- The Complete Research Material is averagely 52 pages long and it is in Ms Word Format, it has 1-5 Chapters.
- Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
- Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
- Full Access Fee: ₦6,000
Get the complete project »
ABLE OF CONTENTS
Approval page
Dedication
Abstract
Acknowledgement
Table of content
CHAPTER ONE
INTRODUCTION
1.1 Relevance of project
1.2 Site inspection
1.3 Evolution of road network in nigeria
1.4 Motor vehicle characteristic that affects road design data
1.5 Drivers and their characteristics
1.6 Reconnaissance survey
1.6.1Chain survey
1.6.2Station marking
1.7 Factors Affecting Choice Of Station
CHAPTER TWO
THEODOLITE TRANSVERSING OF THE ROAD CONTROL
2.1 Definitions
2.2 Thetheodolite
2.3 Theodorite adjustment
2.3.1Temporary adjustment
2.3.2Permanent adjustment
2.4 Procedure for theodolite traversing
2.5Materials used for the theodolte traversinging
CHAPTER THREE
PROJECT FIELD LEVELING WORK
3.1 Leveling
3.2 Profile leveling
3.3 Cross leveling
3.4 Objectives of leveling
3.5 Instruments used in leveling
3.6 Temporary adjustment of leveling instrument
3.7 Definition of some leveling terminologies
3.8 Leveling book
3.9 Earthwork computation
3.9.1Method
CHAPTER FOUR
SOIL ANALYSIS
4.1 Collection and preliminary preparation of samples
4.2 Mechanical analysis
4.3 Atterberg/consistency limit tests
4.3.1Liquid limit test
4.3.2Plastic limit test
4.4 Compaction test
4.5 The California bearing ratio (cbr) test
4.6 Pavement design using cbr
CHAPTER FIVE
GEOMETRIC ELEMENTS DESIGN
5.1 Basic design parameters
5.1.1Design speed
5.1.2Gradient
5.1.3Sight distance
5.2 Curve design
5.3 Curve parameters and formula used, in designing of horizontal curves
5.4 Vertical curve design
5.5 Cross sectional elements of the road
5.6 Brief description on stages of work and equipment used n road constriction
5.7 Summary and conclusion
You either get what you want or your money back. T&C Apply
You can find more project topics easily, just search
-
SIMILAR BUILDING TECHNOLOGY FINAL YEAR PROJECT RESEARCH TOPICS
-
1. DELAY ANALYSIS IN INDUSTRIAL PROJECTS BY USING RELATIVE IMPORTANCE INDEX METHOD.
» TABLE OF CONTENTSApproval pageDedicationAbstractAcknowledgementTable of contentCHAPTER ONEINTRODUCTION1.1 Relevance of project1.2 Site inspection1.3 E...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
2. MOTIVATIONAL NEEDS OF BUILDING TECHNOLOGY TEACHERS IN TECHNICAL COLLEGES IN NIGER STATE
» ABSTACT This study examines the performance of Commercial Banks institutions in Kaduna State, based on the development of small and medium Scale indus...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
3. IMPORTANCE OF INCENTIVES IN ENHANCING WORKERS PERFORMANCE IN CONSTRUCTION INDUSTRY
» ABSTRACT This study was based on the importance of incentives in enhancing workers performance on sites, that is, both financial and non financial inc...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
4. NAILS USED IN THE CONSTRUCTION OF AN OFFICE ROOF CONSTRUCTION BY BUILDING TECHNOLOGY STUDENTS
» CHAPTER ONE 1.0 INTRODUCTION 1.1 BACKGROUND OF STUDY Nailing can be said to be the most basic and most commonly used means of attaching members in woo...Continue Reading »Item Type & Format: Project Material - Ms Word | 51 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
5. LATE AND NON PAYMENT ISSUES IN THE NIGERIAN CONSTRUCTION INDUSTRY-CONTRACTORS’ PERSPECTIVE IN ENUGU STATE
» ABTRACT The construction industry plays an important role in Nigerian soci economics development. It is both growth imitating, and growth dependent. T...Continue Reading »Item Type & Format: Project Material - Ms Word | 88 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
6. AN APPRAISAL OF THE IMPACT OF DELAY IN PROJECT DELIVERY IN CONSTRUCTION INDUSTRY
» CHAPTER ONE INTRODUCTION 1.1 Background of the study It is believed that one of the prevailing problems of construction industry in Nigeria is the imp...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
7. ENVIRONMENTAL FACTORS INFLUENCING CONSTRUCTION TIME AND COST OVERRUNS ON HIGH-RISE PROJECT IN NIGERIA
» CHAPTER ONE INTRODUCTION 1.0 Background of the study The expanding need for building of all kinds, coupled with a tight financial supply has offer the...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
8. ASSESSMENT OF FACTORS INFLUENCING CONTRACTORS BIDDING SUCCESS FOR CONTRUCTION PROJECT IN LAGOS
» CHAPTER ONE1.0 INTRODUCTION1.1 BACKGROUND OF STUDYConstruction activities is older than every activities and development in Nigeria and the rest of th...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
9. AN ASSESSMENT OF CAUSES, EFFECT AND REPAIR OF CRACKS IN BUILDING CONSTRUCTION PROJECT IN IMO STATE
» CHAPTER ONE INTRODUCTION 1.1 Background of Study Buildings are structures, which serve as shelters for man, his properties and activities. They must b...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
10. ASSESSMENT OF FACTORS AFFECTING COST PERFORMANCE IN CONSTRUCTION PROJECT IN NIGERIA
» CHAPTER ONE INTRODUCTION 1.0 Background of the study The growing need for construction of all types coupled with a tight monetary supply has provided ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT