CHAPTER ONE
INTRODUCTION
1.0 Background of the study
The expanding need for building of all kinds, coupled with a tight financial supply has offer the construction industry with a large challenge to cut cost.
According to Mendelson and Greenfield (1996) the remaining part of the twentieth century would involve corporations, institutions and government in a race to survive. The attendant dwindling economic fortune of countries economies around the globe have geared up the respondent in these sectors (the client in particular) to take up the problem of ensuring efficient use of their resources to obtain value for money in terms of performance.
The total cost of construction in normal circumstances is expected to be the sum of the following cost: Materials, Labour, Site Overheads, Equipment/Plant, Head office Cost and Profit but in many parts of the world particularly in Nigeria, there are other costs to be allowed for. These costs according to Mbachu and Nkado (2004) have obvious negative effect for the key business stakeholders in particular, and the industry as a whole. To the client, high cost implies added costs over and above those initially agreed upon at the onset, resulting in less returns on investment. To the end user, the added costs are passed on as higher rental / lease costs or prices. To the consultants, it means inability to deliver value - for - money and could tarnish their reputation and result in loss of confidence reposed in them by clients. To the contractor, it implies loss of profit through penalties for non-completion, and negative word of mouth that could jeopardize his/her chances of winning further jobs, if at fault. The proposed work will investigate and report the other costs to be allowed for, which are the basic factors affecting construction cost in Nigeria and also proffer solutions to how construction cost can be minimized.
1.1 Statement of the Problem
The demand for more construction of all types, coupled with a tight monetary supply has provided the construction industry with a big challenge to cut costs. The problem of high contract costs of all aspects of construction is becoming obvious. Consequently, substantial increases are being observed in projects.
This substantial increase has brought about loss of client confidence in consultants, added investment risks, inability to deliver value to clients, and disinvestment in the construction industry.
1.2 Aim and Objectives of the study
The aim of the study is to find out the factors affecting construction cost in Nigeria and proffer solutions to how construction cost c an be minimized. The objectives of the study are as follows:
1. To identify the main factors affecting construction cost in Nigeria.
2. To determine the severity rank of the factors amongst clients, consultants and contractors.
3. To determine the agreement ranking factors between clients, consultants and contractors.
4. To proffer solutions on how to minimize construction cost in Nigeria.
4
1.3 Research Hypotheses
To test the hypothesis:
1 (a). Ho: Contractors and Clients do not generally agree on the severity rank of the
factors affecting construction cost in Nigeria
1 (b). H1: Contractors and Clients generally agree on the severity rank of the factors
affecting construction cost in Nigeria
2 (a). Ho: Clients and Consultants do not generally agree on the severity rank of the
factors affecting construction cost in Nigeria
2. (b) H1: Clients and Consultants do not generally agree on the severity rank of the
factors affecting construction cost in Nigeria
3. (a) Ho: Consultants and Contractors do not generally agree on the severity rank of the factors affecting construction cost in Nigeria
3. (b) H1: Consultants and Contractors generally agree on the severity rank of the factors affecting construction cost in Nigeria
1.4 Significance of the study
An assessment of the study would enable Clients, Contractors and Consultants give an economic approach to construction work such that they would be able to identify the dominating factors leading to high construction cost in Nigeria.
The application of the solutions proffered to minimizing construction cost would restore client’s confidence in consultants, reduce investment risks, and generally boost the viability and sustainability of the industry
5
1.5 Scope and Delimitations
The scope of this research is limited to identification of essential factors affecting construction cost and proffering solutions on how to reduce construction cost in Nigeria. The study is limited to projects in the Lagos metropolis of Nigeria because there is easy access of information in the Lagos metropolis by the researcher.
Target respondents for this study are the principal actors in the construction industry namely: the Client, the Consultant and the Contractor.
You either get what you want or your money back. T&C Apply

You can find more project topics easily, just search
-
SIMILAR BUILDING TECHNOLOGY FINAL YEAR PROJECT RESEARCH TOPICS
-
1. SAFETY PROCEDURES AND ACCIDENT PREVENTION METHODS IN CONSTRUCTION SITES
» CHAPTER ONE INTRODUCTION 1.1 Background of the study The importance of the Construction Industry to national economies the world over cannot be over e...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
2. MANAGEMENT OF MATERIALS IN BUILDING
» ABSTRACT The control of materials on construction sites is handled carelessly by planning and purchasing departments, site supervisors and engineers a...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
3. EVALUATING THE EFFECTIVENESS OF PROJECT DELIVERY METHODS IN SOUTH-EAST NIGERIA
» ABSTRACT This research studied “evaluating the effectiveness of project delivery methods in South East Nigeria”. There are alternatives de...Continue Reading »Item Type & Format: Project Material - Ms Word | 133 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
4. ASSESSMENT OF PROFESSIONAL’S PERCEPTION ON MATERIALS MANAGEMENT PRACTICES ON CONSTRUCTION SITES IN SELECTED STATES IN NIGERIA.
» CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Material management can be defined as a process that coordinates planning, assessing the requirem...Continue Reading »Item Type & Format: Project Material - Ms Word | 80 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
5. ANALYSIS OF FACTORS INFLUENCING MATERIAL WASTAGE ON BUILDING SITE IN NIGERIA (A Case Study of Kaduna State)
» ABSTRACT Having the necessary skill, ability, knowledge in minimizing wastage of materials on building is a goal to which every building firm no matte...Continue Reading »Item Type & Format: Project Material - Ms Word | 61 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
6. RELIABILITY ANALYSIS OF A PRESTRESSED CONCRETE BEAM
» CHAPTER ONE INTRODUCTION 1.1 PREAMBLE Prestressed concrete beam is one of the most widely used construction element in bridge projects around the worl...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
7. Challenges Of Low Cost Housing Delivery In Nigeria (A Case Study Of Imo State)
» ABSTRACT The world of building Industry is very wide and reaches which covers all areas like production, Building maintenance, project management, pro...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
8. INVESTIGATION ON THE CAUSES OF PAVEMENT FAILURE ALONG HILLVIEW OFF ESBS ROAD ENUGU
» CHAPTER ONE 1.1 INTRODUCTION The site under investigation is Hillview of ESBS Road Enugu. Along the site failures are observed especially depress on p...Continue Reading »Item Type & Format: Project Material - Ms Word | 40 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
9. THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA (A CASE STUDY OF ENUGU STATE)
» ABSTRACT This project is purposely for determining the effects of delay and disruption on the cost of building construction project in Nigeria, ascert...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
10. THE DESIGN AND CONSTRUCTION OF BURGLARY PROOF
» CHAPTER ONE 1.1 INTRODUCTION Protector design is the joining of metals of pipes of the same diameter. Sizes together in a compound pattern in order to...Continue Reading »Item Type & Format: Project Material - Ms Word | 39 pages |
Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT