- The Complete Research Material is averagely 52 pages long and it is in Ms Word Format, it has 1-5 Chapters.
- Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
- Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
- Full Access Fee: ₦6,000
Get the complete project »
CHAPTER ONE:1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms
CHAPTER TWO:2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal control 2.3 Classes of internal control 2.4 Limitations of internal control 2.5 Evaluations of internal control 2.6 Internal control and the auditor 2.7 Public accountability 2.8 Historical overview of the case study 2.9 Internal control and accountability
CHAPTER THREE:3.0 RESEARCH METHODOLOGY 3.1 Research design 3.2 Sources of data 3.3 Area of study 3.4 Population of the study 3.5 Determination of sample size 3.6 Reliability of the instrument 3.7 Validity of the instrument 3.8 Method of data analysis
CHAPTER FOUR:4.0 PRESENTATION OF DATA 4.1 Presentation of data 4.2 Test of hypotheses
CHAPTER FIVE:5.0 SUMMARY OF FINDINGS, CONCLUSIONS AND RECOMMENDATIONS 5.1 Summary of findings 5.2 Conclusions 5.3 Recommendations
You either get what you want or your money back. T&C Apply
You can find more project topics easily, just search
-
SIMILAR BUILDING TECHNOLOGY FINAL YEAR PROJECT RESEARCH TOPICS
-
1. AN INVESTIGATION INTO BUILD OPERATE AND TRANSFER IN THE PROVISION OF HOSTELS IN NIGERIAN FEDERAL UNIVERSITIES
» ABSTRACT Inadequate hostel for students in Universities has been of great concern to Government and the University authorities. The Government has bee...Continue Reading »Item Type & Format: Project Material - Ms Word | 129 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
2. ASSESSMENT OF FACTORS INFLUENCING CONTRACTORS BIDDING SUCCESS FOR CONTRUCTION PROJECT IN LAGOS
» CHAPTER ONE1.0 INTRODUCTION1.1 BACKGROUND OF STUDYConstruction activities is older than every activities and development in Nigeria and the rest of th...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
3. EVALUATION OF INCENTIVE SCHEMES ON LABOUR PRODUCTION IN NIGERIA CONSTRUCTION INDUSTRY.
» CHAPTER ONEINTRODUCTION1.1 Relevance of project1.2 Site inspection1.3 Evolution of road network in nigeria1.4 Motor vehicle characteristic that affect...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
4. THE EFFECT OF DELAY AND DISTRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECT
» CHAPTER ONE INTRODUCTION Delay as referred in construction is prolonged construction period and disruptions are events that disturb the construction p...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
5. THE STUDY OF FACTORS AFFECTING WORKERS PRODUCTIVITY IN BUILDING PRODUCTION PROCESS IN IMO STATE
» CHAPTER ONE INTRODUCTION 1.1 Background of the study Productivity at both micro and macro economic level is a serious issue as far as the industrial s...Continue Reading »Item Type & Format: Project Material - Ms Word | 70 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
6. THE USE OF OIL PALM FIBER AS AN ADDITIVE IN CONCRETE
» ABSTRACT This study on strength development of concrete quality and properties using oil palm fiber was carried out to enhance and improve the quality...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
7. AN APPRAISAL OF THE IMPACT OF DELAY IN PROJECT DELIVERY IN CONSTRUCTION INDUSTRY
» CHAPTER ONE INTRODUCTION 1.1 Background of the study It is believed that one of the prevailing problems of construction industry in Nigeria is the imp...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
8. AN EVALUATION OF HOUSING AFFORDABILITY FOR NIGER STATE CIVIL SERVANTS UNDER PUBLIC-PRIVATE PARTNERSHIP (PPP) HOUSING DEVELOPMENT
» ABSTRACT Niger state government achievement in Public housing delivery for its citizen since its creation in 1976 has been very minimal–with jus...Continue Reading »Item Type & Format: Project Material - Ms Word | 102 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
9. INNOVATION PROCESSES AND PRACTICES IN CONSTRUCTION INDUSTRY IN ANAMBRA STATE OF NIGERIA
» ABSTRACT This study “innovation process and practices in construction industry in Anambra State of Nigeria” examined and assessed the leve...Continue Reading »Item Type & Format: Project Material - Ms Word | 97 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
10. ASSESSMENT OF FACTORS AFFECTING COST PERFORMANCE IN CONSTRUCTION PROJECT IN NIGERIA
» CHAPTER ONE INTRODUCTION 1.0 Background of the study The growing need for construction of all types coupled with a tight monetary supply has provided ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT