- The Complete Research Material is averagely 52 pages long and it is in Ms Word Format, it has 1-5 Chapters.
- Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
- Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
- Full Access Fee: ₦6,000
Get the complete project »
CHAPTER ONE
INTRODUCTION
1.1 Relevance of project
1.2 Site inspection
1.3 Evolution of road network in nigeria
1.4 Motor vehicle characteristic that affects road design data
1.5 Drivers and their characteristics
1.6 Reconnaissance survey
1.6.1Chain survey
1.6.2Station marking
1.7 Factors Affecting Choice Of Station
CHAPTER TWO
THEODOLITE TRANSVERSING OF THE ROAD CONTROL
2.1 Definitions
2.2 Thetheodolite
2.3 Theodorite adjustment
2.3.1Temporary adjustment
2.3.2Permanent adjustment
2.4 Procedure for theodolite traversing
2.5Materials used for the theodolte traversinging
CHAPTER THREE
PROJECT FIELD LEVELING WORK
3.1 Leveling
3.2 Profile leveling
3.3 Cross leveling
3.4 Objectives of leveling
3.5 Instruments used in leveling
3.6 Temporary adjustment of leveling instrument
3.7 Definition of some leveling terminologies
3.8 Leveling book
3.9 Earthwork computation
3.9.1Method
CHAPTER FOUR
SOIL ANALYSIS
4.1 Collection and preliminary preparation of samples
4.2 Mechanical analysis
4.3 Atterberg/consistency limit tests
4.3.1Liquid limit test
4.3.2Plastic limit test
4.4 Compaction test
4.5 The California bearing ratio (cbr) test
4.6 Pavement design using cbr
CHAPTER FIVE
GEOMETRIC ELEMENTS DESIGN
5.1 Basic design parameters
5.1.1Design speed
5.1.2Gradient
5.1.3Sight distance
5.2 Curve design
5.3 Curve parameters and formula used, in designing of horizontal curves
5.4 Vertical curve design
5.5 Cross sectional elements of the road
5.6 Brief description on stages of work and equipment used n road constriction
5.7 Summary and conclusion
You either get what you want or your money back. T&C Apply
You can find more project topics easily, just search
-
SIMILAR BUILDING TECHNOLOGY FINAL YEAR PROJECT RESEARCH TOPICS
-
1. COMPARATIVE STUDY OF STRENGTH OF BAMBOO CANE FIBRE CONCRETE BEAM AND REINFORCED CONCRETE BEAM.
» ABSTRACT Due to increase in cost of steel reinforcement for the construction of structure concrete. It becomes impressive to investigate other types o...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
2. COMPARING THE COMPRESSIVE AND FLEXURAL STRENGTH OF CONCRETE MADE WITH RIVER SAND AND QUARRY DUST AS FINE AGGREGATE
» ABSTRACT Nowadays development of infrastructures is becoming number one priority in the world, particularly in the developing countries. So there are ...Continue Reading »Item Type & Format: Project Material - Ms Word | 80 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
3. REHABILITATION OF WALL SURFACE PAINTING TO BUILDING WORKSHOP OF KADUNA POLYTECHNIC,
» ABSTRACT This project work is based on the rehabilitation paint and decorating of external side wall of the workshop including its toilet, its cleared...Continue Reading »Item Type & Format: Project Material - Ms Word | 36 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
4. THE USE OF OIL PALM FIBER AS AN ADDITIVE IN CONCRETE
» ABSTRACT This study on strength development of concrete quality and properties using oil palm fiber was carried out to enhance and improve the quality...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
5. STRATEGIES FOR CONTROLLING CRACKS IN RESIDENTIAL BUILDINGS IN NIGER SOUTH SENATORIAL DISTRICT
» Table of contents Title page i Declaration ii Approval page iii Dedication iv Acknowledgements v Table of contents vi Abstract ix CHAPTER ONE: INTRODU...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
6. AN EVALUATION OF FACTORS AFFECTING MATERIALS MANAGEMENT IN CONSTRUCTION SITE, A CASE STUDY OF IMO STATE
» CHAPTER ONE INTRODUCTION 1.1 Background of the Study Material management can be defined as a process that coordinates planning, assessing the requirem...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
7. NAILS USED IN THE CONSTRUCTION OF AN OFFICE ROOF CONSTRUCTION BY BUILDING TECHNOLOGY STUDENTS
» CHAPTER ONE 1.0 INTRODUCTION 1.1 BACKGROUND OF STUDY Nailing can be said to be the most basic and most commonly used means of attaching members in woo...Continue Reading »Item Type & Format: Project Material - Ms Word | 51 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
8. MANAGEMENT OF MATERIALS IN BUILDING
» ABSTRACT The control of materials on construction sites is handled carelessly by planning and purchasing departments, site supervisors and engineers a...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
9. AN ANALYSIS OF DETERMINANTS OF ACCIDENT INVOLVING MARINE VESSELS IN NIGERIA’S WATERWAYS
» Cases of marine vessel accident involving personal injury, deaths, property and environmental damage have grown in tandem with increased oil prospecti...Continue Reading »Item Type & Format: Project Material - Ms Word | 50 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
10. THE EFFECT OF DELAY AND DISTRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECT
» CHAPTER ONE INTRODUCTION Delay as referred in construction is prolonged construction period and disruptions are events that disturb the construction p...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT