- The Complete Research Material is averagely 52 pages long and it is in Ms Word Format, it has 1-5 Chapters.
- Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
- Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
- Full Access Fee: ₦6,000
Get the complete project »
TABLE OF CONTENTS
Approval page
Dedication
Abstract
Acknowledgement
Table of content
CHAPTER ONE
INTRODUCTION
1.1 Relevance of project
1.2 Site inspection
1.3 Evolution of road network in nigeria
1.4 Motor vehicle characteristic that affects road design data
1.5 Drivers and their characteristics
1.6 Reconnaissance survey
1.6.1Chain survey
1.6.2Station marking
1.7 Factors Affecting Choice Of Station
CHAPTER TWO
THEODOLITE TRANSVERSING OF THE ROAD CONTROL
2.1 Definitions
2.2 Thetheodolite
2.3 Theodorite adjustment
2.3.1Temporary adjustment
2.3.2Permanent adjustment
2.4 Procedure for theodolite traversing
2.5Materials used for the theodolte traversinging
CHAPTER THREE
PROJECT FIELD LEVELING WORK
3.1 Leveling
3.2 Profile leveling
3.3 Cross leveling
3.4 Objectives of leveling
3.5 Instruments used in leveling
3.6 Temporary adjustment of leveling instrument
3.7 Definition of some leveling terminologies
3.8 Leveling book
3.9 Earthwork computation
3.9.1Method
CHAPTER FOUR
SOIL ANALYSIS
4.1 Collection and preliminary preparation of samples
4.2 Mechanical analysis
4.3 Atterberg/consistency limit tests
4.3.1Liquid limit test
4.3.2Plastic limit test
4.4 Compaction test
4.5 The California bearing ratio (cbr) test
4.6 Pavement design using cbr
CHAPTER FIVE
GEOMETRIC ELEMENTS DESIGN
5.1 Basic design parameters
5.1.1Design speed
5.1.2Gradient
5.1.3Sight distance
5.2 Curve design
5.3 Curve parameters and formula used, in designing of horizontal curves
5.4 Vertical curve design
5.5 Cross sectional elements of the road
5.6 Brief description on stages of work and equipment used n road constriction
5.7 Summary and conclusion
You either get what you want or your money back. T&C Apply
You can find more project topics easily, just search
-
SIMILAR BUILDING TECHNOLOGY FINAL YEAR PROJECT RESEARCH TOPICS
-
1. MAINTENANCE AND SERVICING PROBLEMS OF SPECIALIST WORKS IN BUILDING
» Abstract The study considered the maintenance and servicing problems of specialist works in buildings. It shall identify the cause of damages to these...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
2. PROJECT PLANNING AND PROGRAMMING AS TOOLS FOR EFFECTIVE PROJECT DELIVERY
» TABLE OF CONTENTSCover Page Title Page Certification Dedication Acknowledgment Abstract Table of Content Chapter One: Introduction1.1 Background of th...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
3. AN INVESTIGATION INTO BUILD OPERATE AND TRANSFER IN THE PROVISION OF HOSTELS IN NIGERIAN FEDERAL UNIVERSITIES
» ABSTRACT Inadequate hostel for students in Universities has been of great concern to Government and the University authorities. The Government has bee...Continue Reading »Item Type & Format: Project Material - Ms Word | 129 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
4. MODELLING THE EFFECTS OF HIGHWAY GEOMETRIC ELEMENTS ON HIGHWAY ACCIDENT
» CHAPTER ONE INTRODUCTION Background Traffic accidents have been recognized as one of the major causes for human and economic losses both in developed ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
5. AN ASSESSMENT OF CROSS VENTILATION IN PUBLIC BUILDINGS
» ABSTRACT The main purpose of this study is to assess the cross ventilation in public buildings like; Churches, Mosques, Schools and so on, and the nee...Continue Reading »Item Type & Format: Project Material - Ms Word | 60 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
6. THE EFFECT OF DELAY AND DISTRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECT
» CHAPTER ONE INTRODUCTION Delay as referred in construction is prolonged construction period and disruptions are events that disturb the construction p...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
7. ASSESSMENT OF THE EFFECTS OF DAMPNESS ON BUILDINGS IN ATIA IBIAKU SETTLEMENT IN ITU LOCAL GOVERNMENT, AKWA IBOM STATE
» ABSTRACT The work was carried out with the aim of investigating dampness in the buildings within Atia Ibiaku Settlement of Itu Local Government Area, ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
8. THE INFLUENCE OF PUBLIC PROCUREMENT SYSTEM ON CONTRACT PERFORMANCE OF PUBLIC BUILDING PROJECTS DURING IMPLEMENTATION
» ABSTRACT Public procurement system account for significant percentage of GDP and has a directimpact on Kenya economy. Indeed, the Nigerian government ...Continue Reading »Item Type & Format: Project Material - Ms Word | 105 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
9. REHABILITATION OF WALL SURFACE PAINTING TO BUILDING WORKSHOP OF KADUNA POLYTECHNIC,
» ABSTRACT This project work is based on the rehabilitation paint and decorating of external side wall of the workshop including its toilet, its cleared...Continue Reading »Item Type & Format: Project Material - Ms Word | 36 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
10. EFFECT OF PARTIAL REPLACEMENT OF SAND WITH LATERITIC SOIL IN SANDCRETE BLOCKS
» ABSTRACT Of recent, the attention of most researchers is shifting towards the optimization of building materials by using local contents; the use of i...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT