried out on such,could be improved.
The methodology involved primarily opinion survey, measured against benchmarked Total quality management principles, the data were collected with the aid of a structured questionnaire, designed in Likert scale 1 to 5. The secondary data were collected through review of pastworks, Journal articles and Textbooks. Random sampling method was used for population sampling, the result generated were analysed using mean item score, frequency count and Ranking
The study concluded with recommending eighteen benchmarked quality points which when observed could lead to productivity enhancement, accident reduction, waste elimination, quality job output and host of other positive outcomes.
Keywords: Quality, Maintenance, Benchmark ,Management, Paradigm,Operation
INTRODUCTION
BACKGROUND OF THE STUDY
By the nature of creation there is virtually nothing man-made that is indestructible, but the usefulness of many such items can be extended by carrying out repair at regular intervals through an activity known as maintenance. White (1979) defined maintenance as the “work undertaken to restore every facility to an acceptable standard at an acceptable cost. The use and exposure to environmental conditions subjects machines, buildings and other service facilities to deterioration. The process of deterioration if unchecked, culminate in rendering these facilities unserviceable and brings them to a standstill. Firms and organization, therefore have no choice but to attend to them from time to time, to repair and recondition them so as to prolong their usefulness to the extent that they are economically and physically priviledged.
Maintenance is made responsible, for provision of a condition, of machines, buildings, and services that will permit uninterrupted implementation of plans requiring their use. Theoretically, maintenance should aim at keeping the machines and other facilities in a condition that allows them to be used without any interruption and at their maximum profit making capacity. (Adegoke, 2003).However, as adequate care is being taken to ensure the reconditioning of the machine and building facilities back to their original state, a level at which it will be able to perform the intended use, however cognizance should be taken of the fact that, if it has to be done; it should be at minimum cost, with improved output, emphasis placed on employee involvement and empowerment, continuous improvement, cutting across the entire organisation, and with every responsibility for quality of work output. (Iyagba, 2005 and Wahab, 1987).
Quality, as a measure of excellence is subjective, that is, it depends on the perspective at which individual views it. It could be explained as the totality of features and characteristics of a product or service that bears on its stated ability or implied needs and to be generally acceptable. (Lam 2000).
The acceptability of a product or a service will depend on its ability to function satisfactorily over a period of time, and it is this aspect of performance which is given the name reliability or quality assurance.Quality assurance has the aim of getting things right first time, and to provide platform upon which consistent improvement could be based. It is broadly termed as the prevention of problems undermining quality through planned and systematic activities. These include the establishment of a good quality management system and the assessment of its adequacy, the auditing of the operation of the system, and the review of the system itself.Therefore, from the standpoint of quality assurance, every step taken in the reconditioning of a system back to its best state is important, ensuring that the right thing is being done promptly and at a reasonable cost, without unnecessary waste of effort and resources.
According to Olawunmi (1992), consequence of neglecting the aspect of management of quality in the maintenance of facilities, machines, and buildings, has resulted in the following: i. Increase in maintenance cost and low building performance. ii. Wasted energy and effort iii. Inadequate client’s management of maintenance. e.g. - Lack of communication regarding maintenance issue - Inadequate resources allowed for adequate maintenance. - Capital cost overriding life-cycle-cost. iv. Very complex service system with low reliability. v. Lack of sufficient instrumentation for easy monitoring
However the above stated facts could be corrected by applying the tools/principles of Total Quality Management. Since the principle of Total Quality Management profers solution out of the such problems since it forms the nucleus of what the principle address.
STATEMENT OF THE PROBLEM
A careful look at Nigerian environment would reveal erratic building maintenance pattern among buildings owners/occupiers, especially, most of the public buildings are left unattended to the major preoccupation then seemed to be, construction of big edifice without considering subsequent maintenance of such a property. Thus maintenance of building in Nigeria tends to be a sort of onerous task, and it is also saddle with a lot of problems which tends to hampers it and makes it a sort of herculean task. Some of such problems being encountered in building maintenance in Nigeria and which needs to be attended to are as follows:
i. Inappropriate maintenance policy ii. Non-compliance with statutory requirements iii. Inability of management of organization to carry employee along in decision-making and policy formulation. iv. Insufficient training and skilled manpower in maintenance operations v. Lack of standards performance monitoring system.
The above listed problem could be countered by considering certain virtues in total quality management, which tend to provide way out of the problems. It is believed that if the principle could be applied in building maintenance most or nearly all the problem arising therein would be solved. To this end therefore, this research work is about studying an approach through which TQM principles could be adopted for an effective maintenance operation.
AIMS AND OBJECTIVES OF THE STUDY
Aim
The Aim of the study is to proffer ways of improving building maintenance practice via the application of Total Quality management Principles
OBJECTIVES
(a) To find out the best approach to ensure quality in building maintenance operations.
(b) To recommend action points/benchmarks in the application of Total Quality management principles in building maintenance practice.
(c) To investigate the method employed in Building maintenance to ensure the quality of finished work
SIGNIFICANCE OF THE STUDY
Besides adding to the existing body of knowledge ion this area, the study is significant in the sense that, it with demystify the existing doubts as to the practicality of Total Quality management principles in solving problems as regards building maintenance, problems such as: inadequate training of personnel insufficient resources, measurement and precision in work carried out, communication between authority and employee. This study would then enable those principles in application in building maintenance as well the to ones that are not yet in application, to be determined. This would help in how to proffer solution to other problems that would surface in building maintenance operations and how to tackle them.
You either get what you want or your money back. T&C Apply
You can find more project topics easily, just search
-
SIMILAR BUSINESS ADMINISTRATION FINAL YEAR PROJECT RESEARCH TOPICS
-
1. BUDGETARY AND MANAGEMENT CONTROL PROCESS IN NIGERIAN BREWERIES KADUNA
» CHAPTER ONE 1.1 INTRODUCTION BACKGROUND OF THE STUDY Traditional budgeting has been criticized for a long time now for its inadequacy as a means of ma...Continue Reading »Item Type & Format: Project Material - Ms Word | 58 pages | Instant Download | Chapter 1-5 | BUSINESS ADMINISTRATION DEPARTMENT
-
2. THE IMPACT OF HUMAN RESOURCE PLANNING ON ORGANIZATIONAL PRODUCTIVITY (A CASE STUDY OF SSABML NIGERIA LIMITED)
» ABSTRACT This research is designed to cover Human Resources Planning in relation to organizational performance. As a Human Resource Manager, Human Res...Continue Reading »Item Type & Format: Project Material - Ms Word | 70 pages | Instant Download | Chapter 1-5 | BUSINESS ADMINISTRATION DEPARTMENT
-
3. THE EFFECT OF JOB SATISFACTION ON EMPLOYEES’ PRODUCTIVITY (A CASE STUDY OF UNION BANK NIGERIA PLC, AKPAKPAVA BRANCH)
» CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Job dissatisfaction among workers has been a bone of contention and most researched variable amon...Continue Reading »Item Type & Format: Project Material - Ms Word | 47 pages | Instant Download | Chapter 1-5 | BUSINESS ADMINISTRATION DEPARTMENT
-
4. AN EVALUATION OF CAPITAL STRUCTURE AND PROFITABILITY OF BUSINESS ORGANISATION (A CASE STUDY OF SELECTED QUOTED COMPANIES)
» ABSTRACT Capital structure is the proportion or each type of capital debt and equity used by a business organisation. Many organizations employ debt i...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUSINESS ADMINISTRATION DEPARTMENT
-
5. CONTRIBUTIONS OF CONFIDENTIAL SECRETARIES TOWARDS ORGANIZATIONS DEVELOPMENT
» CHAPTER ONE INTRODUCTION 1.1 Background of the study The fortunes of an organization inevitably determine the position of secretaries to build a natio...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUSINESS ADMINISTRATION DEPARTMENT
-
6. THE EFFECT OF TRAINING AND DEVELOPMENT ON EMPLOYEES PERFORMANCE; AT SAFARICOM LIMITED CALL CENTRE
» CHAPTER ONE: INTRODUCTION 1:1 Background of the Study Human capital can be regarded as the prime asset of an organization and businesses need to inves...Continue Reading »Item Type & Format: Project Material - Ms Word | 65 pages | Instant Download | Chapter 1-5 | BUSINESS ADMINISTRATION DEPARTMENT
-
7. WORKING CAPITAL MANAGEMENT PRACTICES OF SMALL AND MEDIUM ENTERPRISES IN NIGERIA: A SURVEY OF SELECTED SMES IN THE UYO LOCAL GOVERNMENT AREA
» CHAPTER ONE GENERAL INTRODUCTION 1.0 BACKGROUND OF THE STUDY There exist lots and lots of business ventures that are run by individuals, group of peop...Continue Reading »Item Type & Format: Project Material - Ms Word | 78 pages | Instant Download | Chapter 1-5 | BUSINESS ADMINISTRATION DEPARTMENT
-
8. THE ROLE OF COMMUNICATION IN AN ORGANISATION (A CASE STUDY OF COCA-COLA NIGERIA COMPANY, UGHELLI)
» CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF STUDY Research has shown a continue interest in the study of organizational goal attainment especially when...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUSINESS ADMINISTRATION DEPARTMENT
-
9. THE IMPACT OF TOTAL QUALITY MANAGEMENT ON THE PERFORMANCE OF THE BANKING INDUSTRY OF NIGERIA ( A CASE STUDY OF FIRST BANK)
» ABSTRACT The study examined the impact of TQM on the performance of First Bank, using Uyo branch as a case study. The primary and secondary sources of...Continue Reading »Item Type & Format: Project Material - Ms Word | 76 pages | Instant Download | Chapter 1-5 | BUSINESS ADMINISTRATION DEPARTMENT
-
10. TOPIC: CONSTANT INCREASE IN PETROLEUM PRODUCTS: ITS IMPLICATION FOR NIGERIAN ECONOMY.
» CHAPTER ONE INTRODUCTION Energy crises, with their attendant social and economic cum political consequences are not new phenomena on the International...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUSINESS ADMINISTRATION DEPARTMENT